Get complete information related to latest Loading Pad Shoe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Loading Pad Shoe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Loading Pad Shoe Tenders.
Tender For supply of modified brake hanger lever (outer) as per rdso drg. no. skel-4551 alt.- 2 r ef 1 to 7 with grey paint. [ warranty period: 30 months after the date of delivery ]
Tender For supply of lever hanger of modification in icf bogie for use on brake vans ( with bmbs) to drg. no. wd- 04050-s02 item no. 3 alt. 4 [ warranty period: 30 months after the date of delivery ]
Tender For supply of steel cl-1, case harden pin for brake head hanger lever ( in board) for wap-4 locos,clw drg. no. 03/4/19/76 alt- 4. [ warranty period: 30 months after the date of delivery ]
Tender For supply of flat split pin cotter size-5x12x71 mm, as per is-2638/1974,and is-549/1974. it is being used i n locking of brake hanger pin of wag-7 loco. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of modified safety clamps for brake hanger pins of wap7 & wag 9hc locos as per ref nos 1 & 2 of s.c.rly drg no.c/els/lgd/bogie/4/129 . set consists of two items as follows 1) 'l' clamp- 01 no. 2) 'c' clamp with 135 mm as against 125 mm- 01 no. one sample to be get approved before effective bulk su pply. [ warranty period: 30 months after the date of delivery ]
Tender For supply of outer brake block hanger as per drawing no. ohe/m3/br/011, suitable for tower wagon mark iii. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of hanger lever pins for brake rigging of wap7/wag9 loco to rdso drg. no skvl-585 sh-2 alt-2 ref- 27, 28, 31, 33, 35, 38 (qty 08 nos each), ref- 30, 32, 36 (qty 16 nos each), re f-34 & 37 (qty 04 nos each). material irs: r-65/78. (11 items 104 nos). note: items under ref.30 & 37 should have m 10 untapped hole. [ warranty period: 30 months after the date of delivery ]