Get complete information related to latest Locking Bar Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Locking Bar Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Locking Bar Tenders.
Tender For supply of under frame arrgt for emu c to drg no.(573)icf/mrvc/c/bt-1-1-001, alt 'k' col 2. firm shall fulfil the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : the underframe should be supplied as normal side up and side bearer side down. packing condition as per drg no. icf/j&t/misc-2487, alt 'b' stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For auction sale of depot ferrous scrap - scrap ms structures wagon and coaches including rusty and dusty, angle, channel, all type pipe ms/gi/ss attachment and loose, fancing, battery boxes, all type box, ladder, tie bar, sturucture of office building/ quarters /shed and other buildings, shed main gate, all type small cylinder, sole bar, head stock, round bar, tank, a c duct, gaurd seat,sheet plate ms/ss, lashing post, wagon cutting of ms/ s.s., nut, bolt, rivet, all type frame, all sort and sizes with or without minor undetachable non-ferrous attachment. note-cutting allowed for easy loading. [qty on approx basis].
Tender For corrigendum : supply of sole bar (2750 mm long) to bpl drg. no. crw/sk-565, alt. nil with one coat of zinc chromium red oxide. material & specification as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For supply of corten steel underframe complete for lwcbac coaches with stainless steel sole bar to drg.no. 85611001, col.i, alt "h". sole bar shall confirm to rdso specn.ck-201 corrigendum no-01 & amendment no-01. grade x2crni12 with yield strength of minimum350 mpa the schedule of technical requirement as per icf/md/specn.147, rev-02 with amendment-01. note: irs m41 material shall be used in sole bar instead of ss 301 l. special condition : packing condition as per drg.no. icf/j&t/misc-2487 alt'b'. the underframe should be supplied as normal side up and side bearer side down. [safety item ]
Tender For supply of underframe complete for lwlrrm amrit bharat coaches to drg. no.lp11103,alt d, anx 9 without item 30 to drg. no.1.11012.0.03.095.001 with additional brackets to drg no 53811115, alt 'a'. the manufacturing facility as per icf/md/spec-147, issue status-01, rev-02 with amendment no.'02'. special condition : the underframe should be supplied as normal side up and side bearer side down. packing condition as per drg no. icf/j&t/misc-2487, alt 'b'. stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion.[safety item ]
Tender For supply of set of sole bar bogie earthing arrangement for bvzi wagon as per drg. no. -wd-072023-s-iii item 1 to item 7 (quantity per set as per item quantity in drawing). [ warranty period: 30 months after the date of delivery ]
Tender For supply of sole bar bogie earthing arrangement for bvzi wagon as per drg. no.-wd-072023-s-iii, item no.1,2,3,4,5,6&7. detail of qty of items in one set as per annexure-a attached. [ warranty period: 30 months after the date of delivery ]
Tender For auction sale of others - lot no.1 u/s & scrap, condemned of sole bar, d tube, foot step, headstock, part pillar, gross member, top flange, nuts, bolts, fastners, split pin (various kind), small fitting damaged wheel disc, axle guide helical spring, fire extinguishers & other miscellaneous ferrous scrap, total qty in mt (approx) - 14 mt
Tender For supply m.s. plate ( lockingbar assembly ) required for 1:8.5 tws turnout , it consist 2 nos ms plate as per rdso drawing no :-rdso/s-3462a & rdso/s 3404a, as per drawing attached along with all the insulation required (02 nos insulation plate,4 nos nylon washer & 4 nos nylon bush). approval of material sample should be taken from consignee before bulk supply. material should supply at consignee depot sse/s/m/jbp. this item is not available in gem [ warranty period: 30 months after the date of delivery ]
Tender For supply of sole bar for boxnhl wagons, conforming to rdso drawing no. wd-22093-s-22,alt.3 or latest, item no.3 and rdso specification no.wd-01-crf-12 (rev.1) of jan 2016 or latest. [ warranty period: 30 months after the date of delivery ]