Get complete information related to latest Lower Spring Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Lower Spring Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Lower Spring Tenders.
Tender For supply of boss for lowerspring beam. drawing no. : icf's drg. no. t-0-5-661, alt. g / 3, item no.1. material and specification : is: 2062 / 2011, amend. 1 / 2012, gr. e250a. [ warranty period: 30 mon ths after the date of delivery ]
Tender For supply of set of nested snubber spring outer & inner spring for lwlh25 bogie of boxns wagons to rd so drg. no. wd-13012-s-07 alt. 1 or latest, item no-1&2. confirming to rdso specification no.-no. wd-01- hls-94 (rev.4) of july-22. [item is reserved for rdso approved source only. sub item id-3100228001 ]
Tender For supply of lowerspring seat for axle box guide arrangement icf drg no. dl-0-1-103, co l-ii, alt: z/14. [ warranty period: 30 months after the date of delivery ]
Tender For supply of lowerspring seat for motor coach (fabricated) drg to icf drg no : emu/m-0 -1-020, col. i, item-1 and 2 alt : l(small l ) / nil. [ warranty period: 30 months after the date of deli very ]
Tender For supply of lowerspring seat with tube for axle box guide arrangement (bg). drawing - dl-0-1-10 3, alt-z/14, col-ii. mat. spec. - as per drawing. [ warranty period: 30 months after the date of deliver y ]
Tender For supply of set of nested snubber spring outer & inner for lwlh 25 ton bogie of blcs wagon. drawing no. :rdso s drg. no. wd-13012-s-07, alt.01or latest, item nos. 1 & 2. material and specification : as per dr awing and conforming to rdso s specification no. wd-01-hls - 94 (rev. 4) of june 2022 or latest. [ warra nty period: 30 months after the date of delivery ]
Tender For supply of equalising stay complete without bushes for lowerspring beam (16.25t axle load bogie) for bg coaches to rdso drg.no. cg-11060 alt.-3. matl. & specn. as per drg. [ warranty period: 30 months after the date of delivery ]