Web Analytics Made Easy - StatCounter

Marine Engine Spares Tenders

Get complete information related to latest Marine Engine Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Marine Engine Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Marine Engine Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :39419459 Due date: 07 Mar, 202507 Mar, 2025 NA
Tender For providing of repair and overhauling service - 4223 repair rate contract for repairs routines on cummins make diesel alternators and main engines in ships; diesel alternators and main engines; yes; buyer premises

CTN :39419493 Due date: 13 Mar, 202513 Mar, 2025 NA
Tender For deequipping and destoring ofinfac t82 - 1 removal of fwd gun mount, qty-01. 1 no 2 removal of aft gun mount, qty-01. 1 no 3 blanking of fwd gun mount post, qty-01. 1 no 4 blanking of aft gun mount post, qty-01. 1 no 5 removal of small arms post- qty-02. 2 no 6 ra for removal of capstan. 1 no 7 blanking for weather proofing post removal of capstan. 1 no 8 removal of soft patches for both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 9 fitment of soft patches post removal of both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 10 removal/ degutting of both main engine and asd pump. 2 no 11 manufacturing of cradle (mat iron) and box (matwooden) for transportation of main engine.qty - 02. 2 no 12 manufacturing and fitment of dead weight and bilge plates. 1 no 13 removal of both main engine compensator bellow, qty 04. 4 no 14 removal of both main engine fuel water separator, qty 02. 2 no 15 removal/ degutting of both gearbox. 2 no 16 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of both gearbox. qty - 02. 2 no 17 manufacturing and fitment of dead weight and bilge plates for both gear box. 18 manufacturing and fitment of dead weight for both asd - 14 2 no 19 manufacturing and fitment of dead weight for both propellers. 2 no 20 removal/ degutting of ac plant and its auxiliary. list of auxiliaries:- (a) tev (thermostat expansion valve. (b) heat exchanger (condenser). (c) heat exchanger (chiller). 1 job 21 manufacturing and fitment of dead weight for ac plant. 1 no 22 decouple and removal/ degutting of fwd da 1 no 23 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of fwd da. 1 no 24 manufacturing and fitment of dead weight and bilge plates for fwd da. 1 no 25 decouple and removal/ degutting of aft da. 1 no 26 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of aft da. 1 no 27 manufacturing and fitment of dead weight and bilge plates of aft da 1 no 28 removal of hp pump of ro plant. 1 no 29 removal/ de-gutting of ro plant. 1 no 30 manufacturing and fitment of dead weight and bilge plates for ro plant 1 no 31 removal of soft patches for aft da and ro plant. 1 job 32 fitment of soft patches for aft da and ro plant. 1 job 33 removal/ de-gutting of mcs 5 control system with it s auxiliary. list of auxiliaries:- (a) lop 02 (b) junction box 02 (c) rcs 04 (d) ecs -02 (e) throttle lever 04 1 job 34 blanking of patches post removal of mcs 5 control system to maintain weather proofing. 1 no 35 removal/ de-gutting of asd steering control box with accessories and it s auxiliary. list of auxiliaries are as follows:- (a) steering trim indicator 02 (b) main control 1 job page 3 / 13 panel 01 (c) asd controller 01 (d) trim controller lever 02 36 blanking of patches to maintain weather proofing for asd control box system. 1 no 37 removal of halon bottle 2 no 38 removal/ de-gutting of both shaft & support bearing 2 no 39 manufacturing of cradle (mat iron) and box (wooden) for transportation shaft & support bearing. qty 02. 2 no 40 requirement of tractor & trailer for shifting of items from ship to center for 20 days. 20 days 41 transport requirement (01 tonner) for shifting of items from ship to center for serviceability checks, 40 days. 40 days 42 requirement crane with sling (15,10,05,02 and 01 ton) for 40 days 40 days 43 removal of radar vm display, atu and antenna. 3 no 44 removal of existing cables of radar vm. 3 no 45 blanking and fitment of patches to maintain weather proofing 1 no 46 ra for degutting and de-equipping of ecdis display, ups, processor unit and interface unit with removal of cables. 4 no 47 removal of wind speed sensor and its dispaly unit and cables 1 no 48 blanking and fitment of patches to maintain weather proofing 1 no 49 removal of mss mk ii system, antenna and cables. 2 no 50 mk ii blanking of patches to maintain weather proofing. 1 no 51 removal of 07 in number navigation and emergency light. 7 no 52 manufactu

Central Government/Public Sector

CTN :39419690 Due date: 24 Feb, 202524 Feb, 2025 98.91 Lacs
Tender For providing of repair and overhauling service - w5 7500 hrly routines on 03 main engines of icgs amrit kaur; w5 7500 hrly routines on 03 main engines of icgs amrit kaur; yes; buyer premises

Central Government/Public Sector

CTN :39430217 Due date: 03 Mar, 202503 Mar, 2025 1.12 Crore
Tender For providing of custom bid for services - overhauling of beml bs6d170 engines

Central Government/Public Sector

CTN :39430218 Due date: 03 Mar, 202503 Mar, 2025 1.72 Crore
Tender For providing of custom bid for services - overhauling of cat3412 heui engines

CTN :39430989 Due date: 03 Mar, 202503 Mar, 2025 NA
Tender For providing of custom bid for services - annual maintenance contract for reconditioning and calibration of fuel injectors of deisel engines of fire water pumps at bpcl bina refinery

Central Government And Public Sector

CTN :39431063 Due date: 13 Mar, 202513 Mar, 2025 5.00 Lacs
Tender For supply of both side engines swivel brackets need to be checked if require the same to be repaired or replaced , both gear boxes overhauling to be carried out , engine gasket kit need to replaced and water line need to cleaned , fly wheel damaged need to be repaired or replaced , starter motor servicing nee to carried out

Central Government And Public Sector

CTN :39431084 Due date: 13 Mar, 202513 Mar, 2025 5.00 Lacs
Tender For supply of controle cables need to be replaced , batteries are not holding charge and same need to be replaced , battery are not holding charge due to the battery cables need to be check if require the same to be rectified or replaced , battery switch is not working to be repaired or replaced , fuel hoses from main tanks to ru tank need to be check if require the same to be rectified or replaced , water separator are not working to be repaired or replaced , prime bulb is not working to be replaced , navigation lights need to be checked , if require the same to be repaired or replaced , cabin light need to be checked , if require the same to be repaired or replaced , bilge pump is not working to be repaired or replaced , toggle switch is not working to be rectified or replaced , electric wires are damaged and need to be replaced , battery leg and terminals are damaged and need to be replaced , controle box set is not working to be repaired or replaced , antifouling paint work need be carried out to enhance a vessels performance and durability , both engines overhauling to be carried out , both gear boxes overhauling to be carried out , both side engines swivel brackets need to be checked , if require the same to be repaired or replaced , fuel tanks need to be cleaned

Central Government And Public Sector

CTN :39431086 Due date: 13 Mar, 202513 Mar, 2025 5.00 Lacs
Tender For supply of star board engine overhauling to be carried out , star board trim overhauling to be carried out , 300 hourly service of port engine to be carried out , oil pump service for the both side engine to be carried out , both side engines swivel brackets need to be checked , if require the same to be repaired or replaced , fuel tank or reserve tank need to be cleaned

CTN :39431115 Due date: 13 Mar, 202513 Mar, 2025 3.37 Lacs
Tender For providing of custom bid for services - labor charges for packing of beml hmv engines
 Loading, Please wait...

Connect us via What's Up