Get complete information related to latest Masonary Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Masonary Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Masonary Work Tenders.
Tender For supply of 4500nos of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonarywork 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure pole [excluding c
Tender For supply of floor tiles , wall tiles , granite work , electrical work , windows , door or mesh door , renovation of kitchen , renovation of toilets and bathrooms , white cement based putty and distempering , painting including priming coat of exterior primer applied , renovation of wardrobe , civil or masonarywork , misc work , drainage work , fencing work , main gate , wall paper
Tender For supply of floor tiles , wall tiles , electrical work , windows , door or mesh door , renovation of kitchen , renovation of toilets and bathrooms , white cement based putty and distempering , painting including priming coat of exterior primer applied , renovation of wardrobe , civil or masonarywork , misc work , renovation of type 3 q no 22 , renovation of type 3 q no 28
Tender For a) scope of work covers supply, installation and commissioning of total 12 nos.of 3d radar level transmitters for the coal level measurement in raw coal bunkers of rtps-unit-5&6 with required pcs, electronic modules, splitters, modems, junction boxes, mounting kit, enclosures, interconnecting cables, software and all other accessories required to make the system complete and fully functional, shall be provided for continuous level measurement and monitoring of level of each coal bunker and also to ensure satisfactory performance of the system commissioned at rtps site which shall be on the basis of single point responsibility, completely covering the activities and services in respect of all the equipment works specified and covered under the specifications. the work involves i) installation and commissioning of 12 nos. 3d radar level type level transmitters with suitable mounting accessories, display indicators, isolators, annunciator, smps, terminals, panel internal wiring, led bulbs, door switch etc. at the bunker level ii)commissioning of rs 485 communication /other cables from bunker level transmitters to the desktop pc at u-5&6 control rooms.iii)commissioning of desktop pcs for 3d multi vision for monitoring of all the 12 bunkers level at u-5&6 control room respectively and also both units bunker levels at pc being installed at chp control room. iv)loading of all the required licenced software to the desktop pc for 3d radar level transmitter and cable routing, glanding, mounting of cable tray, termination and ferruling is in the contractors scope.cable trays will be provided by m/s.kpcl.b)all fabrication works required for installation and commissioning of instruments with jbs,protective cover/canopies and allied works are in contractor/agency scope itself.c) all civil works like drilling/cutting rcc floors,grouting,refilling floors,conduiting under ground cables cable tray mounting, masonaryworks are in contractor/agency scope itself.d)storage of materials while executing works is single point responsibility of contractor/agency scope itself. e)software details-1. the page containing all bunker level data shall be in full page which must be visible from at least a distance of 6-8mtr .(font size should be more) and shall have a historical trend storage for minimum 45days & real time trend with not less than15min sampling time. f) at chp control room, the existing kpcl pc shall be enabled with bunker level software & shall be communicated through existing lan and as a redundancy the seperate optical fiber cable communication with media convertor has to be provided.the lan cables has to be protected with cable conduit g)materials supply shall be completed in all respect within the stipulated period as per the contract. materials shall be delivered to rtps site through ee(stores)o&m. unloading of materials at rtps site location and shifting of the same to work location is under the contractor/agency scope only. h)handling, shifting, unpacking and erection and commissioning of the entire system shall be under the scope of bidder itself. i)all required consumables, hardware and licenced software, accessories and any other materials which are not included in the scope and required for successful installation and commissioning of the 3d radar level transmitters for the coal level measurement in raw coal bunkers of rtps-unit-5&6 are under the contractor/agency itself. j)all the materials required for the installation and commissioning of 3d radar level transmitters for the coal level measurement in raw coal bunkers of rtps-unit- 5&6 shall be made as detailed under the technical specifications. k)interfacing of all the bunker level transmitters outputs to the desktop pcs at u-5&6 control rooms through rs - 485 communication protocol.(the required 1 pair x 1 sq.mm shielded armoured cables as per requirements shall be supplied approx-500 meters or if more). for more details of scope of work refe