Tender For t30-1, shock pulse meter for bearing testing of traction motor with shock pulse measurement, vibration measurement of all three parameters (displacement, acceleration & velocity), laser tachometer measurement, stethoscope for easy location of machinery noise, lcd display, along with standard supply: shock pulse probe, head phone, vibration sensor, powerful magnetic base, hand held probe rod, cable with connectors, laser tachometer probe, charger, instrument manual. make/brand: spm/skf/truftechnik only. detail specification as per annexure. (warranty - one year)
Tender For bid to ras corrigendum : supply of physics laboratory equipment - ultrasonic distance meter , newton ring experiments set up , michelson interferometer standard model , kundt tube apparatus , torsional pendulum , yong modulus for bending , diode laser assembly , uniform and non-uniform bending of beam , superconductivity experiment kit , determination of energy band gap , apparatus for hook law verification , cantilever depression , spectrometer goniometer , measurement of wavelength of laser
Tender For corrigendum : tender for supply of sitc of ip epabx system and accessories with semiskilled manpower deployment d d - sitc (supply installation testing commissioning ) of dual server gateway based ip pbx system in raid 1 storage configuration (1set equals 2 nos) , sitc of management platform inclusive of management software with liscence (1set equals 2 nos) , itc of executive ip phones with 2 way speaker phone (installation , testing and commissioning) , supply of executive ip phones with 2 way speaker phone , itc of poe based ip phones (installation , testing and commissioning) , supply of poe based ip phones , sitc of corded analog phone with cli , sitc of pc based ip operator console in raid 1 storage configuration with liscence version of software(latest) , sitc of laptop based ip operator console with liscence version os and ms office (latest) , sitc of 24 port l2 plus managed poe plus switch with fully loaded sfp modules single mode transceiver. , sitc of 16 port l2 plus managed poe plus switch with fully loaded sfp modules single mode transceiver. , sitc of 8 port l2 plus managed poe plus switch with fully loaded sfp modules single mode transceiver. , supply of cat 6a cable industrial grade including capping , casing , conduiting fasteners with all materials. , itc of cat-6a cable (for boq item 19) industrial grade including capping , casing , conduiting fasteners with all materials at various locations within aai premises.payment on actual per meter measurement basis. , supply of cat 6a utp patch cord 3 meter each. , supply of 3 core power cable 2.5mm each core. , itc of 3 core power cable 2.5mm each core.payment for laying will be on actual per meter measurement basis only. , sitc of intermediate distribution frame idf for 100 pairs. , sitc of intermediate distribution frame idf for 20 pairs. , sitc of intermediate distribution frame idf for 200 pairs. , sitc of intermediate distribution frame idf for 400 pairs. , surge protection device for idf krone type (10 pair in each krone). , supply of 0.5mm , 50 pair copper cable (armourd). , supply of 24 core core armoured single mode ofc cable. , itc (including laying) of 50 pair copper cable (0.5mm) and 24 core armoured single mode ofc cable (including capping , casing , conduiting fasteners with all materials) with hdd laying (hdd min depth 1.65 meter)payment on actual per meter measurement basis , supply of 0.5 mm , 20 pairs telephone cable. , laying of 0.5 mm , 20 pairs telephone cable. payment for laying will be on actual per meter measurement basis only. , sitc of rack mounted ups 2 kva line interactive , 30 min backup for network switches. , sitc of rack mounted ups 1 kva line interactive , 30 min backup for network switches. , sitc of fully loaded 42u rack for epabx server its accessories with cable manager 2 pdu. , sitc of rack mounted ups 5 kva online , 60 min backup for epabx servers and gateways (1set equals 2 nos) , electrical distribution system (with industrial grade mcb) as per ip epabx system requirement (min. 32 amp.) with rccb. , sitc of 3 core power cable 6 sq. mm each core. , rack mounted load transfer switch (auto changeover switch for ups output).+c37 , surge protection device spd lan. , power surge protection device spd for 5 kva ups single phase in - single phase out. , earthing system (copper strip 25mm x 3mm , 150 meters) and 6 sqmm , 100 m cable for internal distribution. , liu 24 core with pig tail (testing of fiber termination). , rj 45 patch panel 24 port. , 12u rack for poe switches & its accessories with cable manager & pdu. , io boxes with dual rj45 ports with gang box and cover. , io boxes rj45 ports with gang box and cover. , io boxes with dual rj11 ports with gang box and cover. , integration charges of all the eqpt systems associated with ip epabx mentioned in this bill of material with existing operational equipment with operational and technical training charges for 5 personnel for 3 day including all cost components. , gpr wor
Tender For supply of hydraulics and water resource lab equipment c c - pipe friction loss apparatus with ss tank , pitot tube apparatus assembly for open channel flow , free and forced vortex apparatus with ss tank , notch apparatus with ss tank with gauge assembly , impact of jet apparatus with ss tank , metacentric height of ship apparatus with ss tank , orifice meter apparatus with ss tank , orifice setup with ss tank , venturimeter apparatus with ss tank , bernoullis theorem apparatus , pipe fittings loss apparatus, minor loss, with ss tank elbow, bend, sudden expansion, sudden contraction, valve , viscometer falling ball as per bs 188 with steel balls , pressure measurement apparatus with ss tank, u tube manometer, inclined u tube manometer, vacuum gauge, pressure gauge , stoke law apparatus , piezometer tube , pointerorhook gauge made of brass height 50cm pointer or hook gauge made of brass height 50 cm , water pumps
Tender For custom bid for services - telephone connections including multidisciplinary activities; telephone connections including multidisciplinary activities as per specification hemrl/srp/tlc/2025/08-02. 2. objective: to enable 8 new functional landline telephone connection points by executing the complete underground telecom cable network infrastructure from the nearest telecom distribution panel located approximately 300 meters away, including all civil, cabling and any works on a turnkey basis. 3. detailed scope of work a. preliminary works i. conduct detailed route survey from the nearest telecom panel to the destination point. ii. marking and measurement of the 300-meter trench path avoiding utilities and obstructions. b. civil works i. manual/mechanical trenching: 300 meters; 600 mm depth 150 mm width. ii. placement of 100 mm sand bedding before and after cable. iii. placement of warning tape 300 mm above the cable. iv. proper backfilling with soil and compaction. v.full restoration of road/pavement using cold mix bitumen or concrete as per existing surface. vi. installation of route/cable markers every 50 meters and at all joints or direction changes. c. telephone: i. cable supply and laying 1. supply and laying of 5-pair (10-core) jelly-filled, armoured copper telephone cable (cu 0.5 mm ) inside 32 mm hdpe conduit. 2. ensure minimum slack and proper looping. 3. laying and fixing of conduit in trench bed. ii. joint& enclosures 1. use of sealed heat-shrinkable cable joint kits. 2. proper waterproofjointing and crimping as per telecom standards..
Tender For supply of imechp9boq d d--simple tank type quantity meter , impeller type flow meter , magnetic flow meter , vortex flow meter , complete experimental setup for flow measurement
Tender For supply of electrical ee2 d d -experimental kit for the measurement of displacement using lvdt 6 , experimental kit for the measurement of displacement using lvdt 7 , inductive load bank 1 , inductive load bank 2 , kelvin double bridge 1 , kelvin double bridge 2 , kelvin double bridge 3 , kelvin double bridge 4 , kelvin double bridge 5 , kelvin double bridge 6 , m. i type analog ammeter 0 1 a 1 , m. i type analog ammeter 0 1 a 4 , m. i type analog ammeter 0 1 a 2 , m. i type analog ammeter 0 1 a 3 , m. i type analog ammeter 10 20 a , m. i type analog ammeter 2. 5 5 a 1 , m. i type analog ammeter 2. 5 5 a 2 , m. i type analog ammeter 5 10 a 1 , m. i type analog ammeter 5 10 a 2 , m. i type analog ammeter 5 10 a 3 , m. i type analog ammeter 5 10 a 4 , m. i type analog ammeter 5 10 a 5 , megger hand driven 1 , megger hand driven 2 , megger hand driven 3 , megger hand driven 4 , megger hand driven 5 , mi type analog voltmeter 125 250 500v , mi type analog voltmeter 300 600v 1 , mi type analog voltmeter 300 600v 2 , mi type analog voltmeter 300 600v 3 , mi type analog voltmeter 300 600v 4 , mi type analog voltmeter 300 600v 5 , mi type analog voltmeter 75 150 300v 1 , mi type analog voltmeter 75 150 300v 2 , mi type analog voltmeter 75 150 300v 3 , network theorem trainer kit 1 , network theorem trainer kit 2 , network theorem trainer kit 3 , orifice meter measurement setup 1 , orifice meter measurement setup 2 , orifice meter measurement setup 3 , phase sequence indicator 1 , phase sequence indicator 2 , rheostat 0 100 ohm,2. 5a , rheostat 0 100 ohm,5a 1 , rheostat 0 100 ohm,5a 2 , rheostat 0 250 ohm, 2. 5 a 1 , rheostat 0 250 ohm, 2. 5 a 2 , rheostat 0 250 ohm,1a , rheostat 0 50 ohm,5a , rheostat 0 500 ohm, 2. 5 a , rotameter flow measurement setup 1 , rotameter flow measurement setup 2 , rotameter flow measurement setup 3 , rtd temperature measurement setup 1 , rtd temperature measurement setup 2 , strain gauge trainer kit 1 , strain gauge trainer kit 2 , strain gauge trainer kit 3 , strain gauge trainer kit 4 , strain gauge trainer kit 5 , strain gauge trainer kit 6 , three phase load rheostat 1 , three phase load rheostat 2 , three phase load rheostat 3 , three phase load rheostat 4 , three phase load rheostat 5 , three phase power factor meter 1 , three phase power factor meter 2 , three phase power factor meter 3 , three phase power factor meter 4 , three phase power factor meter 5 , three phase synchronous motor coupled with dc shunt generator setup 1 , three phase synchronous motor coupled with dc shunt generator setup 2 , three phase synchronous motor coupled with dc shunt generator setup 3 , three phase synchronous motor coupled with dc shunt generator setup 4 , three phase veriable resistive load 1 , three phase veriable resistive load 2 , three phase veriable resistive load 3 , transmission line protection simulation kit 1 , transmission line protection simulation kit 2 , transmission line protection simulation kit 3 , transmission line protection simulation kit 4 , transmission line simulator 1 , transmission line simulator 2 , transmission line simulator 3 , undrground cable fault locator 1 , undrground cable fault locator 2 , undrground cable fault locator 3 , venturi flow measurement setup 1 , venturi flow measurement setup 2 , venturi flow measurement setup 3 , wattmeter 0. 5 1a, 150 300v low power factor , wattmeter 10 20 a ,150 300 600v unity power factor 1 , wattmeter 10 20 a ,150 300 600v unity power factor 2 , wattmeter 10 20 a ,150 300 600v unity power factor 3 , wattmeter 10 20 a ,150 300 600v unity power factor 4 , wattmeter 10 20 a //bid details2 / 127,150 300 600v unity power factor 5 , wattmeter 10 20 a ,150 300 600v unity power factor 6 , wattmeter 2. 5 5a , 150 300v unity power factor 1 , wattmeter 2. 5 5a , 150 300v unity power factor 2 , wattmeter 2. 5 5a , 150 300v unity power factor 3 , wattmeter 2. 5 5a , 150 300v unity power factor 4 , wattmeter 5 10 a ,150 300 600v unity power factor 1 , wattmet