Get complete information related to latest Metal Pallet Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Metal Pallet Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Metal Pallet Tenders.
Tender For supply and installation of heavy duty shelving storage rack for traction motor with metalpallets (size-3 460 mm (c/l) x 1400 mm d x 4800 mm h,total load bearing capacity: 18 ton) as per specification attached. [ warran ty period: 30 months after the date of delivery ]
Tender For supply and installation of heavy duty shelving storage rack for auxiliary motors with metalpallets (size- 2440 mm (c/l) x 1200 mm d x 3600 mm h,total load bearing capacity: 03 ton) as per specification attached. [ warra nty period: 30 months after the date of delivery ]
Tender For supply of shell sub assly kit for lhb scn coaches, as per drawing: mp25kitscnab versio n 0, packing instruction: returnable & re-usable metallic pallet item should be supplied in returnable & re-usable pallet made of steel. the design of the pallet should be : " wate r and fire proof. " rust free. " having good strength to weight ratio. " suitable for sta cking in several layers, compatible with each other when stacked. " able to withstand the rough handling of common logistic systems such as fork lifter, cranes etc. " able to facilitate the storing, handling and unloading with minimum labour and time. " havi ng the interior of the pallet lined with suitable material (like frp ) so as to prevent da mage to the item being transported. while stacking the item inside the pallet, there sh ould be minimum use of disposable packing. " the pallet should have firm's logo for ide ntification. firm should also indicate pl no., description of item on the pallet. note : 1.f or packing the individual item(s), the use of material which are not environment friend ly such as wood/polyethene/plastic is prohibited, however the environment friendly pl astic can be used. 2.the item should be packed in such a way that it should not rub duri ng transportation. the in-transit damage, if any, shall be at cost of the supplier. 3.the design to be got approved by the firm from cde/rcf before initiating manufacturing. [ warranty period: 30 months after the date of delivery ]