Tender For operation & maintanance of microirrigationsystem for 9900ha command area comes under shiggaon lift irrigationsystem includes intake canal,jackwell/pumphouse,m. s raising main pipeline, delivery chambers,110/6.6 kv substation,and micropipeline with hdpe/ pvc pipe line network, discharge control valve, air valve, panel cum store rooms, 119 nos sumps , 110/33 kv (1no) and 33/11 kv (2 nos) electrical substations, electrical distribution network,diversion weir,gates and dg rooms for fourth year.(from 2026-27 to 2027-28).
Tender For improvments to irrigationsystem of kanamma tank in konthangi village in shankavaram mandal (under district mineral foundation trust) jaladhara-jalaharathi programme
Tender For improvements to irrigationsystem of pujari jagganna tank in nellipudi village in shankavaram mandal (under district mineral foundation trust) jaladhara-jalaharathi programme
Tender For improvements to irrigationsystem of balaraju tank in konthangi village in shankavaram mandal (under district mineral foundation trust) jaladhara-jalaharathi programme
Tender For improvement to service road of 13th distributary in between rd 0.00km to 8.00km and 12th distributary from rd 00km. to 2.00km. and 14th distributary in between rd 00km. 9.80km of rushikulya irrigationsystem.
Tender For construction of pressurized pipe system to supply water for solar microirrigation to deliver at farmers field up to 1 ha with a duty of 0.84 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for micro pressurized irrigation in distt. bilaspur in 135 ha. in kharif ( left side of bhaisajhar lift irrigation scheme. as indicated in index map), out of total gross command area, 135 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of bhaisajhar lift irrigation scheme as indicated in the index map for microirrigationsystem without exceeding total power requirement for solar pumps with solar panel it includes all activities starting from investigation , planning ,design, drawing, construction of underground distribution network for microirrigationsystem down to 1 ha chak in 8 ha consisting of providing, laying & fixing of all types of pressurized pipe lines with all necessary valves to serve as main line, branch line, distributaries, minors and sub-minors of pressurized irrigationsystem of bhishajhar lift irrigation project (to serve total cca not less than 135 ha in kharif ) including providing control at 4 ha and 2 ha with fixing multiple outlets with duty of 0.84 lit/sec/ha upto 4 ha and distribution network up to 1 ha chak, to serves the area as shown in index map with discharge of 3 times the specified duty at 1 ha chak including scada & successful trial run and commissioning and as per scope work and as directed by engineer-in-charge.. the work also includes formation of fpo as per company act/rule, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work. mou between agency and fpo to operate scheme after 05 years of mom and dl period and to arrange linkage facility to the fpo
Tender For construction of pressurized pipe distribution network lift irrigation scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for pressurized irrigation by rotation in village kapua, block -patharia ,dist. -mungeli in 160 ha. in kharif (right side of khairi anicut as indicated in index map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of khairi anicut as indicated in the index map for irrigationsystem without exceeding total power requirement for solar pumps with solar panel of 100 kwp.it includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , scada work with automation etc. for supply of filtered water for irrigation under pressure. the work also includes construction of chowkidar quarter, pump house, installation of solar power plant and sub station with transformer of required capacity by liasoning with cseb, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work