Tender For providing consultancy service for pressurised irrigation network system to villages of arnala, dhagadmal, kakadkopar, sukhala ta. kaparada & pardi, dist. valsad for constructing of various new lift irrigation schemes 1. arnala-dhagadmal, 2. kakadkopar-2 and 3. sukhala by lifting from drbmc.
Tender For const of budhihal feeder from sangola main canal ch 4580 m and its distribution network including running operation and maintenance of whole system for 5 years after completion of work for tembhu irrigation scheme tal sangola dist solapur
Tender For fifth revised estimate of the interstate tillari irrigation project-canal network in goa. reg.strengthening of b6 distributary of rbmc of tip from ch.0.100kms to ch.0.440kms by providing 100mm thick rcc lining at village torxem in pernem taluka.
Tender For corrigendum : construction of pipe distribution network and cadwm work of sub branch-2 at rd 44300 m of ghodazai branch and gadmaushi minor for creating irrigation potential of 3000 ha.
Tender For providing lift irrigation scheme from the krishna river to the lands of farmers karamadi, sanadi & aihole of morab village (site-2) additional distribution network in raibag taluka, dist-belagavi (scp/2025-26) (2a category)
Tender For construction execution of micro irrigation scheme for sonegaon stage2 rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 2295 ha. culturable command area (cca) with pipe distribution network and micro irrigation system
Tender For fifth revised estimate of the interstate tillari irrigation project canal network in goa, regarding strengthening and modifications by rcc lining of 100 mm thick for revora i distributory from ch. 705 mts to ch 1211 mts of left bank main canal of tip
Tender For fifth revised estimate of the interstate tillari irrigation project canal network in goa, regarding strengthening and modifications by rcc lining of 100 mm thick for revora i distributory from ch. 200 mts to ch 705 mts of left bank main canal of tip
Tender For construction of a 2500-seat open air amphitheatre at nit warangal, telangana, including internal water supply and sanitary sanitary installation, external service connections, internal electrical installations, lifts, supply, installation, testing and commissioning of internal cctv and lan systems, site development with levelling, internal roads and paths, external sewerage, filtered water supply, storm water drains, horticulture works with irrigation network and external cctv surveillance and led street lighting.subwork/packages:providing inspection vehicle for the assistant engineer (e), cpwd, warangal on hire basis for the rear 2025-26 for 10 (ten) months
Tender For construction of pressurized pipe distribution network lift irrigation scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for pressurized irrigation by rotation in village kapua, block -patharia ,dist. -mungeli in 160 ha. in kharif (right side of khairi anicut as indicated in index map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of khairi anicut as indicated in the index map for irrigation system without exceeding total power requirement for solar pumps with solar panel of 100 kwp.it includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , scada work with automation etc. for supply of filtered water for irrigation under pressure. the work also includes construction of chowkidar quarter, pump house, installation of solar power plant and sub station with transformer of required capacity by liasoning with cseb, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work.