Tender For corrigendum : providing 1 no150 mt class capacity mid range crawler crane having lattice boom and fix jib with critical load lifting capacity of 12 mt min below hook at around 22 m min radius with main boom and to obtain clear height below hook of 55 m min above g
Tender For corrigendum : 01 no.400 mt or higher capacity crawler crane along with full counter weight and complete accessories (as per nit), experienced operator with valid heavy license, etc with full configuration complete in all respect , as mention in nit.
Tender For corrigendum : engagement of agency(s) for hiring of 01no.150mt capacity crawler crane minimum 76 mtr.boom length along with 31 mtr.fixed / luffing jib and all other accessories on monthly rental basis in connection with composite works for avu unit, part-a panipat
Tender For corrigendum : engagement of agency(s) for hiring of 01 no.250 mt capacity crawler crane with minimum 85 mtr. main boom length, 30 mtr. fixed jib length 60 mtr. luffing jib length and all other accessories on monthly rental basis in connection with composite works
Tender For engagement of agency(s)for hiring of 01no.150mt capacity crawler crane min 76mtr.boom length along with 31mtr.fixed/luffing jib and all other accessories on monthly rental basis in connection with piling,ug and civil/structural works uand o-p area
Tender For corrigendum : providing 1 no. 150 mt class capacity mid range crawler crane at lara super thermal power plant project, stage ii project, raigarh, chhattisgarh.
Tender For corrigendum : hiring of 01 one no 75 mt capacity crawler crane 120 feet boom length for loading and unloading of store material and also loading of reinforcement steel for our crude oil import terminal coit project for numaligarh refinery limited at paradip
Tender For corrigendum : transportation of company s old and used 01 no. 75 t cap. tata make 955 alc crawler crane including all accessories and spare materials box from ntpc nkstpp boiler project tandwa dist chatra jharkhand to our gail usar proejct site, pdh-pp project