Web Analytics Made Easy - StatCounter

Mooring Launch Scrap Tenders

Get complete information related to latest Mooring Launch Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Mooring Launch Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Mooring Launch Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :39384280 Due date: 11 Mar, 202511 Mar, 2025 2.56 Crore
Tender For tender for supply of nut lock , hose flexible , connector male , hose flexible , hose flexible , barrel governor , gasket set fuel pump , cap filler , connection , air intake , rpm sensor /probe , hose , flexible , hose , valve , intake , exhaust valve , collet , valve , spring , valve , rotator , valve , plug pipe , plug , pipe , plug expansion , plug , expansion , plug expansion , insert , valve , cyliner liner kit kt3067 , guide , valve stem , set , marine upper eng gsk , set , lower engine gasket , seal , oil , seal o ring top , seal , d ring , insert liner , kit engine piston , set piston ring , connecting rod bearings , pump , sea water , ball connecting rod , harness , etr cnt mdl wrg , dowel ring , clip , bushing camshaft , drain cock , seal , o ring , flexible hose , hose flexible , clamp , v band , hose , flexible , coupling , flexible , clip , inhibitor , corrosion ( premix 10 lt) , injector , sensor , pressure , turbocharger , hx80 , connection oil transfer , pump , fuel , connection , water inlet , sensor engine speed , harness , wiring , harness , wiring , harness , wiring , switch , coolant level , water temp sensor , sensor pressure , sensor pressure , switch , micro , switch , pressure , switch , temperature , sensor temperature , transceiver , connection flexible , housing , fuel pump , cover , f p front , retainer , injector cup , tappet , hyd var timing , valve , float , gasket , connection , connector , male , connector , tube , union , male , hose , flexible , hose , flexible , hose , flexible , hose , flexible , hose flexible , barrel governor , seal , o ring , pump , raw water , gasket , connection , seal , rectangular ring , washer , screw , twelve point cap , retainer valve spring , insert valve , washer connecting rod , seal o ring , nut lock , gasket governor set , clamp , hose , screw , hexagon head cap , screen filter , cap , fuel pump filter , washer , lock , diaphragm , fulpumpdamper , ball check , seal o ring , cup injector , pin , roll , gasket , seal injector , gasket water pump , gasket water pump , o ring condensor , gasket , seal , o ring , seal , o ring , plunger , governor , plunger governor , diaphragm , seal ring , shim , seal o ring , shaft , fuel pump drive , key , pump , gear fuel , kit barrel plunger & cup , plug injector orifice , seal of o ring , seal , o ring , seal , o rings , seal , o ring , seal o ring , screw , hexagon head cap , piston air fuel control , nut lock , seal o ring , washer plain , piston air fuel control , nut lock , shim , shim , shim , gasket , fuel pump , gasket , fuel pump , gasket fuel pump , seal oil , valve , shutoff , actuator etr fuel control , screen filter , retainer , injector spring , cap. tappet top stop , nut , tappet top stop lock , seal oring , seal , o ring , seal , o ring , hose plain , hose , flexible , hose flexible , hose , flexible , seal , rectangular strip , seal o ring , hose , flexible , inhibitor , corrosion , ring , retaining , seal kit , bearing , ball , kit stc tappet repair , radiwash_3ltr , pump , water , seal , o ring , gasket , seal , o ring , gasket , flange , coupling , flexible , hose flexible , hose flexible , plug , gear cover , screw , hex flange head cap , o ring turbo drain , seal ferrule , screw , slotted set , washer sealing , screw , banjo connector , seal o ring , screen , filter , sealing ring , seal , o ring , cap fuel pump filter , spider , jaw coupling , screw , hexagon head cap , gasket , connection , seal dust , gasket , wtr trf connection , thermostat , gasket thermostat engine , gasket , connection , hose , plain , gasket , intake manifold , seal , o ring , seal o ring , hose , hump , hose

State Government

CTN :39370059 Due date: 27 Feb, 202527 Feb, 2025 3.00 Lacs
Tender For providing of repair and overhauling service - jafrabad marine police boat no gjmp1217 reparing as per mention defect or fult; jafrabad marine police boat no gjmp1217 reparing as per mention defect or fult; no; buyer premises

Central Government/Public Sector

CTN :39214278 Due date: 22 Feb, 202522 Feb, 2025 49.00 Lacs
Tender For corrigendum : 8167 repair maint to certain e/m marine assets and other connected items to south wharf jetty and associated areas at naval dockyard mumbai

Central Government/Public Sector

CTN :39175130 Due date: 27 Feb, 202527 Feb, 2025 4.43 Lacs
Tender For providing of repair and overhauling service - marine incinerator; marine incinerator; no; buyer premises, service provider premises

CTN :39218135 Due date: 25 Feb, 202525 Feb, 2025 16.14 Lacs
Tender For special repair to providing and erecting streetlight fittings, cable, fabricating box etc. for rb & nrb buildings & road at marine task force, honthiwandh, naliya, dist:- kutch

CTN :38984535 Due date: 20 Feb, 202520 Feb, 2025 NA
Tender For corrigendum : short refit of in ship> - ins astradharini sr-25 - hull00001dockingdocking (mt-10140)(mt-10140)(a) the refitting authority is to take all actions to ensure that the docking is carried out in accordance with the latest issue of the docking plan for the planned version of the docking which is specific to the vessel (and not generic to a class of vessels) and for a particular docking procedure. the refitting authorities are to forward docking plan, along with the check off list promulgated vide nc/policy/h-134/refit dated 11 may 18, to ihq(n)/dna through command hqs for approval. the docking facility is to be prepared in accordance with the requirements of the docking plan and docking procedures. (b) a dock master is to be appointed by the refitting authority for each docking evolution and the same is to the intimated to commanding officer/ master of the vessel as per format of no str 01/11, preferably 72 hours in advance of the commencement of docking evolution. (c) refitting authority (dock master and planner) are to review the calculation submitted by the ship. the docking/ undocking conferences are to be organised by the refitting authority (dock master and refit planner) to review readiness for docking/ undocking operations, at least 24 hours prior docking/ undocking. further, in order to understand criticality of each operation, and demarcation of responsibilities of the stakeholders, the dock master is to conduct a centralised briefing for all the stakeholders 24 hours prior every docking/ undocking operation., 00002u/w hullexternal underwater area (mt-11023)(a) remove marine fouling from entire uw external hull area using wooden scrapper or hydro jetting with maximum pressure not exceeding 3000 psi., 00002u/w hullexternal underwater area (mt-11023)(b) scrape and clean under water and boot topping area (including wind and water areas) to remove all loose paint film, rust etc. paint scheme repair/ renewal is to be undertaken iaw ihq, mod policy letter nc/0528/llps dated 20 jul 11 and ncd 1491 issue 1 of may 11 and surface preparation to be undertaken iaw with no 53/16 (note :- wind and water areas to be considered up to 500mm above boot top.), 00002u/w hullexternal underwater area (mt-11023)(c) carry out survey of external uw hull structure in accordance with no 01/15 and ihq mod (n)/ dna letter nc/7631 dated 01 nov 22 as follows :-note:- 100% visual survey of complete underwater hull and boot top including wind and water areas i.e. area up to 500mm above boot top area., 00002u/w hullexternal underwater area (mt-11023)(d) excessive areas of breakdown of abrasive anticorrosive paints to be blasted and recoated with full paint scheme. paint scheme on full underwater hull and boot top including wind and water areas i.e. area up to 500mm above boot top area is to be restored. surface preparation to be undertaken iaw with no 53/16. paint scheme repair/ repairs is to be undertaken iaw ihq, mod (n) policy letter nc/0528/llps dated 20 jul 11 and ncd 1481 issue 3 of may 11., 00002u/w hullexternal underwater area (mt-11023)(e) application of one coat of a/f paint on under water hull and boot top area to be carried out post adequate surface preparation based on the findings of joint inspection with oem. paint touch up/ maintenance painting to be carried out iaw no 53/16/ policies/ ncd in vogue., 00002u/w hullexternal underwater area (mt-11023)(f) paint scheme of all technical windows above water line to be restored iaw no 53/16. test and trials of all renewed plates are to be carried out iaw para 42 and 43 of no 01/15., 00003u/w hull (as per no 53/16)preservation/ paintingcarry out assesment based painting of external underwater hull including boot top area wherever applicable (post joint uw inspection). carry out fresh water hosing down before starting of painting. the u/w hull painting includes painting of u/w fittings, gratings and other u/w appendages as well.note:(i) warranty of paint scheme should be confirmed from
 Loading, Please wait...

Connect us via What's Up