Web Analytics Made Easy - StatCounter

Motor Control Module Tenders

Get complete information related to latest Motor Control Module Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Motor Control Module Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Motor Control Module Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39802194 Due date: 23 Apr, 202523 Apr, 2025 NA
Tender For supply and commissioning of pump motor set - specification of mono block pump: i) flow: 15 50 lpm. ii) head: 44 mtr. iii) suction: 100 mm. iv) delivery: 80 mm. specification of motor:- i)power: 25 hp ii )rpm: 3000 iii) phase : three, iv) starter: star delta, along with 1)'ci' make gate valve: 80 mm dia. 2) 'ci' make non-return valve: 80 mm dia. and 3) 'ci' make foot valve : 100 mm dia. make: kirloskar or simil ar [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :39774807 Due date: 11 Apr, 202511 Apr, 2025 NA
Tender For supply of pump,complete unit,3hpx11a,ir , 5 hp submersible pump motor set , 7.5 hp submersible pump motor set , pump,borewell,submergible with motor , submersible pump motor set, tw 9, cap 100 cub.mhr

State Government

CTN :39784512 Due date: 28 Mar, 202528 Mar, 2025 21.73 Lacs
Tender For state plan_state plan _2024_25 _ proposals under the head drinking water _drought mitigation and emergency works._drw 2025 mace.of prwss augmentation of old psa pump house_supply and erection of 30 hp submersible motor pump set._general electrical

State Government

CTN :39819440 Due date: 17 Apr, 202517 Apr, 2025 NA
Tender For installation of the new submersible pump motor set at cwr of pthardoba w/s scheme under bankura mechanical division, phe dte. block sarenga , dist bankura

State Government

CTN :39799834 Due date: 02 Apr, 202502 Apr, 2025 20.20 Lacs
Tender For work for contingency work ie replacement of panel board, submersible motor pump set, cable, deepening tube wells and replacement polluted pipe lines for uws jobner tehsil jobner, district jaipur under summer contingency plan 2025-26

State Government

CTN :39810737 Due date: 01 Apr, 202501 Apr, 2025 2.53 Lacs
Tender For construction and commissioning of 150 mm dia bore,provinding and installation of single phase tubewell including(2 year defect liability period) sub. motor pump set and machinery in ps hindoli distt. bundi.

State Government

CTN :39803520 Due date: 01 Apr, 202501 Apr, 2025 2.53 Lacs
Tender For construction and commissioning of 150 mm dia bore provinding and installation of single phase tubewell including(2 year defect liability period) sub. motor pump set and machinery in ps hindoli distt. bundi.

State Government

CTN :39813365 Due date: 02 Apr, 202502 Apr, 2025 13.12 Lacs
Tender For supply & installation of 3 phase isi marked submersible motor pump set of five star rating at different tube wells of rwss bhadesar distt. chittorgarh with two year defect liability period

State Government

CTN :39797129 Due date: 02 Apr, 202502 Apr, 2025 NA
Tender For supply and installation testing commissioning and lowering the 3hp 3 phases submersible pump motor set at small garden within midnapore central correctional home during the year 2024 25

Central Government/Public Sector

CTN :39818166 Due date: 09 Apr, 202509 Apr, 2025 NA
Tender For supply and testing of control panel with voltmeter 0-300 v , amere meter 0-30 amp , on-off p ush button , motor protection over load relay 17-24 amp , contactor 25 amp. & suitable for 3 hp single phas e submersible motor pump set with starting and running capacitor .. starting capacitor 200-250 mfd - 01 no s , running capacitor 50 mfd - 02 nos , panel size 30x25x13 cm. switch gear make:- l&t,siemens, bch,abb,minilec,havells,cg or equivelent note- : authorization certificate & oem/challan/innvoice & tes t certificate with one year warranty on paper at the time of delivery. note:- 1) material will be required in o riginal packing of the oem 2) proof of purchase from oem will be required to be supplied at the time of deli very of the material. [ warranty period: 12 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up