Tender For supply, installation, testing and commissioning of interconnecting dg power supply arrangement for uninterrupted operation of 500 kwp solar pv plant (specification mentioned in tender document)
Tender For corrigendum : survey design fabrication supply installation testing and commissioning of total 10 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 05 years
Tender For corrigendum : survey, design, fabrication, supply, installation, testing and commissioning of total 60 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract for 3 years
Tender For corrigendum : survey, design, fabrication, supply, installation, testing and commissioning of total 30 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract for 3 years
Tender For corrigendum : survey design fabrication supply installation testing commissioning of total 20 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 3 years
Tender For corrigendum : design supply erection integration with existing electrical system paralleling or synchronizing with electricity board and diesel generator set grids and commissioning of 250kwp rooftop solar pv power plant
Tender For notice inviting e-tender for supply, installation and demonstration of different equipments, instruments, trainer kits, models, study setupsetc. for different laboratories of electrical engineering department,dr. meghnad saha institute of technology, - complete trainer board of andersons bridge ( measurement of inductance), schering bridge to measure unknown capacitance, trivector meter, complete set-up for the extension range of ammeter and voltmeter by using shunt and multiplier., complete set-up for the extension range of ammeter and voltmeter by using ct and pt, complete trainer board of wheatstone bridge ( measurement of medium resistance), complete trainer board for verification of nortons theorem, delta connected load box with each arm variable inductor, capacitor and resistor, complete set-up for measurement of energy using ct or ct and pt, led lamps, 5w, 230v, led lamps, 10w, 230v, led lamps, 15w, 230v, led lamps, 20w, 230v, diac characteristics trainer kit, digital oscilloscope, half wave-controlled rectifier with resistive load and determine the load voltage., half wave bridge rectifier trainer kit, full wave bridge rectifier trainer kit, rheostat, rheostat, rheostat, rheostat, fully automatic star delta starter, make & test the control and powercircuit for forward and reverserotation of sq. cage induction motorusing contactor circuit., make & test the control and power circuit for automatic star-delta starter operation of sq. cage induction motor using contactor control., laboratory module for measuring solar radiation using pyranometer on tilted surface at different angles of inclination., laboratory module for solar photovoltaic cell to plot i-v characteristics and to find out the solar cell parameters (o.c. voltage, short circuit current, voltage-current-power at maximum power point, fill factor, efficiency)., laboratory module for measuring thermal performance of a solar cooker with varying reflector., cut section model of water turbine (francis, kaplan, pelton), laboratory module for solar pv plant to produce electricity, laboratory module for wind power plant of with a small wind turbine to produce electricity, kit for testing mcb & hrc fuse by performing the load test, mcb -6a, kit for testing mcb & hrc fuse by performing the load test, mcb -10a, kit for testing mcb & hrc fuse by performing the load test, mcb -1a of hrc fuse, kit for testing mcb & hrc fuse by performing the load test, mcb - 5a of hrc fuse, laboratory module for dismantling mccb/elcb/ rccb and identifying various parts, testing of induction type/ microprocessor based over current relay using relay testing kit, testing of static distance protection relay using relay testing kit, testing of static over current protection relay using relay testing kit, testing of directional over current relay (docr) by relay testing kit, testing of percentage differential protection of transformer using transformer differential relay (microprocessor based/static), laboratory module to study of different lightning arrester and identify different parts, laboratory module to study of acb/vcb and identify different parts, laboratory module for performing insulation resistance test on any one motor/transformer
Tender For supply of epc 20mw ac solar pv plant in delhi bses rajdhani and tata power - epc 10mwac 14mwp solar plant bses rajdhani discom , land lease agreement value 1st year , land lease agreement value 2nd year , land lease agreement value 3rd year , land lease agreement value 4th year , land lease agreement value 5th year , land lease agreement value 6th year , land lease agreement value 7th year , land lease agreement value 8th year , land lease agreement value 9th year , land lease agreement value 10th year , land lease agreement value 11th year , land lease agreement value 12th year , land lease agreement value 13th year , land lease agreement value 14th year , land lease agreement value 15th year , land lease agreement value 16th year , land lease agreement value 17th year , land lease agreement value 18th year , land lease agreement value 19th year , land lease agreement value 20th year , land lease agreement value 21st year , land lease agreement value 22nd year , land lease agreement value 23rd year , land lease agreement value 24th year , land lease agreement value 25th year , land lease agreement value 26th year , land lease agreement value 27th year , comc post defect liability period for 1st year , comc post defect liability period for 2nd year , comc post defect liability period for 3rd year , comc post defect liability period for 4th year , comc post defect liability period for 5th year , comc post defect liability period for 6th year , comc post defect liability period for 7th year , comc post defect liability period for 8th year , comc post defect liability period for 9th year , comc post defect liability period for 10th year , epc 10mwac 14mwp solar plant tata power discom