Get complete information related to latest Oil Pan Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Oil Pan Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Oil Pan Scrap Tenders.
Tender For supply of set of retaining rings (pivot ring & housing ring) for housing of traction bar. set consisting of (1) pivot ring as per clw drg. no.1209.01.313-005, alt-2 (ref. abb drg. no. ia016-00261 rev-3) qty: 04 no s/set. and (2) housing ring as per clw drg.no.1209.01.313-004, alt-2 (ref. abb drg. no. ia016-0262, rev-3) . qty: 04 nos/set [ warranty period: 30 months after the date of delivery ]
Tender For supply of housing for traction bar as, per clw drg. no. 1209.01.113.002, alt-8 and rdso smi no. rdso/2006/el/0241, rev-0 dt.24.10.06 [ warranty period: 30 months after the date of delivery ]
Tender For supply of push pull rod (traction bar) for wap7/wag9 as per clw drg. no. 1209.01.113.006 or lat est, abb drg. no. ib011-00191 rev-3 or latest consist of 3 items. as per drg.no. (1) flange should be as per clw drg.no.1209.01.113 [ warranty period: 30 months after the date of delivery ]
Tender For procurement of a set of fasteners as per the annexure used in undergear components of hi gher sizes such as anti roll bar and traction centre. details of the fasteners and its specifications are prov ided in annexure. note: sample to be approved before bulk supply. [ warranty period: 30 months after t he date of delivery ]
Tender For corrigendum : supply of housing for traction bar as per clw drg. no. 1209.01.113.002. alt-7 and (abb dr g. no. ia011-00380) rev.5 and rdso smi no. rdso/2006/el/0241 [rev.0 ]
Tender For supply of push pull rod (traction bar) for wap-7/wag-9 to clw drg.no.1209.01.113.006 alt-5 con sists of :1) flange should be as per clw drg. no.1209.01.113.007 alt-72)tube welding as per clw drg. no. 1209.01.313.008 alt-4.3)traction bar(push pull rod flange hole size should be as per rdso smi no . rdso/2006/el/0241(rev.0) dated 24.10.06 [ warranty period: 30 months after the date of delivery ]
Tender For supply of expansion type bimetallic terminal connector suitable for 50 dia aluminum tubular bus bar to suit 30 dia copper studs of 25 kv ct/bt/ traction power transformer. as per drawing eti-psi-p- 11100. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of retaining ring ( pivot ring & housing ring) for housing of traction bar. set consist ing as per attached annexure [ warranty period: 30 months after the date of delivery ]
Tender For igbt based 3-phase drive propulsion system with composite converter for wap-7 as per rd so specification no. rdso/2008/el/spec/0071, rev.5 (propulsion equipment except traction converter) an d clw specification no. clw/es/3/ig/0/0518 alt. c (traction converter having hlc part of rating 2x600kva for wap-7) for complete three phase wap-7 locomotive along with physical medium i.e. esd/emd/ofg for multi functional vehicle bus (mvb) to inter-connect all the bus stations as per iec-61375, terminal bracket s, bus bar links and copper braids required for connection between main transformer and traction convert ers, auxiliary converters, interfacing connectors, cables and cable looms with connectors required for co nnection from vcu1/2 to sb1/2 panel, traction motor speed sensors, complete assembled and wired panel c fitted with driver display unit(s) and interface for both cab, as per following specifications: (i)rdso/2008 /el/spec/0071,rev.5 for igbt based 3-phase drive propulsion equipment except traction converter (ii) cl w/es/3/igbt/0518 alt. c for composite converter (iii) clw/es/3/0528 alt-a for tm speed sensor for igbt t raction converter (iv) clw/es/3/0138 alt-a for copper braid (v) clw/es/3/0458 alt.e for control cables (v i) clw/es/3/0459 alt.c for screened cables (vii) clw/es/3/0124 alt.'o' for set of connectors. (viii) clw/e s/3/0240 alt-b for panel c (without diagnostic terminal). (ix) rdso modification sheet no. rdso/2012 /ms/0413 rev 1 (x) rdso modification sheet no. rdso/2020/el/ms/0482, rev'1' (xi) rdso modificati on sheet no. rdso/2017/el/ms/0457 rev-0 (xii) all the relevant rdso modification sheets applicable for the sub-components of igbt based 3-phase drive propulsion equipment should be implemented. in add ition to above description, the propulsion system with composite converter should also co mply requirement mentioned in "schedule of requirement" (sor), copy attached with tender documents. warranty period: 72 months from the date of supply. [ warranty period: 72 months after th e date of delivery ]
Tender For igbt based 3-phase drive propulsion system with composite converter for wap-5 locomotiv e as per rdso specification no. rdso/2008/el/spec/0071, rev.5 (propulsion equipment except traction co nverter) and in place of traction converter, composite converter as per clw specification no. clw/es/3/igb t/0518 alt. b (composite converter) for three phase wap-5 locomotive along with physical medium i.e. es d/emd/ofg for multi functional vehicle bus (mvb) to inter-connect all the bus stations as per iec-61375, t erminal brackets, bus bar links and copper braids required for connection between main transformer and composite converters, auxiliary converters, interfacing connectors, cables and cable looms with connect ors required for connection from vcu1/2 to sb1/2 panel, traction motor speed sensors 04 nos, complete a ssembled and wired panel c fitted with driver display unit(s) and interface for both cab, as per following s pecifications: (a)rdso/2008/el/spec/0071,rev.5 for igbt based 3-phase drive propulsion equipment exce pt traction converter (b) clw/es/3/igbt/0518 alt. b for composite converter (c) clw/es/3/0528 alt-a for tm speed sensor for igbt traction converter (d) clw/es/3/0458 alt.e for control cables (e) clw/es/3/045 9 alt.c for screened cables (f) clw/es/3/0124 alt.'o' for set of connectors. in addition to this propulsion system with composite converter also comply requirement mentioned in revision 01 for additional scope o f supply and work[c-d&d/t/38(part) ]