Tender For corrigendum : sitc of agri food bio mug turnkey pilot plant setup d d - process equipment with automation , civil works retrofit , civil external misc. incl , hvac works , hvac controls bms works , metallic insulated panels and cleanroom panel systems design , compressor and drier , electric boiler , thermic fluid heating system , water cooled brine chiller , water cooled chiller , cooling tower , pumps , water ring vacuum pump , chilled water piping for process and hvac , chilled brine piping for process , cooling water generation and distribution piping , compressed air instrument air generation and distribution piping , vacuum distribution , low pressure steam lpst piping distribution , high pressure steam hpst piping distribution , thermic fluid piping distribution , soft water distribution , nitrogen gas distribution , carbon di oxide gas piping distribution , oxygen gas piping distribution , structural steel supports works , equipment erection , drain piping , process piping , process cip piping , electrical lt systems , electrical ht works , fire alarm system , public address system , access control system , door interlocking system , closed circuit televisison cctv , gas detection system , networking voice and data system design , fire protection system , dismantling works
Tender For filling up of hydrogen gas - mtps –ii-tgm & ca –hydrogen gas generation plant-filling up of hydrogen gas in the hydrogen gas cylinders and shifting to storage room and transporting of hydrogen gas filled cylinders to main tg building unit gas room from hydrogen gas plant storage room and empty hydrogen gas cylinder from main tg building unit gas room to hydrogen gas plant storage room for a period of six months (180 days) from the date of commencement of work or completion of the estimated quantity of hydrogen gas cylinders whichever is earlier and complete overhauling of high pressure reciprocating hydrogen gas compressor.
Tender For providing of customized amc/cmc for pre-owned products - medical oxygen gas generation plant-250lpmwith compressor and dryermfg by atmos power, pvt ltd,
Tender For tgm&ca division - hydrogen gas generation plant-filling up of hydrogen gas in the hydrogen gas cylinders and shifting to storage room and transporting of hydrogen gas filled cylinders to main tg building unit gas room from hydrogen gas plant storage room and empty hydrogen gas cylinder from main tg building unit gas room to hydrogen gas plant storage room for a period of six months (180 days) from the date of commencement of work or completion of the estimated quantity of hydrogen gas cylinders whichever is earlier and complete overhauling of high pressure reciprocating hydrogen gas compressor.