Tender For shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For supply of water drain box, for rmpu trough drain outlet for ac coaches to mtn miscellaneous sk.no. 4013. material &specification as per drawing. [ warranty period: 30 months after the date of delivery ]