Get complete information related to latest P Trap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic P Trap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding P Trap Tenders.
Tender For supply of ss cage/strainer for fitment in s-trap in lhb type coaches (90to 92 mm outer diameter ) as per annexure b to lr.no. 2021/m(c)/141/2pt2 dt: 08.05.2025.
Tender For ksr bengaluru: repairs to roof leakage of type - iv and type-ii quarters (q. no. 178, 194, 196, 197, 199, 201, 202, 203, 204, 207, 209, 210 and 242 blocks) by providing trapezoidal sheet at sbc. maintenance period is 6 months or one monsoon period whichever is later.
Tender For supply and fitment of f- type mounting bracket stand locking arrangement for s- trap gripping and protection of lhb coaches and u bracket for s-trap securing in bio toilet lhb /icf coaches as per attached specification .
Tender For tender for supply of sanitation and cleaning works at narwapahar township for 2025 to 2027 : : - deployment of 16 labour un skilled for cleaning of toilets two times at shopping complex community centre narwa club mtc estate office township electrical office old community centre cdc auditorium executive bunglow both schools including brooming of township road cleaning of drains removing spider nets from walls of the buildings collection of rubbishwaste from the buildings and dumping nearest dust bins washing of c type stairecase and mtc three room flats cleaning of floor collection of dustbins at c d mtc spl d type lifting drain cover and cleaning of chocked sewer line p trap cleaning of roofs chajjas spreading of bleaching powder carbolic acid spraying disposing of grass wood logs loose earth broken slabs and any other sanitary work related to this deployment of labour including lifting of dead body from gara nala river or on road side as rquired by local police lifting of dead catsdogs insect etc. and same will be prickle into the earth and as per direction of engineerincharge , deployment of 2 semiskilled manpower for supervision of the above job , cleaning of liquid mud loose soil including wild 1 mtr surrounding dust bin grass silt slush garbage etc from existing opencovered drains dustbin and other places including cost of tools tackles fuel lubricants complete including covering the tractortailor with good conditions plastictarpaulin as per instruction of engineerincharge including loading unloading and transporting of the same by mechanical transport by contractor and their own cost and as per dirction of engineerincharge payment of full loaded truck tractor trailer as per specification will be made after deduction of 8% volumetric measurement , phenoil , harpic , bleaching powder , floor washing powder , naphthalene ball , hard broom , soft broom , patson/sutli , carbolic acid (450 ml per bottle) , colin (450 ml per bottle) , water dozer , oxalic acid , toilet brush , broom sticks , rubber vaccum cleaner
Tender For request for bids for supply, installation and commissioning of slaughter house plant as per apeda standard - a: civil work items, dismantling the reinforcement cement concrete (r.c.c.) work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete., dismantling brick masonry in lime or cement mortar and stacking the material as directed with all leads, lifts etc., removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete., removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete., removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete, removing purlins from roof including stacking as directed with all leads , lifts etc. complete., removing rafters from roof including the materials as directed with all leads , lifts etc. complete., removing queen post truss from roof and stacking the materials as directed with allleads and lifts etc. complete, removing galvanized iron (g.i.) or asbestos cement (a.c.) sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete., excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the cubic meter (cu.m) excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means, excavation for foundation in soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (lift from 1.5m to 3.0 m.) by mechanical means, lift upto 3.0 m, excavation for foundation in hard-rock by blasting including cubic meter (cu.m) trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (lift from 1.5m to 3.0 m) by mechanical means, filling in plinth and floors with approved excavated materials available at site in 30 cm layers include- ing watering and compaction with plate compactor to required proctor density etc complete., filling in plinth and floors with contractors material/brought from outside and approved by engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete., providing dry trap / granite / quartzite gneiss 200 mm thick hard core metal spread in two layers each of 125mm thick crushed to 100 mm consisting of m