CTN :44554945
23 Mar, 2026
NA
Tender For construction of school and other infrastructure facilities suclass="text-red-selected">pclass="text-red-sele
cted">plying de
corati
class="text-red-sele
cted">ve / ornamental
class="text-red-sele
cted">plants of
class="text-red-sele
cted">various ty
class="text-red-sele
cted">pes with round earthen /
cc class="text-red-sele
cted">pots of a
class="text-red-sele
cted">p
class="text-red-sele
cted">prox. size 30
cm diameter in
cluding
class="text-red-sele
cted">plasti
c tray, de
corati
class="text-red-sele
cted">ve
class="text-red-sele
cted">plants, sweet earth, manure in
cluding
class="text-red-sele
cted">painting to
class="text-red-sele
cted">pots. de
corati
class="text-red-sele
cted">ve
class="text-red-sele
cted">plants to be su
class="text-red-sele
cted">p
class="text-red-sele
cted">plied at the
class="text-red-sele
cted">pla
ce as dire
cted by engineer-in-
charge in
cluding loading, un-loading and trans
class="text-red-sele
cted">portation. , su
class="text-red-sele
cted">p
class="text-red-sele
cted">plying de
corati
class="text-red-sele
cted">ve / ornamental
class="text-red-sele
cted">plants of
class="text-red-sele
cted">various ty
class="text-red-sele
cted">pes as dire
cted by engineer-in-
charge, in
cluding loading, un-loading and trans
class="text-red-sele
cted">portation. ,
class="text-red-sele
cted">pro
class="text-red-sele
cted">viding &am
class="text-red-sele
cted">p; fixing of 4.5 kg
co gas ty
class="text-red-sele
cted">pe fire extinguishers fitted with s
crew down ty
class="text-red-sele
cted">pe high
class="text-red-sele
cted">pressure
control
class="text-red-sele
cted">val
class="text-red-sele
cted">ve with 1.0 mtr long rubber braided dis
charge hose with horn. the body shall be
cce a
class="text-red-sele
cted">p
class="text-red-sele
cted">pro
class="text-red-sele
cted">ved with is:2878 marking and su
class="text-red-sele
cted">p
class="text-red-sele
cted">plied with initial
charge of
co2 gas. the
class="text-red-sele
cted">val
class="text-red-sele
cted">ve shall
confirm to is:3224 and as
class="text-red-sele
cted">per is:15683. , su
class="text-red-sele
cted">p
class="text-red-sele
cted">plying &am
class="text-red-sele
cted">p; fixing of 250 l
class="text-red-sele
cted">ph r.o. water
class="text-red-sele
cted">purifier at b
class="text-red-sele
cted">vm s
chool with following s
class="text-red-sele
cted">pe
cifi
cations: - ,
class="text-red-sele
cted">power stabilizer with ne
cessary arrangements for ele
ctri
city su
class="text-red-sele
cted">p
class="text-red-sele
cted">ply (wiring,
class="text-red-sele
cted">plug
class="text-red-sele
cted">point, et
c.) , iso standard fixtures iso standard water tank (500 liters'
ca
class="text-red-sele
cted">pa
city, u
class="text-red-sele
cted">p to 4.00m height) with all ne
cessary and fittings.) , one-year warranty with three free ser
class="text-red-sele
cted">vi
ces in one year for the ro
class="text-red-sele
cted">plant, in
cluding all labor and materials at no
cost. ,
com
class="text-red-sele
cted">plete as dire
cted by the engineer in
charge, with all materials, labor, tools, and ta
ckles." , su
class="text-red-sele
cted">p
class="text-red-sele
cted">ply of birla white wall
care
class="text-red-sele
cted">putty ,
class="text-red-sele
cted">vitrified full body tiles in different sizes (thi
ckness to be s
class="text-red-sele
cted">pe
cified by manufa
cturer), with water absor
class="text-red-sele
cted">ption less than 0.08% and
conforming to i.s. 15622, of a
class="text-red-sele
cted">p
class="text-red-sele
cted">pro
class="text-red-sele
cted">ved make, in all
colors &am
class="text-red-sele
cted">p; shade. , size of tile 600x1200mm. , 1.5 mm de
corati
class="text-red-sele
cted">ve high
class="text-red-sele
cted">pressure laminated sheet of
class="text-red-sele
cted">plain / wood grain in gloss/matt/suede finish , wood glue (adhesi
class="text-red-sele
cted">ve)
com
class="text-red-sele
cted">patible with laminate to wood , su
class="text-red-sele
cted">p
class="text-red-sele
cted">plying of following stainless steel (ss 304) fixtures: , aldro
class="text-red-sele
cted">ps 300x16 mm size , handle 125mm , tower bolts 200 mm size , tower bolts 100 mm size ,
class="text-red-sele
cted">p
class="text-red-sele
cted">v
c manhole
co
class="text-red-sele
cted">ver hea
class="text-red-sele
cted">vy duty with frame 600 x 600 mm , ss door sto
class="text-red-sele
cted">p
class="text-red-sele
cted">per-100mm , magneti
c door sto
class="text-red-sele
cted">p
class="text-red-sele
cted">per-100mm , su
class="text-red-sele
cted">p
class="text-red-sele
cted">plying of stainless steel towel rail
com
class="text-red-sele
cted">plete with bra
ckets fixed to
cleats with
cclass="text-red-sele
cted">p brass s
crews. 600 mm long towel rail with total length of 645 mm, width 78 mm and effe
cti
class="text-red-sele
cted">ve height of 88 mm , su
class="text-red-sele
cted">p
class="text-red-sele
cted">plying stainless steel towel ring tra
class="text-red-sele
cted">pezoidal sha
class="text-red-sele
cted">pe 215 mm long, 200 mm wide with minimum distan
ces of 37 mm from wall fa
ce with
con
cealed fittings arrangement of ,
class="text-red-sele
cted">p
class="text-red-sele
cted">v
c nanhi tra
class="text-red-sele
cted">p with stainless steel jhali (100 x 100 mm) , su
class="text-red-sele
cted">p
class="text-red-sele
cted">plying stainless steel o
class="text-red-sele
cted">verhead shower 100 mm dia with shower arm and wall flange , engagement/de
class="text-red-sele
cted">ployment of a qualified interior designer i.e. b.e.(ar
ch)/di
class="text-red-sele
cted">ploma in interior designing to gi
class="text-red-sele
cted">ve designs of interior/exterior finishing items, working drawings i.e. ar
chite
ctural
class="text-red-sele
cted">plan, ele
class="text-red-sele
cted">vation design, ele
ctri
cal
class="text-red-sele
cted">plan, water su
class="text-red-sele
cted">p
class="text-red-sele
cted">ply/sanitary
class="text-red-sele
cted">plan, air
conditioning details, furniture
class="text-red-sele
cted">plan, furniture sele
ction,
ceiling details, bathroom details,, room details, flooring details, wall
co
class="text-red-sele
cted">verings, furnishings, art effe
ct details, de
cor
class="text-red-sele
cted">produ
ct sele
ction, gardening/lands
ca
class="text-red-sele
cted">pe details, interior and exterior
class="text-red-sele
cted">painting details et
c. in
consultation with engineer in
charge and as a
class="text-red-sele
cted">p
class="text-red-sele
cted">pro
class="text-red-sele
cted">ved by engineer in
charge. the interior designer shall
class="text-red-sele
cted">pro
class="text-red-sele
cted">vide drawings for all the finishing items as well as 3d
class="text-red-sele
cted">presentation before exe
cution of any item
com
class="text-red-sele
cted">plete as
class="text-red-sele
cted">per the s
class="text-red-sele
cted">pe
cifi
cations.