Tender For upgradation to 6 lane with paved shoulder of nh 141 from km 5.560 to 14.014 excluding the rob section from km 05.885 to km 06.870 and interchange location from km 09.795 to 11.735 and construction of new 6 lane major bridge of nakti creek at km 7.1
Tender For corrigendum : operation and maintenance for the following sections of nh 04 in the ut of a and n islands jarawa area i 47.19 km from km 59.400 to km 106.590, jarawa area ii length 16.68 km from km 138.320 to km 155, major bridge over humphrey - "performance based maintenance contract works in jarawa area of nh-223 (new nh-04) from km. 59.400 to 106.590 and km 138.320 to km 155.000 and major bridge over humphrey strait creek on nh-04in the union territory of andaman & nicobar islands, in fy: 2025 26"
Tender For consultancy services for implementation of policy for fishermen affected due to construction of ghansoli airoli creek bridge project and conducting surveys to determine the number of fishermen and the impact levels along with preparation and implemen
Tender For consultancy services for ae for supervision balance works of construction of major bridge over middle strait creek (package-iiia, iiib, iv, v, vi, vii and jarwa area on nh-04 in the union territory of andaman and nicobar islands. - consultancy services for authoritys engineer for supervision of balance works of (i) construction of balance works of major bridge over middle strait creek between km. 106.590 to km 108.553 of nh-04 connecting south andaman & baratang island in the union territory of andaman & nicobar islands on epc basis (ii) rehabilitation and up-gradation and completion of balance work of section from km 107.760 to km 129.445 (after middle strait to humphrey), km 130.600 to km 138.300 (after humphrey to kadamtala) of nh-04 to intermediate/2-lane with hard shoulder in the union territory of andaman & nicobar islands on epc basis - (package-iiia). (iii) rehabilitation and up-gradation and completion of balance work of section from km 155.00 to km 181.00 (end of jarwa to rangat) of nh -4 (total length 26 km) to intermediate lane/2-lane with hard shoulders in the ut of a&n islands on epc basis (package iiib). (iv) rehabilitation and up-gradation of section from km 206.000 to km 239.425 of nh-223 (new nh-4) to intermediate lane/2-lane in the ut of a&n islands on epc basis. (package-iv). (v) rehabilitation of km 0.00 to km 12.00 section in andaman trunk road of nh-4 to intermediate lane with hard shoulder in the ut of a&n islands on epc basis. (package-v). (vi) rehabilitation of section from km 45.00 to km 59.20 of nh-4 to intermediate lane with hard shoulder in the ut of a&n islands on epc basis. (package-vi). (vii) rehabilitation of km 181.00 to km 206.00 section in andaman trunk road of nh-4 to intermediate lane with hard shoulder in the ut of a&n islands on epc basis. (package-vii). (viii) rehabilitation and upgradation of jarwa area on nh-04 (old nh-223) from km 59.40 to km 107.00 and km 138.30 to km 155.00 in the union territory of andaman & nicobar islands (total project length = 206.27 km) on nh-04 (old nh-223) in the union territory of andaman & nicobar islands.