Get complete information related to latest Polyethylene Wax Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Polyethylene Wax Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Polyethylene Wax Tenders.
Tender For supply of grease, lithium base, ep - 2 (beml),grease, lithium base, ep - 2 (beml),automotive hydraulic brake fluid as per is 8654,automotive hydraulic brake fluid as per is 8654
Tender For corrigendum : supply of repair oblic work is required for flt 3 ton sl no 30153 at ge ep jodhpur , parts of vehicle to be replace , fuel pipe intake and return , accelerator cable , fuel filter set of two , hose pipe set , air filter , engine oil , transmission oil , hydraulic pressure pipe , fan belt , exhaust bellow spring , coolant , grease , oil filter , rubber pad for accelerator , hub packing kit , shaft seal , gasket , master cylinder , roof hood , hydraullic oil , brake fluid , high pressure line for fuel injection , maintenance and labour work required , brake setting and bleeding , levling the hydrualic oil , welding of exhaust spring , greasing of wheel and hub , repair to hydraulic pump , cleaning of lifter chain and forks slide , auto electrical wiring , complete servicing of vehicle , complete denting and painting , fixing of hood fixing arrangement , fuel pump repair , caliberation of injector nozzle
Tender For supply of steering gear box repair kit , drive pinion , bush ce , carbon brush set , tie rod end assy , steering joint assy , indicator assy , brake fluid container , oil seal , hydraulic pipe , accelerator cable
Tender For repair and overhauling service - ground equipment;ground equipment; no; buyer premises-scope of work for servicing of ground equipment- regular servicing and preventing maintenance of ground equipment is essential to ensure the safety, efficiency, and reliablility of ground operations. gsse plays a critical role in supporting aircraft turnaround, maintenance, and logistics function. over time, continous use of equipment such as ladders, hydraulic rigs, trolleys, towing arms, and refilling systems can lead to mechanical wear, fluid degradadation, and unnoticed structural fatigue. faulty or poorly maintained gse poses a direct risk to personnel, aircraft, and ground assets. servicing ensures that all mechanical, hydraulic and structural components function safely and as intended. scope of work: 1. ladder frame to be inspected and weld joints for cracks for deformation and it is to be repaired. 2. anti-slip steps, handrails and safety locks to be inspected and to be rectified/changed. 3. caster wheels are to be checked for wear, lock function and lubrication and all the faulty parts are to be repaired/changed as per condition of the(f) equipment. 4. brake function and tow hitch mechanism is to be checked and to be repaired/changed as per condition of the equipment. 5. rust to be removed where required. 6. hoses and fittings are to be inspected for leaks and damages and thoses are to be repaired. 7. filters are to be changed if required. 8. cylinders are to be checked for cracks and are to be repaired. 9. structural integrity of frame and platform is to be checked and repaired as per requirement. 10. wheels are to be checked for alignment or any other bearing issues anfd same is to be repaired. 11. parking brake is to be checked along with the towbar assembly and is to be repaired as per requirement. 12. load securing hooks or rails are to be checked and to be made operational. 13. reservoir is to be checked for contamination and fuel level 14. hand/foot operations is to be checked and made serviceable. 15. dispensing hose nozzles and fittings are to be checked and are to be made serviceable. 16. straightness and structural integrity of bar is to be checked and same is to be rectified if required. 17. all the moving parts are to be lubricated with correct grade of lubes/greases. 18. conduct ndt if required for stress crack detection. 19. cleaning of equipment is to be done before and after servicing. 20. service status and next due date is to be tagged. 21. summary report is to be given to the user after repair of all the repairing work done. 22. adhere to oem servicing guidelines and intervals. 23. use of oem grade consumables and spare parts.