Web Analytics Made Easy - StatCounter

Porta Cabins Tenders

Get complete information related to latest Porta Cabins Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Porta Cabins Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Porta Cabins Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :36256827 Due date: 07 Jun, 202407 Jun, 2024 21.03 Lacs
Tender For supply of porta cabins supply and assembling

Central Government And Public Sector

CTN :36157493 Due date: 07 Jun, 202407 Jun, 2024 NA
Tender For water cooled hood for fume extraction of arc furnace to rwf drawingno.761900310360 and part drawing no.751900310470, 711900310490, 711900310510,701200111770 .special conditions for supply of water cooled hood. 1. pre-qualification for tenderers. a)firms who are having facilities for heavy fabrication and who have executed similar works shall only quote b)the required raw materials shall be sourced through reputed sources such as m/s sail,tisco,isp&t,ismt,jindal,msl,kalyani,tata or their authorised dealers.tenderer shall furnish mtc for raw materials including the source. c)the tenderer should have qualified welders for manufacturing and supplying water cooled hood on time. they shall also produce latest certificates of qualified welders on their rolls. d.quality assurance plan is enclosed to comply.ii. scope of work for manufacturing, assembly,testing and supply of water cooledhood. a)submission of raw material procurement invoice from reputed source to m/s.rites. b)welding sequence plan,selection of electrodes of e-7018 quality of m/s.advani oerlicon / l&t/ esab/metafusion/weld craft/ador only. c)marking,sizing and surface preparation. d)preparations of weld joints. e)welding by qualified welders. f)stress releiving time temperature graph shall be enclosed. g)weld joints should bedp tested for liquid penetration test (pt) randomly for 20% - test certificate shallbe enclosed. h)painting of water cooled hood by one coat of red oxide paint followed by one coat of heat resistant aluminium paint. i)dispatch of water cooled hoodwith suitable packing to avoid damage during transit. iii. inspection: a)by m/s rites atfirms premises shall carry out product inspection. b)stage inspection: representative of m/s rites at firms works.before dispatch shall carry out the final inspection of w.c.hood. shall be checked for various dimensions and hydraulically tested ata pressure at 10kg/ cm2 for two hours. d.supplies shapage 1 of 6 run date/time: 08/05/2024 18:21:56stores/rwftender documenttender no: p1241302a closing date/time: 07/06/2024 10:45
 Loading, Please wait...

Connect us via What's Up