Get complete information related to latest Power Equipment Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Power Equipment Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Power Equipment Tenders.
Tender For supply of set of three phase hydraulic powerequipment with accessories and tooling arra ngement for lock bolting of 7/8, 5/8, 3/4 and 1/2 inch lock bolts as per specification attached of bid document part-ii. total value of the offer will be calculated based on combined offer for all the groups: (i) the cost of the basic machine. (ii) cost of the concomitant accessories according to tender specifications. (iii) cost of any other accessory which in the opinion of supplier is essentially required for making the machine full y functional. (iv) cost of installation & commissioning etc. (v) cost of preventive maintenance during 1st & 2nd year of warranty period. (vi) duties and taxes as quoted by the bidder, insurance and freight, [ warranty pe riod: 30 months after the date of delivery ]
Tender For corrigendum : refurbishment of ge make turbine hpcv spares of ntpc solapur 2x660 mw units. - refurbishment of ge make turbine hpcv sp, hp valves (dia>6"-12") refurbishing, misc works (>) repair, matl (>) hndlg & tptn, matl (>) hndlg&stacking
Tender For comprehensive annual maintenance contract of total 13nos. of split type ac and 2 units duct ac installed at control room, turbine floor and generator hall at lph and chief office, hospital and guest houses located at talakalale and kargal 577421, sagar talluk, shimoga dist,karnataka.the scope of contract shall be to keep the air conditioners in normal working condition. attending to all breakdown and preventive maintenance of acs at lph, talakalale, kargal office,ib & hospital without any delay.the contractor shall supply and install the parts found defective for satisfactory maintenance of acs without any delay during the contract period as per the schedule list of spares. the contractor shall note down the equipment & accessories that are in service in present system.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract.compressors shall be replaced only when the existing compressor is found irreparable.spares to be provided for maintaining continuity of work.the successful service provider has to maintain ready stock of requisite spares in good condition throughout the comprehensive annual maintenance contract period to facilitate immediate replacement of defective parts.preventive maintenance for air conditioners.preventive maintenance shall be provided at least once in 3 months during prime shift hours of coverage at no extra cost. the firm shall monitor the performance of the systems, monitoring and cleaning, topping up of refrigerant gas, greasing of moving and running equipment, cleaning of filters etc., and give a report to the executive engineer(o&m)lph division head, kpc ltd.,breakdown maintenance for air conditioners-the agency should attend to all the breakdown call promptly & immediately.however in extreme case, if the spares not available immediately, repair shall be carried out within 2 weeks. efforts shall be made to rectify the system within 2 weeks. during the contract period the firm shall supply and install all parts found defective for satisfactory maintenance of air conditioners at no extra cost. it is the responsibility of the firm to bring all components to working condition. any leakage of gas in the piping/system shall be attended by the agency. filling up of refrigerant gas is also included in the scope of work. all repairs/rewinding/services related to the air conditioning system, electrical circuits, stabilizers, compressors or motors and all the accessories connected to ac system etc., are covered under comprehensive annual maintenance contract. all the spares and compressors are under the responsibility of the firm during contract period.replacement of defective parts-the firm shall supply and install all parts found defective during the comprehensive annual maintenance contract period in respect of acs at their own cost. original spares and compressors shall be used during contract period. in case of suitable replacement not available for defective components of air condition plant the firm shall undertake to provide a higher version components at no extra cost and the defective parts and components shall be handed over to kpcl.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract. compressors shall be replaced only when the existing compressor is found irreparable.
Tender For dismantling of 350 hp vertical turbine pump set no 01 and dismantling the cable connection of the motor, supply of ball bearing, coupling bolt, supply of pump shaft, repair of thrust bearing and re-assembling the same of gannikada of tmc channarayapatna
Tender For augmentation of power supply infrastructure, provn of central air coolers, air conditioner for powerequipment rooms, flame proof light at various location at af stn bamrauli
Tender For supply of transformer oil of standard make as per is under district capex for topping of power transformers, cts pts and other powerequipments within the jurisdiction of std bijbehara.
Tender For corrigendum : procurement of main turbine governing spares for bhel makes turbine machine special repair no 10536a111 01 at 1x500 mw unit sgtps mppgcl birsinghpur.
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; contract for inspection repair and high speed balancing of rotor of pac iii drive turbine of ammonia plant of rcf thal; service provider