Get complete information related to latest Power Plant Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Power Plant Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Power Plant Scrap Tenders.
Tender For providing of facility management services - lumpsum based - industrial; o&m of mechanical work, oil filtration or purification of the turbine lubricating oil in any powerplant or process industry; consumables to be provided by service provider (inclusive in cont..
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai powerplant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinion shaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinion shaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinion shaft w.r.t to governor assembly., h) put electronic over speed shaft (pinion shaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl
Tender For notice inviting e-tender for supply, installation and demonstration of different equipments, instruments, trainer kits, models, study setupsetc. for different laboratories of electrical engineering department,dr. meghnad saha institute of technology, - complete trainer board of andersons bridge ( measurement of inductance), schering bridge to measure unknown capacitance, trivector meter, complete set-up for the extension range of ammeter and voltmeter by using shunt and multiplier., complete set-up for the extension range of ammeter and voltmeter by using ct and pt, complete trainer board of wheatstone bridge ( measurement of medium resistance), complete trainer board for verification of nortons theorem, delta connected load box with each arm variable inductor, capacitor and resistor, complete set-up for measurement of energy using ct or ct and pt, led lamps, 5w, 230v, led lamps, 10w, 230v, led lamps, 15w, 230v, led lamps, 20w, 230v, diac characteristics trainer kit, digital oscilloscope, half wave-controlled rectifier with resistive load and determine the load voltage., half wave bridge rectifier trainer kit, full wave bridge rectifier trainer kit, rheostat, rheostat, rheostat, rheostat, fully automatic star delta starter, make & test the control and powercircuit for forward and reverserotation of sq. cage induction motorusing contactor circuit., make & test the control and power circuit for automatic star-delta starter operation of sq. cage induction motor using contactor control., laboratory module for measuring solar radiation using pyranometer on tilted surface at different angles of inclination., laboratory module for solar photovoltaic cell to plot i-v characteristics and to find out the solar cell parameters (o.c. voltage, short circuit current, voltage-current-power at maximum power point, fill factor, efficiency)., laboratory module for measuring thermal performance of a solar cooker with varying reflector., cut section model of water turbine (francis, kaplan, pelton), laboratory module for solar pv plant to produce electricity, laboratory module for wind powerplant of with a small wind turbine to produce electricity, kit for testing mcb & hrc fuse by performing the load test, mcb -6a, kit for testing mcb & hrc fuse by performing the load test, mcb -10a, kit for testing mcb & hrc fuse by performing the load test, mcb -1a of hrc fuse, kit for testing mcb & hrc fuse by performing the load test, mcb - 5a of hrc fuse, laboratory module for dismantling mccb/elcb/ rccb and identifying various parts, testing of induction type/ microprocessor based over current relay using relay testing kit, testing of static distance protection relay using relay testing kit, testing of static over current protection relay using relay testing kit, testing of directional over current relay (docr) by relay testing kit, testing of percentage differential protection of transformer using transformer differential relay (microprocessor based/static), laboratory module to study of different lightning arrester and identify different parts, laboratory module to study of acb/vcb and identify different parts, laboratory module for performing insulation resistance test on any one motor/transformer
Tender For 4 x 125 mw surat lignite powerplant, unit 1 to 4, biennial maintenance contract for turbine & its auxiliaries and balance of plant equipment for two years 2025-27.
Tender For supply of cut section model of actual single cylinder four stroke petrol engine for plotting valve timing diagram , cut section model of actual multi cylinders four stroke petrol engine for plotting valve timing diagram , cut section model of actual single cylinder four stroke diesel engine for plotting valve timing diagram , cut section model of actual multi cylinder four stroke diesel engine for plotting valve timing diagram , cut section model of actual single cylinders two stroke petrol engine for plotting port timing diagram , steam powerplant working model , car air conditioning actual cut section model , model of gas turbine , air compressor , air compressor dual stage , experiment with a radial compressor , gear pump test rig variable speed , steam quality using calorimeter , joule thomson coefficient
Tender For providing of repair and overhauling service - thermal powerplant; works on annual regular maintenance works in main turbine and auxiliaries piping and valve; yes; buyer premises