Tender For corrigendum : in estimate 100mm mixed soil removing and providing and laying of gravel, making of toe wall in 220/132/33 kv switch yard. - ; estimate for excavation of 100mm soil, providing and laying of gravel, making of toe wall in 220/132/33 kv switch yard at 220kv sub station mahendergarh
Tender For corrigendum : raising of yard toe wall and miscellaneous civil work at 33 kv s/s ramgarh dpr - - raising of yard ,toe wall & misc. civil works at 33kv s/s ramgarh, dungarpur.
Tender For resurfacing and strengthening of navagam approach road (m.d.r.) km. 0/0 to 10/400 ta. morva (h) dist. panchmahal (resurfacing & strengthening (f.d.r.), curve improvement, structure, road furniture, strom water drain, protection wall and toe wall)
Tender For construction of cc motorable road and toe wall hand railing footpath starting from subash nagar parking places end to jaya prakash minj house nirmala minj house at subash nagar at ward no 10
Tender For annual repair and maintenance of pwd various road under division ser-1 of sub-division ser-14 during 2025-26. (sh - providing rcc toe wall at defence colony flyover both sides).
Tender For repair and maintenance of infrastructure assets in r-ii division during 2025-26 sh repair of footpath toe wall planter at najaf khan road and garbage ramps in circle 9
Tender For den/south/sbc section: karuvalli : widening of old platform, additional loop line 1 no, approach road(500x6m), retaining wall for platform and toe wall for embankment, earthwork, extension of 2 nos of box culvert (br.no 43,44), dismantling of old station building, cable hut room, divangjan toilet, public toilet and snt building at karuvalli station(km 22/800-21/800). (composite work). maintenance period is 12 months
Tender For a) provision of yard material stacking room at six station each under sse/p.way/ umri & nzbb) hyderabad division - sleeper matting at station and pwi officesc) hyderabad division - umri - provision of boundary wall at mue end (500 meters)d) hyderabad division - repair to drain work (800m on both lh and rh side) and stone pitching at kmce) hyderabad division - upw - side drain raising ( stone masonry) for 300mf) hyderabad division - repair to drain work 800m on either side lh and rh of point 13b at upwg) hyderabad division : proposed drain construction at idl near lc at km 482/600-900h) hyderabad division - provision of grating cum bailing of accumulated water between good loop and loop line-2 i) hyderabad division - provision of toe wall from km. 458/900-500 for 300mj) hyderabad division - provision of buffer stops as a part of extension of dead end with concrete sleeper at bdhn and other stations ( non-track portion)