Get complete information related to latest Quarry Material Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Quarry Material Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Quarry Material Tenders.
Tender For supply of materials for metlling roads krishna nagara gp under mgnrega 2025-26 - crushed stone chippings 13.2 mmk1x, granite metal 20 mmk1x, granite metal 40 mmk1x, crushed stone course aggregate 53k1x, vibratory roller 8 tonnek1x, water tankerk1x, gravel 2.36 mm or murrum k1x
Tender For supply of pre fabricated or 40 men living shelter made up of steel structure and hybrid pir,aggregate 20mm stone aggregate to be crushed rock or gravel 20mm graded,aggregate 40mm stone aggregate to be crushed rock or gravel 40mm graded complete,manufactured sand,bricks common burnt clay building bricks sub class b modular size designation 75kgf cm2,white cement,water proof floor silica panels of size 600 x 600 mm with minimum thickness of 10 mm,non skid ceramic tiles coloured 7 to 8 mm thick in floors etc,prefabricated foundation reinforcement type f 2 made of 12 mm and 10 mm for steel as main bars and 8 mm dia deformed bars as in stirrups as per drg,form work type 2 timber form work material for columns,ms clamp msde of ms flat 40 x 4 mm 200mm long bent in l shape with two holes of 12mm dia on each end. 04 x nut and bolt of size 10 x 50 mm with washer.,rapidite quick setting liquid,liquid water proofing compound,pvc ceiling rose 2 3 terminal with pvc square box complete with screws,led tube light fitting 1 x 18w 4 fee
Tender For construction of new road along boundary wall of oil colony, moran- exterior to existing boundary wall (approx. length 550.0 mtr) by 150 mm gsb, 75 mm thk wbm(double layer), 25 mm thk sdbc with hardened side berm including supply of all quarrymaterials by the contractor
Tender For construction of new road out side the oil colony boundary wall, moran (approx. length 1200.0 mtr) by 150 mm gsb, 75 mm thk wbm (double layer), 25 mm thk sdbc with hardened side berm including supply of all quarrymaterials by the contractor
Tender For supply of materials for execution of civil works in ramasagara grama panchayth under mgnrega kampli tq bellari dt - rms-three wheel 80 100 kn static roller, rms-tipper 5.5 cum with 10 tonne capacity, rms-add 24 percentage centering charges since centering area increased, rms-binding wire, rms-tmt bars fe 500, rms-broken granite metal 10 mm, rms-mixer concrete 1 cum capacity, rms-portland cement, rms-coarse sand zone iii, rms-broken stone aggregate 12 mm to 10 mm size, rms-broken stone aggregate 20 mm size, rms-unit cost as per the specification, rms-crushed stone chippings 13.2 mm, rms-granite metal 20 mm, rms-granite metal 40 mm, rms-crushed stone course aggregate 53, rms-vibratory roller 8 tonne, rms-water tanker, rms-gravel 2.36 mm murrum
Tender For corrigendum : emergency work for supplying quarrymaterials on nh-141 bet. km. 5/560 to 14/535 section k.f.t.z. kandla road and nh-754k bet 00/00 to 279/00 section lakhpat - gaduli - khavda - mauvana - santalpur road.
Tender For name of work addtional 160 mva 220/132 kv power t/f at 220kv sub station kaul - site surfacing, pcc, supply and spreading of crushed gravel.(civil works)
Tender For corrigendum : request for bids for supply, installation and commissioning of slaughter house plant as per apeda standard - a: civil work items, dismantling the reinforcement cement concrete (r.c.c.) work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete., dismantling brick masonry in lime or cement mortar and stacking the material as directed with all leads, lifts etc., removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete., removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete., removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete, removing purlins from roof including stacking as directed with all leads , lifts etc. complete., removing rafters from roof including the materials as directed with all leads , lifts etc. complete., removing queen post truss from roof and stacking the materials as directed with allleads and lifts etc. complete, removing galvanized iron (g.i.) or asbestos cement (a.c.) sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete., excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the cubic meter (cu.m) excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means, excavation for foundation in soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (lift from 1.5m to 3.0 m.) by mechanical means, lift upto 3.0 m, excavation for foundation in hard-rock by blasting including cubic meter (cu.m) trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (lift from 1.5m to 3.0 m) by mechanical means, filling in plinth and floors with approved excavated materials available at site in 30 cm layers include- ing watering and compaction with plate compactor to required proctor density etc complete., filling in plinth and floors with contractors material/brought from outside and approved by engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete., providing dry trap / granite / quartzite gneiss 200 mm thick hard core metal spread in two layers each of 125mm thick crushed to 100 mm c