Tender For tender for supply of restriction orifice for p25 project at iocl panipat refinery --field-applied coal tar enamel pipe coating systems: application, performance, and quality control , coatings and linings over concrete for chemical immersion and containment service , corrosion control of offshore structures by protective coatings , control of external corrosion on underground or submerged metallic piping systems liquid-applied internal protective coatings for oilfield production equipment , extruded polyolefin resin coating systems with soft adhesives for underground or submerged pipe , discontinuity (holiday) testing of new protective coatings on conductive substrates holiday detection of fusion-bonded epoxy external pipeline coatings of 250 to 760 um (10 to 30 mils) , measurement of protective coating electrical conductance on underground pipelines offshore platform ballast water tank coating system evaluation , test procedures for organic-based conductive coating anodes for use on concrete structures , aboveground survey techniques for the evaluation of underground pipeline coating condition , laboratory methods for the evaluation of protective coatings and lining materials on metallic substrates in immersion service , evaluation of internal plastic coatings for corrosion control of tubular goods in an aqueous flowing environment , evaluation of internal plastic coatings for corrosion control of tubular goods by autoclave testing , holiday detection of internal tubular coatings of 250 to 760m (10 to 30 mils) dry film thickness , exterior protective coatings for seawater immersion service
Tender For bid to ras bid to ras supply of fabrication of floating test structures for performance evaluation of ultrasonic antifouling system , periodic maintenance & monitoring of floating test structures during performance evaluaion of uas
Tender For corrigendum : establish a monitoring and evaluation system through pmeu for implementation of projects and contracts in bccl in three (03) months and maintain and operate the system for thirty three (33) months from the date of acceptance of the established system