Tender For custom bid for services - rpnc252027 support service for swing extruder vfd installation-shifting, foundation and installation of power transformer- 1. the power transformer is to be installed by construction of new transformer foundation, dismantling/modification of surface, providing chain link fencing on all other 4 sides, cleaning and refurbishment of bay area is in the scope of contractor only. all necessary manpower, tools & tackles, shifting machinery like hydra/crane etc shall be in the scope of contractor only. 2. shifting of power transformer of 7.2 mva onan from store to site, loading-unloading, erection, site storage are in scope of contractor. 3. the basic data sheet and ga drawing of the proposed transformer is attached in scope only. 4. the bidder if required must construct bay width, height and fire walls as per relevant is/iec/oisd standards and site conditions such that adequate clearances for maintenance shall be maintained. bidder to submit the plot plan of equipment layout of transformer layout along with the bid. the bidder shall carryout the site visit for assessment of the available installation space. the total length of the transformer bay should be such that the radiator can be accommodated on either side of transformer tank in the specified bay width. 5. all necessary earth pit provisions, & fire barriers/wall modifications, provision of new hvws water sprinklerbased firefighting system having suitable capacity for protection against the fire & explosion as per the design of supplied transformer and applicable standards & direction of eic. provision of all necessary fire protection system for transformers shall be in the scope of lstk contractor. 6. construction of oil drain facility of transformer as per is standard and hookup with existing burn oil pit. 7. the erection to be certified by contractor as per its recommended procedures which is to be submitted prior to erection. qap for erection and site commissioning shall also to be endorsed by contractor. 8. all kind of lifting, rigging work for loading-unloading, erection work including supply of hydra/ cranes, lifting rigging materials, manpower, tools and tackles as required are in scope of contractor. 9. all kind of skilled, semi-skilled, unskilled manpower as per itc of transformer requirement will be in the scope of contractor. 10. erection includes entire vacuum by proper capacity of vacuum pump, for not less than 48 hours, or more if required as per the instruction of engineer in charge. 11. first filling up of the transformer oil at site, its filtration, site testing oil sample, any refiltration required during final commissioning shall be in the scope of contractor including all tools, tackles and including oil filtration machines. oil may be supplied in drums, which should be properly sealed during transportation and storage. seal shall be verified and opened in front of iocl representative before filling in transformer. contractor should have enough storage capacity for handling oil. filling the oil from drums to the transformer through suitable capacity of high-quality filter machine and filtration of the same to get desired bdv &ppm as specified by engineer in charge and transformer manual. 12. contractor must replace all the gaskets by new ones if required by engineer in charge. 13. the contractor shall arrange nitrogen cylinder required at site for above work. 14. contractor must repaint the transformer tank with two coats of anti-rusting good finish ltbs grey shade 631 of is:5 by spray painting if required and as per the direction of engineer in charge..
Tender For auction sale of scrap plastic,rubber scrap,wiring,leaf spring,battery,wiper motors, fan, blowers,radiator and condenser,baled body scrap,mix steel,alternator starter,door, body panel, boot/trunk,defaced engine 4w,tyre with rim 4w,cut chassis scrap,sheared body scrap,seat scrap,fabric scrap,glass scrap,wood,differential
Tender For supply of hydraulic motor for radiator fan for 1400 hp demu to cat pt. no. hymr1400hp. as per drg.no. cat pt. no. hymr1400hp. specn: cat pt. no. hymr1400hp. [ warranty period: 30 months a fter the date of delivery ]
Tender For supply of replace 4 ft 36 w t rod , replace 4 ft 18w led , replace 4 ft 230 v tl starter , replace electronic choke for tl , replace side holder for tl , replace 5 amp piano switch , replace 15 amp piano switch , replace 5 amp modular switch , replace 15 amp modular switch , replace 5 amp socket outlet 3pin , replace 15amp socket outlet 3pin , replace 5 amp modular outlet 3pin , replace 15 amp modular outlet , replace 2 module electronic regulator , replace 9w led lamp , rewinding 0.5hp monoblock pump , rewinding 10 hp monoblock pump , pvdg skilled technician , wiringfor l powerwith4sqmm cu , wiring with1.5qmmfrlscuwire , wiringwith4.0sqmmfrlscuwire , sdrg 1no 1.5 sq.mm frls cu wire , s drg 2no 1.5 sq.mm frls cu wire , sdrg 2no 4.0 sq.mm frls cu wire , sf 20mm pvc conduit , sl 2c 6 sq mm xlpe al cable , sl 4c 10 sq mm xlpe al cable , laying cable upto 35sqmm , laying cable 35to95sqmm , laying cable 95sqmm to 185sqmm , endtermi2c6.0sqmm cable , endtermi4c10sqmm cable , endtermi3.5c35sqmm cable , sf 32atpn mcb , sf 40atpn mcb , sf 63atpn mcb , sf 5 to 32a sp mcb , sf 5 to 32a spn mcb , sf 40a dp rccb spn , sf 40a 4p rccb tpn , sf 63a 4p rccb tpn , repalce sreet light with 25 w led in holder , repalce sreet light 25 w led on pole , repalce pvc box , replace heat detector fda system , replace smoke detector fda system , replace mcp fda system , replace ri fda system , replace ri of sounder fda system , refill fire extgshr 4.5kgs , pvdg hosepipe for fire extgshr 4.5kgs , sf 12v 26ah battery fda system , rpair card of fda panel , repair hooter of fda system , repair mcp of fda system , repair ri of fda system , repair pa amplifier of fda system , repair mike of pa fda system , conduct fire drill for bldg , serice 11kv 400a id substation , filteration mineral oil , servicing mv and lt panels incl all , calibartion relays by inj method , replacement 2a hrc fuselink , replacement 63a hrc fuselink , replacement 125a hrc fuselink , replacement 200a hrc fuselink , service of dg set 250 kva , service radiator for ea set 250 kva , supply smps battery charger 10a , sf 12v 130ah battery for ea set , supply brass battery terminals , sf led indi lamps 220 v ac , sfixing bradided fuel pipe for ea , replace blower motor for sac unit , replace blower drum for sac unit , replace condenser motor for sac unit , replace condenser blade for sac unit , replace pcb for ac indoor unit , replace pcb for ac outdoor unit , replace rotary compressor for sac unit , replace 25to35 5 mdf capacitor for ac , replace 25a 2p contactor for ac , replace term box for ac , water service for ac unit , blower service for ac unit , leak test and r22 r 410 gas charge for ac unit , replace 50mm thick filter , sf micro controller for ac unit , replace 25a spn mcb , site visit for ac repair