Web Analytics Made Easy - StatCounter

Rain Water Harvesting Pipeline Tenders

Get complete information related to latest Rain Water Harvesting Pipeline Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rain Water Harvesting Pipeline Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rain Water Harvesting Pipeline Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :38201044 Due date: 21 Nov, 202421 Nov, 2024 2.56 Lacs
Tender For laying of ms pipe of various site at internal road to phyang ( under capex )

State Government

CTN :38200865 Due date: 22 Nov, 202422 Nov, 2024 16.55 Lacs
Tender For providing laying jointing and testing of ms pipe 200mm dia confirming to iso 3183 grade l290 having wall thickness 4.80 mm and ms pipe 200mm dia conforming to iso 3183 grade l290 having wall thick ness 4.00 mm

State Government

CTN :38182694 Due date: 18 Nov, 202418 Nov, 2024 NA
Tender For remodeling of old t/well in indora constituency in tehsil indora t/well dah, kathgarh, tw lodhwan-i & ii, tw no 10 (khubbar), tw 19 indpur tanda, tw 21 & 23 chuharpur, tw 24 nadaun, tw 31 indpur, t/well 32 changrara, t/well 41 tibbi, t/well 51 chanour, t/well 71 lachho-ka talab, t/well 72 indpur mori t/well 78 badukhar, t/well 91 palakhi bandial, distt kangra hp (sh-providing laying, jointing and testing of gl pipe 150mm dia, 100mm dia p/fixing of ms flange

CTN :37900121 Due date: 18 Nov, 202418 Nov, 2024 70.21 Lacs
Tender For corrigendum : dr m v r rtpp operation and maintenance laying 350 nb ms pipe line from recirculation pump house to stage i forebay of cooling tower i

CTN :37985528 Due date: 18 Nov, 202418 Nov, 2024 17.98 Lacs
Tender For corrigendum : providing of custom bid for services - ---- supply, installation, testing and commissioning of non-inverter ductable 5.5 tons air conditioners. factory charged and testedrefrigerant, ease of installation, ease of operations and safetyfeatures that are customized to best meet to the institute needs.powerful (more efficient), part load operation, phase starting ofcompressor comfort (ease of operation), wireless remote, silentoperation, factory charged refrigerant, reliable (higher ambienttemperature), up to 52 degree celcius, advanced microprocessorcontrol, flexibility (design convenience), flexibility in idumounting, compact design. with recovery of civil work like falseceiling, ducting, wooden work, canvas connection with all requiredaccessories, dismantling of ductable unit, laying of refrigerant pipingas per required specification, control cables, drain pipe withinsulation, supplying and fixing of ms outdoor stand, coating ofoutdor & indoor unit and additional refrigerant gas (make- voltas,blue star, lg)

CTN :37842528 Due date: 25 Nov, 202425 Nov, 2024 106.58 Crore
Tender For corrigendum : providing & laying water supply m.s. transmissionline from proposed wtp at rayka to existing 1354mm dia. pipe & from poicha french well feederlineto airport circle.

CTN :38151900 Due date: 29 Nov, 202429 Nov, 2024 20.08 Lacs
Tender For realignment of building service lines sjvn chq building at shanan shimla - providing and fixing 65mm dia g.i. pipes , painting 65 mm g.i. pipes , providing and filling sand of grading zone , re laying of dismantled 65mm g.i. pipes , c class heavy duty 150mm ms pipe is 1239 , c class heavy duty 150mm ms pipe fixing , c class heavy duty 150mm ms pipe is 3589 , 150mm non-return valve , perforated pre-painted m.s. cable trays , m.s. cable trays bends , pvc insulated and pvc sheathed xlpe power cable , gland and aluminium lugs , laying 200mm dia od , masonry chamber , one number pvc insulated and pvc sheathed xlpe power cable , outdoor cable end termination with heat shrinkable jointing kit , cable route marker with cement concrete

CTN :36719865 Due date: 13 Nov, 202413 Nov, 2024 7.99 Lacs
Tender For bid to ras upgradation of mortar command post 1 and 2 - excavation of land upto 4 depth and removing of soil fromthe site upto 4feet depth for command post , 4inch pcc atthe base size 64sqft , 12 inch thick brick wall at the outer 8x 8 with 9 inch 2 partition in between , plaster on wallsincluding kota stone finish on floor and wall , description ,brick step at 2feet depth and 4 feet depth , 4inch thick pccoutside for plinth protection , moorum filling upto groundlevel of the remaining area , boundary wall of 1feet withsupporting poles , laying of new shed of size 10feet x10feet with respect to height of 12feet on command post-01 , pile drilling for 24 pillars , pile foundation pillarsreinforcement and concrete , 3inch x 3inch round pipe , 2inch x2 inch square pipe 20feet , 1inch x 1inch l sizeangle , profile sheet size 4feet x 20feet , 40inch ms plainsheet at the centre of shed to protect from water seepage ,repeat patti , excavation of land and removing of soil fromthe side upto 4feet depth , 4 inch pcc at the base of size 64sqft , 12 inch thick brick all at the outer 8feet x 8feet with 9inch 2 partition in between , plaster on walls including kotastone finish on floor and wall , brick step at 2feet depthand 4feet depth , 4 inch thick pcc outside for plinthprotection , moorum filling upto ground level of theremaining area , laying of new shed of size 10feet x 10feetwith respect to height 12feet over the command post-2 |

State Government

CTN :37832034 Due date: 16 Nov, 202416 Nov, 2024 346.00 Crore
Tender For corrigendum : construction of diversion weir at the offtake point of the markandeya river at pachapur village to create a pool of water to divert the water from the river to the main pump house though the intake channel. supply, installation, testing and commissioning of pumping machinery of balance 03 nos out of (5w plus 1s) of vt of capacity 2830 hp to carry discharge of 0.914 cumecs at 187.8 m head along with electrical works for the main pump house. design, supply, erection, testing and commissioning of one power transformer of adequate capacity of 15 mva to meet the load requirement of main pump station for 110kv/6.6kv. construction of balance rising main for 4.752 km of pipe dia 1500 mm to 1200 mm in the main pump house from ch 18.830 km to ch 23.582 km at the delivery chamber-2 near mallapur village with necessary valves, chambers, crossings, thrust and anchor blocks. construction of bleeder of length 0.747 km, which conveys the discharge of 1.67 cumecs from the raising main at ch 19.377 km to delivery chamber-1 proposed adjacent to second pump house at hanabaratti village. construction of delivery chamber 1 adjacent to second pump house near hanabaratti tank. construction of second pump house and its allied works. supply, installation, testing and commissioning of pumping machinery with 3 nos (2w plus 1s) of vt of capacity 1500 hp to carry peak discharge of total 1.67 cumecs at 110 m head, along with electrical works for the second pump house. construction of pressurized bulk feeder no.4 of length 12.2 km, from the end of manifold system of second pump house to delivery chamber-3 at suthagatti village with necessary valves, chambers, crossings, thrust and anchor blocks, surge analysis & surge protection works. construction of delivery chamber - 2 at the end of rising main near mallapur village. construction of delivery chamber - 3 near suthagatti village, at the end of pressurized bulk feeder - 4 taking off from second pump house. supply, jointing, laying, testing and commissioning of pipe distribution network consisting of bulk feeder lines, mains, sub mains and sub feeders with ms/hdpe pipes of required pressure rating for conveying water under each blocks up to 20 ha sub chak, with necessary valves, chambers, crossings, thrust and anchor blocks. construction of security quarter, approach road and protection works all around the second pump house layout. construction of service road along the pipeline alignment for bulk feeders and main lines. transmission line from source sub stations to the second pump house with a switch yard with receiving tower,33kv vcb circuit breaker,33/6.6kv power transformers,6.6kv incomer ht pannel,110vdc battery and battery charger with dcdb,6.6kv 150kvar bus capacitor pannel,6.6/0.415kv auxiliary transformer,6.6kvht soft stater panel with capacitor,415v lt pcc pannel,6.6kvht electrical motors, lt load, other general items and safety accessories. operation and maintenance of the scheme for 5 years.

State Government

CTN :38136393 Due date: 14 Nov, 202414 Nov, 2024 92.36 Lacs
Tender For tender for the work of providing, laying and linking of 200mm dia ms water supply pipe from l.r.nagara main road from hosur road to ambedkar nagara main road in lieu of ci line coming under johnson market service station of aeese-1 sub division
 Loading, Please wait...

Connect us via What's Up