Web Analytics Made Easy - StatCounter

Rcc Manhole Chamber Tenders

Get complete information related to latest Rcc Manhole Chamber Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rcc Manhole Chamber Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rcc Manhole Chamber Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45016411 Due date: 12 May, 202612 May, 2026 NA
Tender For reconstruction of fully damaged manhole chamber i/c de silting and cleaning of manholes and sewer line constructed at sajida nagar sewage network under sub div. 6, bhopal

CTN :45057581 Due date: 16 May, 202616 May, 2026 9.50 Lacs
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of

Central Government/Public Sector

CTN :45027701 Due date: 18 May, 202618 May, 2026 28.00 Lacs
Tender For repairs/ cleaning of sewage lines, septic tanks, manholes, cover slabs, collection chamber, ci and pvc pipe, gully traps etc in zone a at ins valsura, jamnagar

Central Government/Public Sector

CTN :45038546 Due date: 18 May, 202618 May, 2026 28.00 Lacs
Tender For repairs/ cleaning of sewage line, manholes, cover slabs, septic tanks/ filter beds, collection chamber, ci and pvc pipe, gully traps etc in zone b at ins valsura, jamnagar

CTN :45041611 Due date: 11 May, 202611 May, 2026 19.83 Lacs
Tender For uplifting of manholes chamber and providing and fixing of rcc manhole cover (kanjli road to dhobi ghat via bangla mukhi mandir)

Central Government/Public Sector

CTN :44742425 Due date: 04 May, 202604 May, 2026 12.00 Lacs
Tender For corrigendum : ge/863/ews-t-01 of 2026-27 repair and cleaning to sewage line, manholes chamber,

State Government

CTN :45016410 Due date: 12 May, 202612 May, 2026 NA
Tender For repairing of damaged manhole chamber with cleaning of manholes and sewer line at e-3, arera colony, section no. 2 network area bhopal

State Government

CTN :44934879 Due date: 25 Apr, 202625 Apr, 2026 37.59 Lacs
Tender For construction of rcc pillars 17 nos construction of rcc platform construction of rcc manhole chamber 3 nos construction of retaianing wall to protect the main sewer line 50 rmt and laying di pipe 400mm dia k7 60.50 rmt and 300mm dia 21 rmt on pillar near agriculture office at khaliyar

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f

CTN :44975368 Due date: 06 May, 202606 May, 2026 97.3 Thousand
Tender For restoration of rain damages to sewerage scheme dharamshala town in distt. kangra (h.p) (sh laying, jointing and testing of d1 k-7 pipe 150 mm dia near adc residential building at depot bazar & construction of 3 nos. rcc manhole chamber near himachal pradseh school eduction board at dharam
 Loading, Please wait...

Connect us via What's Up