Tender For reconstruction of damaged 20feet deep sewerage manhole chamber at road no-5 himapuri colony under mansoorabad ward(45),nagole circle,lb nagar zone,malkajgiri region
Tender For upgradation of the existing fishing harbour at thengaithittu, puducherry under the centrally sponsored scheme subwork linking of newly laid sewerage line with intercepting chamber and attending urgent restoration to the road cutting portion at fishin
Tender For construction repair interlocking tile cc flowring drain road gulli chamber sewerage pipe lines main whole etc. ward no 1 to 5 in mc dinanagar.
Tender For construction repair interlocking tile cc flowring drain road gulli chamber sewerage pipe lines main whole etc. ward no 6 to 10 in mc dinanagar.
Tender For a mtc. of sewerage system of rewari town,` de-silting of sewerage manhole chamber in ward no. 12 and various places with bailing out of water with tanker or electrical pump set, diversion of sewage including all safety equipment, sign boards and carriage of silt, malba from site to outside city complete in all respect and all other works contingent thereto.` -[dnit no.-154503]
Tender For mandi dabwali:- ``dnit for the work of construction of ips in uttam nagar, collecting tank (6.00 × 4.00 m), pump chamber, boundary wall, installation of pumping machinery and providing and laying of sewerage system, along with all other works contingent thereto``. ch. head:- mandi dabwali:- providing sewerage system in newly approved colony and construction of ips at uttam nagar at dabwali town distt. sirsa.
Tender For (part-a):- shahzadpur distt. ambala : w/s scheme “installation of tubewells, pump chamber, boundary wall, laying the distribution lines and fhtc.(part–b):- shahzadpur distt. ambala : sewage scheme. laying of sewerage system, construction of manholes, inspection chamber and construction of 3.00 mld stp (sbr technology based) scada / plc controlled including mps and ips comprising wet well sump, boundary wall, pump chamber, rising main, staff quarters, pumping machinery, dg set etc. including operation and maintenance cum defect liability period for 06 years after successful completion of 3 months trial run period of entire scope of cbd complete in all respect.