Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power plant; work of repairing and rewinding of bhel make esp rectifiertransformers unit no 3 4 5 up to 90 kva 53 point 57kv 373 point 5 v ac dc output 7..
Tender For tender for the work of erection of new 200 kva dtc along with 11 kv ht 3 c x 300 sq.mm cable at gholwada parye for a.p.s. to 1 no. of 3ph. ltag connection to the ae pwd valpoi sattari goa at gholwada parye under s.o. parye, sdii, sankhali. - tender for the work of erection 200kva transformer centre along with laying of ht underground 3 core 300 sqmm xlpe cable at gholwada,parye in order to release the 1 no 3 phase ltag service connection to assistant engineer ,sd-ii ,w.d xxiv phe ,pwd valpoi at gholwada parye for a load 10hp in the jurdsction of section office parye under sub-division-ii (r) sankhalim-goa
Tender For providing of facility management services - lumpsum based - replacement of damaged tin shed construction of transformer plinth office building repair and boundary wall repair with height raising at electricity store centre barabanki; civil works; consumables to b..
Tender For providing of facility management services - lumpsum based - construction of transformer plinth boundary wall repair and height raising main gate installation and plinth fencing works at electricity store centre balrampur; civil works; consumables to be provided b..
Tender For supply of mechanical engineering lab materials - mechanical engineering lab materials, serve motor drive kitinterface l293d motor driver ic with arduino to control direction of rotation of two dc motors), bldc motor kitbldc motor 1 nobldc motor drive -1noinbuilt volt and ammeter and rpm meterinbuilt power supplyinput 230v ac, lvdt trainer kit complete educational trainer for linear variable differential transformer (lvdt) displacement measurement. built-in ac excitation source and signal conditioning circuitry for lvdt operation. micrometer assembly for precise linear movement of the lvdt core. displacement range ~10 mm with clear front-panel adjustments for zero & calibration. digital display (typically 3 -digit) for direct readout of conditioned output/displacement values. test points and banana sockets for signal observation on external instruments. self-contained unit in a durable enclosure with labeled controls and educational layout. includes user manual and patch cords for experiments. operates on 230 v ac, 50 hz mains supply., multi-cylinder petrolphase : single phase load: mechanical load with ropenumber of cylinders : 4displacement : rope brakepower : 65hp,4000 rpm,1396 ccbrand material : mild steelengine type : 4 stroke self startfrequency : 15hzfuel consumption : petrolfuel tank capacity : 5 letermorh s test rig, tail stock assemblyheavy-duty lathe tailstock assembly for training; cast iron body with base, barrel (quill) ~50 75 mm stroke, hand wheel feed, dead centre mt2/mt3, set over screws for taper turning, spindle clamp, complete with all internal parts for dismantling and reassembly; suitable for 300 400 mm centre height training lathe., dc motorvoltage 220-440 v dcpower - 180 w speed - 200 rpm, hydraulic cylinderdouble acting hydraulic cylinder, bore 40 50 mm, stroke 200 300 mm, working pressure up to 100 160 bar, steel tube with honed bore, hard chromed piston rod, front & rear end caps, piston with seals and wear rings. supplied as standalone unit with suitable mounting for dismantling, inspection and reassembly., hydraulic opreated directional control valve (dcv)manually operated 3/2 or 4/2 way spool type hydraulic directional control valve, nominal size ng06 (cetop 3) or equivalent, rated pressure 210 bar, flow 20 40 lpm; valve body with hardened and ground spool, centering springs, ports p a b t clearly marked. supplied on small mounting plate for dismantling, inspection and assembly practice., bearing with shaft assemblyteaching unit with shaft 25 35 mm dia mounted in housing with deep groove ball bearings (6205 / 6206 class) at both ends; includes locking arrangements (circlips, lock nuts, covers). designed for repeated removal, cleaning, lubrication and refitting of bearings, with provision to mount on bench or test rig., coupling unit using driving and driven shaft plumber block bearing unit1. the plummer block housingmaterial: cast iron (grade fg 200 or equivalent). type: sng or snl series (split-type housing).sealing: felt seals or v-ring seals (to demonstrate lubrication retention).lubrication: provided with a grease nipple at the top center for manual lubrication practice.2. the bearingtype: self-aligning ball bearing (1200 series) or spherical roller bearing (22200 series).bore diameter: standard 25mm or 30 mm (ideal for lab scale).mounting: adapter sleeve mounting (h-series) to teach students how to lock a bearing onto a smooth shaft.3. shafting and couplingshaft material: ground carbon steel (en8 or en9) for high surface finish.coupling type: * flexible coupling: to demonstrate the bearings ability to handle slight misalignment.rigid flange coupling: to demonstrate traditional direct connection.driving/driven setup: one shaft connected to a small electric motor (driving) and the other to a brake drum or load (driven)., spring test machine load & displacement sensing load cel * capacity: 0 10 kno accuracy: 1% fs (better if 0.5% fs) displacement sensor * lvdt / digital encodero accur
Tender For tender for the work of erection of plinth mounted 0.44kv 200kva distribution transformer centre alongwith associated underground ht and lt equipments cables for improvement of low voltage at covatewado quepem
Tender For corrigendum : provn of electric supply to training infrastructure, provision of transformer to meet power requirements for installation of fast charger at mechanical transport park of 3 administrative and training regiment, artillery centre and slp rep for replace
Tender For corrigendum : supply of 4500 sets of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure p