Tender For maintenance of north block, new delhi during 2025-26 (sh: civil maintenance work related to day to day maintenance including periodical maintenance work, a/r & m/o works and periodical cleaning of terrace, tunnels in basement, manhole, sewer line and water storage tank and providing services for maintaining the great hall & brooming/cleaning the front area along with kartavya path & back side area of north block, new delhi)
Tender For rrsmp/25-26 purnea/01 - pakka road to adiwasi tola, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, ro
Tender For rrsmp/25-26 purnea/03 - pmgsy path diyari to harijan tola diyari via sarpanch tola naya tola, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, excavation in soil using hydraulic excavator and tippers with disposal upto 1000 mexcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3, construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight s
Tender For rrsmp/25-26 purnea/04 - bishu baba sthan(hanuman mandir ) to adiasi tola karwa rahika, clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the requ
Tender For rrsmp/25-26 purnea/06 - puran shah to farkiya hat (harijan tola), clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technical specification clause 509., semi-dense bituminous concreteproviding and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and
Tender For rrsmp/25-26 purnea/05 - fasia chowk to barhari sima ( seikh tola), clearing and grubbing road land (by manual means)clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201., scarifying existing bituminous surfacescarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4., excavation in soil using hydraulic excavator and tippers with disposal upto 1000 mexcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3, construction of subgrade & earthen shoulderconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., granular sub-base with well graded material (table 400.1)construction of granular sub-base by providing well graded material (crushed stone aggregates and local sand), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with three wheel 80-100 kn static roller capacity to achieve the desired density, complete as per technical specification clause 401, ( by mix in place method ) for grading ii material, wbm grading 3providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., a (by manual means ), prime coat (low porosity)providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per technical specification clause 502, tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with hydraulic broom as per technical specification clause 503., tack coatproviding and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503., patch work over wbm using mix seal surface for bituminous and existing cc pavementproviding, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (type-a) or 13.2 mm to 0.9 mm (type-b) aggregates using penetration grade bitumen (i.e. 92% of standard bitumen and 8% waste processsed plastic by weight shall be used for coating aggregate after its heating) as per irc:sp:98-2013, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kn static roller and finishing to required level and grades as per technic
Tender For rrsmp/25-26 bagaha-1/03 - khabtola gulten miyake ghar se shekh karmulah ke ghar tak, clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification clause 201.1 and direction of e/i, dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202., dismantling of existing structures, like culverts, bridge,retaining wall and other structures comprising of brick masonary including unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per, construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1., excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3, construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401., providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405., providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using mechanical means as per technical specification clause 502., providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface tretaed with primer and clened with hydriloc broom as per technical specification aclouse 503., providing and laying semi dense bituminous concrete with 100-120 tph batch type hmp producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per morth specification clause no. 508 complete in all respects., construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401., providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth