Tender For corrigendum : supply of crossover switch (is/iec 60947-3:1999) for cabin air conditioning system as per detailed specification. (i) nominal voltage 415 vac (ii) 04 nos protected terminal , full load current:40 a, (iii) mounting type: modular din rail mount (iv) tupe: circuit breaker, (v) front operation with three position (i-o-ii, midposition off). make- c & s or similar [ warranty period: 30 months after the date of delivery ]
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; carry-out residuallifeassessment of primary reformer catalyst tubes by robotic crawler unit on call basis at hurl barauni; as per nit
Tender For corrigendum : supply of gym for strength and conditioning d d - power racks , inserted platforms , deadlift platform , landmine , seal row bench , women weight lifting sets weightlifting bar, weight , men weight lifting sets weightlifting bar, weight , weight lifting competition bar 20 kg , weight lifting training bar 15 kg , chrome hex trap bar , flat bench , multi adjustable bench , barbell rack , ez 4 feet bar , weight lifting competition bar 15 kg , plyometric boxes , sled , pu dumbbells 1 kg to 10 kg , pu dumbbells 12 kg to 35 kg , pu dumbbells 40 kg to 60 kg , dumbbell rack 3 tier , 1,3,5,7,10 medicine ball , slam balls , kettle ball , loop bands , mobility stick , lat pull down , chest press , shoulder press , hip thrust , pec fly or rear delt , cable crossover , glute ham developer , leg extension , leg curl , 45 degree leg press , half rack , smith machine , treadmill , elliptical , spin bike , air bike , ski ergs , bike erg , rower , assault bikes , adductor abductor ) /bid number : gem/2026/b/7413001 * /dated: 08-04-2026 & & / bid document 1 / 38
Tender For corrigendum : residuallifeassessment study (rla) of boiler pressure part including 5000 mtr corrosion mapping of boiler water walls tubes by remote electromagnetic technique of boiler 2x250 mw unit no. 10 and 11 stps, sarni - name of work-residuallifeassessment study (rla) of boiler pressure part including 5000-meter corrosion mapping of boiler water wall tubes by remote electromagnetic technique of boiler 2x250mw, unit no. 10 & 11 stps, mppgcl, sarni