Tender For supply of 4500 sets of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure pole [excluding
Tender For supply and execution items for reliability improvement of signalling inst. section of sr. dste/1/lko of lucknow div. nr. - excavating and refilling of trench to the level of ground with rammed earth asper drg. no.(nr/s&t/con/1.1/97a) so as not to form a drain 0.3 mtrs wide & 1mtr deep on both side of the station along side the track. it shall confirm to the safe distance as per signalling and cable plan in all type of soil, it also includes clearence of roots of trees and bushes., excavating and refilling of trench 0.3 mtrs wide & 0.8 mtr deep on pitced/stone/bricks paved surface, road/crossing/platform etc. and restoration of surafce to original condition., laying of signalling/telecom/power cables of different sizes as per attached guidelines (drg. no.(nr/s&t/con/1.1/97a) or latest on signalling cable laying and as per cable route plan approved by railways through trenches, rcc pipe, dwc pipe, gi pipe etc and meggering of cable before and after its laying of all type of outdoor cables. contractor have to transport cable from any store of lko division to site carefully. meggering to be done for each drum separately. meggering sheets to be supplied and filled up by contractor and submitted to railways, as per instructions by consignee., supply and laying of 2nd class bricks in the trench and laying as per drg. no. (nr/s&t/con./1.1/97a) or latest and as per instruction of the site engineer., boring and trenchless cabling along with supply and insertion of hdpe/dwc self lubricated pipes as per rdso spec no. rdso/spn/204/2011 ver 1.1 or latest of 120mm nominal dia in the bore at the depth of 1.4 meter to 2.1 meter from formation level (level of earth below ballast) as per drawing and as directed by engineer incharge by trenchless technology for laying of signalling /telecom/power cable under track /culvert etc. cable laying covered separately. inspection-consignee for supply of dwc/hdpe pipe. the following required coupling arrangement should also be supplied: 1. suitable snap fit couplers withrubber o ring, 2. spacers, 3. tees. 4. bend. 5. end cap(1 no. =6mtr ,straigh tpipe). (a) the cost shall include horizontal boring through any intermediate obstruction, either natural or man made or any boundary etc. (b) the rate is inclusive of all the materials equipment and labour required for during trenchless horizontal boring under the railway track. nothing extra shall be admissible on any account than the rate quoted above. (c) the pipeis to be laid underrailway track/road /culvert. all necessary arrangement are to be provideand all precautions are to be end is not deviated from the horizontal level line by more than 250mm in horizontal and vertical direction. (d) the rate shall be inclusive of direction and protection of underground utilities encountered during boring. (e) the payment for boring shall be made only when dwc/hdpe pipe are laid in the bore., concreting unschduled items in concrete of 1:3:6 ratio in cement, coarse sand and aggregate 25mm at different places in the yard and plastering top in fine plaster of 1:4 cement sand ratio. it also includes the excavation of earth as required at site and as per instruction of site incharge. the volume in cubic metres shall include the volume occupied by any ci foundation, trestle, ms angle or flat or gi pipe required to be embedded in the casting. cement coarse sand and aggregate 25mm are to be supplied by the contractor., earth work for excavation and refilling around location boxes and signals etc. where necessary including 50m lead and 1.5m lift. the lead is to be measured from centre of gravity of location to the centre of filling and lift from main ground level. the earth work should be well rammed including breaking of clods, levelling and dressing etc. as per instruction of engineer at site., brick work with well burnt bricks in foundations and plinths with cement and sand (ordinary) mixture of 1:4 ratio. all material is to be supplied by the contractor.
Tender For corrigendum : repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; tender for the job of obtaining consent to establish for hter scheme at rcf thal unit through nipl route; as per scope of work; a) safety violation by contractor employee at work place: 1) working without wearing safety helmet (per person), 2) working without wearing safety shoes (per person), 3) working without wearing safety goggle &/or hand gloves during handling of hazardous chemicals, acid/alkali etc. (per person), 4) working without wearing safety belt (double lanyard full body harness) for height jobs above 2 meters. (per person), 5) working without wearing face shield during cutting, welding, grinding activity and during maintenance work on process lines and equipment. (per person), 6) not using ppe, tools/tackles as mentioned in safety work permit (per person), 7) working without valid test certificate for lifting tools/tackles (per incidence observation), 8) working without appropriate electric plug-pin, elcb/rccb/rcbo (per incidence observation), 9) working without a valid safety work permit (per incidence/ observation), 10) permit not available at site (per incidence/observation), 11) gas cylinder without flash back arrestor (per incidence observation), 12) gas cutting set with damaged hose pressure gauge without valve key (per incidence/observation), 13) gas cylinder without trolley (filled and empty) (per incidence/ observation), 14) unauthorized personal entering into cordon off area (per incidence/observation), 15) faulty wire/cable laying on ground or using snapped cables (per incidence/observation)., 16) improper hand tool or power tools (per incidence observation), 17) smoking at work place area. (per person), 18) found in intoxicated state (per person), 19) violation of road rules (per incidence observation), 20) b) safety violations by transport contractors, 21) faulty hazchem displayed on tanker (per incidence observation), 22) one pvc/tychem suit set if available (per incidence/ observation), 23) both pvc/tychem suit set are not available (per incidence observation), 24) fire extinguisher without hydro test. (per incidence/ observation), 25) trem card not available (per incidence/observation), 26) hazardous chemicals transportation training of driver by authorized agencies. (training card not available with driver) (per person), 27) lying/resting below the vehicle(per incidence/observation), 28) any other deviation found as per checklist for tankers (per incidence/ observation.
Tender For providing of goods transportservices - per mt - ad-hoc roadtransportation contract from fsd chittoor to fsd sevur; open body taurus; 16 ft truck,goods transportservices - per mt - ad-hoc roadtransportation contract from fsd chittoor to fsd arakkonam; open body taurus; 16 ft truck,goods transportservices - per mt - ad-hoc roadtransportation contract from fsd chittoor to fsd avadi; open body taurus; 16 ft truck
Tender For corrigendum : providing of goods transportservices - per mt - food grains, adhoc roadtransport contractor banda to chitrakoot; open body lcv truck; 17 ft lcv
Tender For corrigendum : providing of goods transportservices - per mt - roadtransportation of steel materials from rinl raipur conversion agent-hira steels limited to rinl stockyard mumbai (in and around 60 km) by trailer; 40 feet long body for transportation of steel; 40 feet long b..
Tender For corrigendum : providing of goods transportservices - per mt - roadtransportation of steel materials from rinl raipur conversion agent-hira steels limited to rinl stockyard nagpur (in and around 60 km) by trailer; 40 feet long body for transportation of steel; 40 feet long b..
Tender For corrigendum : providing of goods transportservices - per mt - roadtransportation of steel materials from rinl raipur conversion agent-hira steels limited to rinl stockyard pune (in and around 60 km) by trailer; 40 feet long body for transportation of steel; 40 feet long bod..