Get complete information related to latest Roll Crusher Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Roll Crusher Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Roll Crusher Tenders.
Tender For procurement of moisture analyzer, double rollcrusher, analytical balance for ogchd, etps,1x660mw ,htps and moisture analyzer for ogchd,2x250mw dtps ,htps
Tender For procurement of various spares for impact coal crushers at coal handling plant 3 x 660 mw units at ktps, koradi., ref. :- ktps / pur / 2025-26 / chp-mm-660 / rfx-t-59104 - grinding jib pn m07546/2, breaker plate pn m07548/4, impact crusher stud for jack shaft, crusher impact base frame, crusher impact set of rotor bolts, modified beater head bolt for imp crsher
Tender For supplying material for grampanchayat - aggregate 12 mm, aggregate 20 mm, aggregates 13.5/12.5 mm nominal size, aggregates 63 mm to 45 mm, cement, hard murum, r.c.c pipe np2 class 600mm dia.2.5m long, sand natural/v.s.i (vertical shaft impact crusher), artificial sand, labour, tractor, jcb, roller, tanker, board
Tender For supplying material for grampanchayat - aggregate 12 mm, aggregate 20 mm, aggregates 13.5/12.5 mm nominal size, aggregates 63 mm to 45 mm, cement, hard murum, r.c.c pipe np2 class 600mm dia.2.5m long, sand natural/v.s.i (vertical shaft impact crusher), artificial sand, labour, tractor, jcb, roller, tanker, board
Tender For supplying material for grampanchayat - aggregate 12 mm, aggregate 20 mm, aggregates 13.5/12.5 mm nominal size, aggregates 63 mm to 45 mm, cement, hard murum, r.c.c pipe np2 class 600mm dia.2.5m long, sand natural/v.s.i (vertical shaft impact crusher), artificial sand, labour, tractor, jcb, roller, tanker, board
Tender For dismantling, fabrication/erection of double rollcrusher outer cover, feed chute, discharge chute and platform gate work in main washing plant of sawang washery.
Tender For transporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu