Get complete information related to latest Rubber Lagging Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rubber Lagging Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rubber Lagging Tenders.
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; biennial rate contract for conveyor belt vulcanizing and pulley rubberlagging jobs in php at rcf thal; buyer
Tender For providing of custom bid for services - providing and fixing of rubberlagging 16mm fire resistance diamond cut and deep groove of conveyor belt drums at chhatarpur mine no 1 of pathakhera area
Tender For fire resistances rubberlagging for 06(six) nos of drum, drive driven and discharge drum (size 1000 mm x 1400 mm) for 2 nos. and other 04 nos drive drum (size 650 mm x 1200 mm) thickness 16 mm for belt conveyor at nakrakonda kumardihi b colliery unde
Tender For providing and fixing of rubberlagging on 24 (twenty-four) nos. of belt conveyor pulleys of various sizes with fire resistant diamond grooved, 12mm thick, m-24 grade rubber sheet for belt conveyor system in nandira underground mines.
Tender For annual contract for providing expert services for conveyor belt jointing by hot/cold vulcanizing process to the nylonconveyor belts and rubberlagging to conveyor pulleys in chp-210, ktps, koradi.
Tender For fire resistance rubberlagging with 15mm thickness of fr rubber diamond grooved sheet and solution on conveyor drums in ccs circuit and development section
Tender For supply of supply of 4x8.5 ton ducable ceiling mount air conditioning plants equipment , supply and installation of 28.60 mm copper pipes of 15 mtr length each with suitable insulating material from indoor unit of 8.5 ton ac plant to outdoor unit. , supply and installation of 15.88mm copper pipes of 15 mtr length each with suitable insulating material from indoor unit of 8.5 ton ac plant to outdoor unit. , supply of 10 sq. mm 4 core copper cables and wiring of equipment upto switch board. , supply of 1.5 sq.mm 8 core copper control cables and wiring of equipment upto switch board. , supply of 4 sqmm 4 core copper cables and wiring of equipment upto switch board. , supply of pvc conduit pipe and other required misc. hardware as per requirement , misc essential work for hanging the machine and proper level with 10mm full threaded g.i. rod includes minor repair work with material of wall and ceiling surface. , providing and fixing of ms stand of proper size suitable for the outdoor unit. the stand should be made up of 50mmx50mmx5mm mild steel. , supply of misc. items required for completion of installation such as nut bolts, rubber gasket, 35mm dia drain pipe with insulation approx 30mtr etc. , providing factory fabricated ducting material in 20 gauge gi sheet, for plenum chamber. , providing factory fabricated ducting material in 22 gauge gi sheet for supply duct , providing factory fabricated ducting material in 24gauge gi sheet for some portion of supply duct and return duct including jointing the different pieces of duct with suitable hardware and rubber , providing and fabricating the 9mm nitrile insulation work inside the supply duct and plenum chamber. acoustic insulation for plenum chamber and machine mouth open cell with 9mm nitrile insulation , providing and fabricating the 9mm nitrile insulation work inside the supply duct and plenum chamber. acoustic insulation for ducting closed cell 9mm nitrile insulation , providing and fixing of 475mm x 475mm canvas of reputed make in between the plenum and machines. , providing and fixing dampers of size 475mm x 475mm , providing, fabrication and fixing of powder coated aluminium grill for supply air , providing, fabrication and fixing of powder coated aluminium grill for return air , installation, testing and commissioning of 4x8.5 ton ductable air conditioning plants. //bid details 2 / 27
Tender For corrigendum : biennial work contract for conveyor belt jointing / replacement of belt / rubberlagging on conveyor pulleys / longitudinal jointing / spot patching and other conveyor works at chp 210 mw atps mppgcl chachai