Get complete information related to latest Sealing Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Sealing Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Sealing Work Tenders.
Tender For tnpdcl- thiruvannamalai region - tedc-construction of control room building, electrification, water supply, bore well, sanitary arrangement, providing transformer plinths, cable duct, filling, fencing arrangements with retaining wall, culvert, road work and other related civil works for the establishment of new kelur 33/11 kv substation in tiruvannamalai edc- turnkey basis – by e-tendering
Tender For tnpdcl- thiruvannamalai region - tedc-construction of control room building, electrification, water supply, bore well, sanitary arrangement, providing transformer plinths, cable duct, filling, fencing arrangements with retaining wall, culvert, road work and other related civil works for the establishment of new kozhipuliyur 33/11 kv substation in thiruvannamalai edc- turnkey basis – by e-tendering
Tender For e tender for ceremonial kit 2025 first call - ceremonial kit etc. , coat with stich , a. coat in 35% merino wool and 65% fine polyester, stitched on double micro-lite fused with polyester thead, polyester inner lining, italian pads for inner comfort. outer layer requiring protection form the element for soft feel and extreme comfort level with heat proof polyester buttons. , b. coat in 35% viscos and 65% polyester, stitched on double micro-lite fused with polyester thread, polyester inner lining, and ltalian pads for inner comfort. outer layer requiring protection from the element for soft feel and extreme comfort level with heat proof polyester buttons. , pent/trouser , a. pant in 35% micro wool or visos 65% polyester, with micro fused belt, same color interlocking three threads both side pockets of viscos cotton with repeated hooks, heat proof buttons with ykk stitched chain. , b. pant in 35% viscos and 65% polyester, with micro fused belt, same color interlocking three threads both side pockets of viscos cotton with repeated hooks, heat proof buttons with ykk stitched chain. , shirt , a. shirt in 85% polyester and 15% comb cotton cloth with micro dot fused collar and caff, heat proof imported buttons and stitched chains. , a. shirt in 67% polyester and 33% comb cotton cloth with micro dot fused collar caff, heat proof imported buttons , tie , a. silk finished cloth with stripes and logo on it , b. polyester silk cloth with stripes and logo on it. , kurta pyjama , a. silk fabric with computer embroidery & hand work on front part. , b. pc silk fabric with computer embroidery & hand work on front part. , safa , chunri print safa on silk mix cotton , t-shirt , a. t-shirt 100% polyester stretch light weight material knitted fabric with new drimay technology for keeping sports men dry & comfor-table 160 gsm , b. t-shirt cotton polyester stretch light weight material knitted fabric with new drimay technology for keeping sports men dry & comfor-table 160 gsm , bags , a. bag 28x14x12 finish to repel water without sacrificing breatha-bility , b. tettron bag 28x14x12 finish to repel water without sacrificing breatha-bility , water bottle , "leak proof stainless steel bottle durable and break resistantanti-spill mechanismeasy grip" , lunch box , "drabble and break resistantlight weight and easy to carry100% airtight lockageleak resistant dishwasher safespill free storagekeep food healthy and fresh" , socks , a. socks 100% lycra cotton fiber blend for better traction inside the shoe , b. socks 100% lycra pc cotton fiber blend for better traction inside the shoe , chunni , chunri print safa on silk mix cotton , jooti , pvc sole with leather or synthetic upper and embroidery , hand towel , 100% cotton terry towel 600 gsm reed 30% pick 42 pile warp 2/203 7tpi, ground warp 2/203 15 tpi weft 185 400 washing fastness size 42x62 cm , towel , 100% cotton terry towel 600 gsm reed 30% pick 42 pile warp 2/203 7tpi, ground warp 2/203 15 tpi weft 185 400 washing fastness size 78x156 cm , shoes , a. leder and synthetic leder , b. synthetic leder and pvc sole , single bed sheet , "100% cotton sheeting cloth 110x90 percle 40x40 count, 400tc, reactive print and plain 150 gsm, colour and print washing fastness width 155 cm and length 250 cm, pillow cover four side border 10 cm innerflape 15cm width 46 cm and length 72 cm stitching with matching" , double bed sheet , "100% cotton sheeting cloth 110x90 percle 40x40 count, 400tc, reactive print and plain 150 gsm, colour and print washing fastness width 250 cm and length 270 cm, pillow cover four side border 10 cm innerflape 15cm width 46 cm and length 72 cm stitching with matching" , dohar , 100% cotton sheeting cloth 60x60 cout 310 tc reactive print, plain 150 gsm colour fastness four side stich with border and piping inside with warm cloth. ready with three layer length 250cm width 160cm , quilt , readymade quilt 100% microfiber nanosilicon gel filling by hypoallergenic tempera
Tender For work for interception & diversion of water from natural drain near maa kali mandir dungra colony to filling ghanchiyu talav. work including construction of storage pit, supply, installation, testing and commissioning of pumping machinery and providing, laying and lowering of pvc pipeline from suction pit to ghanchiyu talav for vapi, vapi municipal corporation. (3rd attempt)
Tender For corrigendum : supply of de-centralized materials and works for increasing capacity and installation of tf under business plan 2025-26, edd-kachhawa - supply of following decentralized materials provide by contractor at the works site as per resspo norms., stone pad 300x300x75 mm, x-arms holding clamps with bolts & nuts, f-bracket with bolts & nuts, top, dropper channel clamp with bolts & nuts for st pole, top, dropper, t-off channel clamp with bolts & nuts for pcc pole, p.g clamps for weasel conductor, danger board with clamp & bolts, dead end clamp for pole/bracket with nuts & bolts, eye- hook, suspension clamp with nuts & bolts, j hook, all. binding wire 6 mm, 1x35 sq mm ac cable (xlpe), three phase distribution box, three phase distribution box clamp (ls), e-bracket with nuts & bolts, copper l-piece 50x225x10 mm, copper l-piece 62x225x12 mm, all lugs 240 mm2, all lugs 120 mm2, all lugs 70 mm2, stay clamp with nut & bolts for st pole, stay clamp with nut & bolts for pcc pole, stay insulator, cartage of following materials from esc, mirzapur provided by department to work site including loading & unloading charge., st poles 11 mtr long, pcc poles 8.5 mtr long, all line materials with acsr weasel conductor, arial bunch cable 3x50+1x35+1x16 mm2, arial bunch cable 3x95+1x70+1x16 mm2, transformer 250 kva, transformer 100 kva, transformer 63 kva, transformer 25 kva, erection, erection of single support st/pcc pole for construction of 11 kv/lt line including digging of pit, fitting of all accessories, back filling of earth & others required work as per resspo norms., grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per resspo norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost), grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per resspo norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost), earthing of poles as per resspo norms, stringing & sagging of 3 phase 11 kv line upto proper sag including laying of acsr weasel conductor, binding with insulators & jumpering as per resspo norms, laying, streaching of arial bunch cable size 3x50+1x35+1x16 mm2/ 3x95+1x70+1x16 mm2 as per resspo norms, erection of sectional double pole structure of st pole for distribution t/f, including digging of pit, fitting of all accessories, earthing of pole, back filling of earth, grouting of each pole & stay sets & other required works as per resspo norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost), erection of sectional double pcc pole structure for distribution t/f with the help of one pole already erected including digging of pit, fitting of all accessories, earthing of pole, back filling of earth, grouting of each pole & stay sets & other required works as per resspo norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost), construction of transformer plinth for 250 kva transformer of 2x2x1.5 mtr. including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials., well type earthing of 250 kva transformer by using b class g.i. pipe of 1.5 " dia and making hand pipe type earth boring iind strata of water or 60 ft. whichever is deeper about 6" of g.i. pipe shall remain above ground level 2 no. g.i. earth clamp shall also be welded to the portion of pipe which is above the ground level. through this g.i. clamp and g.i. strip 30x5mm duly galvanized shall be connected with nut & bolts. every dt shall have 2 such earthing, one earthing for t/f neutral and second earthing for t/f body. all requred materials shall by provided by the contractor., fencing of t/f with m.s. square mesh welded/fixed on m.s. angle of size 65x65x6 mm wi
Tender For : details supply of de-centralized materials & works for increasing capacity & installation of t/f under business plan 2025-26 edd-chunar - supply of following decentralized materials provide by contractor at the works site as per resspo norms., stone pad 300x300x75 mm, top, dropper, t-off channel clamp with bolts & nuts for pcc pole, e-bracket with nuts & bolts, copper l-piece 50x225x10 mm, copper l-piece 62x225x12 mm, all lugs 240 mm2, all lugs 70/95/120 mm2, stay clamp with nut & bolts for pcc pole, stay insulator, cartage of following materials from esc, mirzapur provided by department to work site including loading & unloading charge., pcc poles 8.5 mtr long, line materials with acsr weasel conductor, transformer 250 kva, transformer 100 kva, transformer 63 kva, transformer 25 kva, erection, erection of sectional double pcc pole structure for distribution t/f with the help of one pole already erected including digging of pit, fitting of all accessories, earthing of pole, back filling of earth, grouting of each pole & stay sets & other required works as per resspo norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost), construction of transformer plinth for 250 kva transformer of 2x2x1.5 mtr. including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials., well type earthing of 250 kva transformer by using b class g.i. pipe of 1.5 " dia and making hand pipe type earth boring iind strata of water or 60 ft. whichever is deeper about 6" of g.i. pipe shall remain above ground level 2 no. g.i. earth clamp shall also be welded to the portion of pipe which is above the ground level. through this g.i. clamp and g.i. strip 30x5mm duly galvanized shall be connected with nut & bolts. every dt shall have 2 such earthing, one earthing for t/f neutral and second earthing for t/f body. all requred materials shall by provided by the contractor., fencing of t/f with m.s. square mesh welded/fixed on m.s. angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing including cost of all materials., mounting of 25 kva transformer as per resspo norms, mounting of 63 kva transformer as per resspo norms, mounting of 100 kva transformer as per resspo norms, mounting of 250 kva transformer as per resspo norms, cartage of received back 10 kva transformer from work site to esc, mirzapur including loading & unloading charge, cartage of received back 16 kva transformer from work site to esc, mirzapur including loading & unloading charge, cartage of received back 25 kva transformer from work site to esc, mirzapur including loading & unloading charge, cartage of received back 63 kva transformer from work site to esc, mirzapur including loading & unloading charge, cartage of received back 100 kva transformer from work site to esc, mirzapur including loading & unloading charge
Tender For providing infrastructure and civilamenities under r&r scheme of polavaram project for kothamamidigondi site at kamayyapalem (v) of jeelugumilli (m) of west godavari district.sub-work.providing drinking water facilities i.e hand pumps and tap connections to amneties & selected earth filling amneties buildings to kottamamidigondhi site at kamayyapalem (v) of jeelugumilli (m) in west godavari district
Tender For providing infrastructure and civilamenities under r&r scheme of polavaram project for cheeduru site at p.narayanapuram -2(v) of jeelugumilli (m) of west godavari district.sub-work.providing drinking water facilities i.e hand pumps and tap connections to amneties & selected earth filling amneties buildings to cheeduru site at p.narayanapuram-2(v) of jeelugumilli (m) in west godavari district
Tender For providing infrastructure and civilamenities under r&r scheme of polavaram project for tekuru site at p.narayanapuram-1(v) of jeelugumilli (m) of west godavari district sub-work.providing drinking water facilities ie hand pumps and tap connections to amneties & selected earth filling amneties buildings to tekuru site at p.narayanapuram-1(v) of jeelugumilli (m) in west godavari district
Tender For corrigendum : provision of external electric supply for 661 sailors inliving accommodation at visakhapatnam - supply, installation, testing and commissioning of outdoor type step down transformer 1000 kva 11kv/433v dyn11 oil filled (onan) distribution transformer double copper wound with radiator wall with conservator tank & porcelain bushing for ht, lt with off circuit tap changer, marshalling box all as per is 1180 (part-1) : 2014, bee certified, energy efficiency level ii (as per latest ammendment no 4) complete as directed., a) off circuit tap changer (octc), tapping range +5% to -10% in a steps of 2.5% per step (7 positions)b) temp. rise shall be 40/45 deg. c for oil/winding resp. over an ambient of 50deg.c tempc) insulation class: ad) losses ( subject to is 1180 efficiency level 2/ star 2 as per latest amendment 4) max. total loss @ 50% loading: 2620 w and max. total loss at 100% loading: 7000 w.e) % impedance (%z) shall be 5.00% (subject to is tol.)f) rating & diagram (r&d) plate (fitted on transformer)g) oil temp. indicator (oti) with alarm and trip contacth) winding temp. indicator (wti) with alarm and trip contactj) rated temp class of transformer compartment k10 upto 1000kvak) lifting lugs/ hooks for transformer.l) oil filling inlet pipe with plug.m) air release valve and drain out pipe with plug.n) conservator tank with level guage.o) silica gel breatherp) first oil fill up to recommended level by manufacturer with new oil as per is 335.q) cable terminal boxes with bushes on both ht and lt sides.r) hv winding: delta & lv winding: star.note: civil work for the construction of foundation including necessary earthwork etc is deemed to be included in quoted rates of the item., supply and fixing main lt panel cpri approved made out of crca sheet 3.15 mm thick outdoor pedestal type totally enclosed with front and rear opening, hinged doors with projected an raised platform of suitable size, weather and water proof with necessary locking arrangements along with lugs, cable glands of various sizes for cables, danger notice plate, strickering of switcher gear about termination of switch gear, and the nuts/ bolts etc used are to be made of rust proof material incl as per al bus bar rated with insulators suitable for three phase and four wire lt ac, 50 hz 415 v 2000 a capacity complete with powder coating, necessary internal electric connection as required and provision of the following : (main lt panel)., incoming:air circuit breaker 1600 amps, 50 ka, mdo type, 4 pole, micro processor release, with adjustable type overload protection, short circuit protection, with necessary cts, meters and cable boxes. - 1 no.outgoing:a) mccb 250 amps, 25 ka, 4 pole, suitable for capacitive loads, thermal magnetic release, with adjustable type overload protection, short circuit protection - 07 no (bldg vtpn 02 nos, bldg panels 04 nos + spare)b) mccb 140 amps, 25 ka, 4 pole, suitable for capacitive loads, thermal magnetic release, with adjustable type overload protection, short circuit protection - 01 no (dg amf panel)c) mccb 160 amps, 25 ka, 4 pole, suitable for capacitive loads, thermal magnetic release, with adjustable type overload protection, short circuit protection - 01 no (ff panel)d) mccb 100 amps, 25 ka, 4 pole, suitable for capacitive loads, thermal magnetic release, with adjustable type overload protection, short circuit protection - 01 no (apfc panel)e) intelligent panel meter to measure voltage, current, frequency, power factor, kwh etc with all connected cts.f) led indicating lamps with colour red, yellow, blue of 03 sets.note: civil work for the construction of foundation including necessary earthwork etc is deemed to be included in quoted rates of the item., supply & fixing of perforated gi cable tray of size 150 mm width x 50mm depth x 1.6mm thickness with perforations not more than 17.5% in convenient sections, joined with connectors, suspended from the ceiling with gi suspenders including bolts & n