Web Analytics Made Easy - StatCounter

Setting Tank Tenders

Get complete information related to latest Setting Tank Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Setting Tank Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Setting Tank Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government And Public Sector

CTN :36258892 Due date: 11 Jun, 202411 Jun, 2024 1.21 Lacs
Tender For removal of slurry/sludge from storage tanks of seal and lube oil, oil reservoirs, product storage tanks, condensate catch pots another ancillary tanks in xu, carrying out the functional testing of dd valves during mta-2024 and to erect,maintain,.etc.

Central Government/Public Sector

CTN :36241439 Due date: 04 Jun, 202404 Jun, 2024 NA
Tender For providing of custom bid for services - removal of sludge from pickling plant at sstp bhel trichy-pickling plant process sludge removal and disposal- 1. work permit shall be obtained from the concerned executive in-charge for carrying out the cleaning work before starting work. 2. phosphate bath will be handed over for cleaning after pumping solution to holding tank by cmp/sstp. as the sludge will tend to get dried and solidified, cleaning activities shall be commenced immediately after draining bath. 3. phosphate sludge present in the bath shall be thoroughly removed and collected in barrels / boxes without spillage on floor. contractor shall coordinate with maintenance dept. for fabricating boxes/barrels. 4. phosphate sludge filled barrels shall be moved to covered shed identified for storage with the help of vehicle and dumped on the floor. contractor shall bring vehicle for movement of barrels without spillage on floor. sludge removal/movement shall be completed on the same day itself as the chemical is to be stored in covered shed only. contractor has to ensure required manpower to complete the work as per schedule given by cmp/sstp. 5. contractor has to inform no. of barrels being moved to cmp/sstp for documentation purpose. 6. sedimentation pit will be handed over for cleaning after pumping water to recycling pit by cmp/sstp. as the sludge will tend to get dried and solidified, cleaning activities shall be commenced immediately after draining pit. 7. sedimentation sludge present in the pit shall be thoroughly removed and collected in tanks/boxes without spillage on floor. contractor shall coordinate with maintenance dept. for fabricating tanks/boxes. 8. sedimentation sludge filled tanks/boxes shall be moved to identified area/pits for storage with the help of vehicle and dumped into the pit. contractor shall bring vehicle for movement of tanks/boxes without spillage on floor. sludge removal/movement shall be completed on the same day itself as the chemical is to be stored in identified area only. contractor has to ensure required manpower to complete the work as per schedule given by cmp/sstp. 9. contractor has to inform no. of tanks/boxes being moved to cmp/sstp for documentation purpose. 10. the contractor shall provide all safety devices and personal protective equipment to their workmen at their own cost and shall ensure that their workmen wear such ppes (rubber gloves, leather gloves, respirator, apron & cum boot) while doing the work and there should not be any relaxation on this

Central Government/Public Sector

CTN :36092591 Due date: 20 May, 202420 May, 2024 NA
Tender For corrigendum : providing of repair, maintenance and installation of plant/ systems/equipments - industry unit; biennial rate contract for miscellaneous maintenance jobs in all plants administration departments at rcf thal; biennial rate contract for miscellaneous maintenance jobs in all plants administration departments at rcf thal.- 1.00 product (dmac/amine solution) drum (205lts) filling and loading on trucks using proper care., 1.01 unloading of empty drums & stacking in proper order from truck to loading-shed. , 1.02 drum filling, sealing & arranging in order, 1.03 loading of filled drums in trucks, 2.00 catalyst drum movement (205 ltrs) using proper care., 2.01 unloading of filled drums from stores trucks & stocking in proper place., 2.02 shifting of filled drum to plant at unloading points., 2.03 unloading of drums in catalyst tanks, 3.00 spent catalyst /heavy ends (dmac) movement using proper care, 3.01 shifting of empty drum to plant at unloading points., 3.02 manual transferring of spent catalyst from filter to empty drums., 3.03 transferring of drums to storage area, 3.04 loading in trucks, 4.00 oil drum shifting, 4.01 unloading of filled drums from stores trucks & stacking, 4.02 transfer to 35 ltrs cans & filling of oil at lubrication points, 5.00 house keeping in cgp, 5.01 cgp plant area, 5.02 dmac plant area, 5.03 methyl amines plant area, 5.04 storage & c.t. area, 6.00 cooling water chemical dozing (25 kgs of 8 types of chemicals), 6.01 unloading of any chemicals from trucks & stacking at required places, 6.02 dosing in 10 kg quantities (any chemical), 7.00 n.d. area waste oil recovering section in etp, 7.01 waste oil collection in drums, stacking, 7.02 loading of filled drums in stores truck, 7.03 cleaning of foot valves of nd pumps (one time), 7.04 cleaning of mesh of nd pit incoming channel (one time), 7.05 cleaning of floating & deposited solids at underground pumping station/pits , 7.06 lifting /loading/unloading of chemicals for every 15 kg within etp, 7.07 housekeeping etp area & chemical house, 7.08 sludge removal from nd/sd area (one time), 8.00 heavy water plant- 25 unit, 8.01 recovery collection of acidic heavy water from 18 unit trappers into carboys of 35 lts. capacity, shifting to 25 unit and transfer into 205 ltrs s.s. drums, 8.02 empty drums (205 ltrs) cleaning, shifting, washing with dm water & rinsing , 8.03 205 litr. empty drums of hw weighing & placement, 8.04 205 litrs. filled drums of hw weighing & placement, 8.05 preparation of alkali (koh) for neutralization of recovery time., 8.06 drum sealing, 8.07 potassium metal unloading & loading of empty drums approx. 104 drums in one truck load, 8.08 loading & unloading of hw filled drums 205 ltrs, 8.09 loading & unloading of hw empty drums 205 ltrs, 8.10 resin bed preparation by draining of heavy water to buckets & collection in 205 litrs drums, filling of reject through top into bed (2nos), draining after 24 hrs.transferring of hw to 205 ltrs drum, removal of resin from bed, filling of resin after flange box up, & resin bed with reject., 9.00 "central stores : mannual loading/unloading of material for delivery from stores &, unloading at plants at required area to any plant/plants.", 9.01 for half tempo load, 9.02 for full tempo load, 9.03 for half truck load, 9.04 for full truck load, 10.00 central stores : for loading/unloading of material with the help of crane/fork lifter etc., 10.01 for half tempo load, 10.02 for full tempo load, 10.03 for half truck load, 10.04 for full truck load, 11.00 central stores : for manual loading/unloading of the filled drums to be delivered to the plants from stores, 11.01 200 lt capacity drums, 11.02 100 lt capacity drums, 11.03 50 lt capacity drums & bags, 11.04 20lt capacity drums, 12.00 urea plant (production) for any of 11/21/31 unit, 12.01 washing of total plant are ground floor., 12.02 washing of prilling tower top and bottom floors
 Loading, Please wait...

Connect us via What's Up