Web Analytics Made Easy - StatCounter

Sieve Plate Tenders

Get complete information related to latest Sieve Plate Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Sieve Plate Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Sieve Plate Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :38519096 Due date: 30 Dec, 202430 Dec, 2024 NA
Tender For repair of vehicle fuel filter element primary , fuel filter element secondary , lubrication oil filter , sealing washer , air filter , engine oil , differential oil , clutch plate assembly , pressure plate assembly , main connecting bearing , gaskit set complete , brake pad and disc , brake cylinders rear and front , brake fluid , m and l universal joint cross kit of suitable size , ball bearing , carbon brush , liner blade , calibration of fip , coolant 4 ltr , door oblique window glass with rubber beading complete , door lock assembly , seat cover repair and steaching , shocker rear and front , denting, painting and welding of bend, rusted and corded area with ms sheet as per existing , colouring after repairing obique scratching disturbed surfaces complete ad given in tech specification , replacement of complete wiring of dashboard and bounet , repairing of gear box , dismentling of fuel tank including cleaning of tank and refixing existing position

State Government

CTN :38562579 Due date: 11 Dec, 202411 Dec, 2024 20.00 Lacs
Tender For supply of machines and laboratory equipment for civil engineering consultancy lab in the premises of government polytechnic siwan, bawandih, siwan- 841203 - ultra sonic pulse velocity instrument , rebound hammer split tensile strength attachment , water bath , cube sieve shaker , cbr test , , brass sieve plate bearing test apparatus , , heavy proctor test , gi sieve( 450mm dia) , laboratory permeability apparatus ( constant head & falling head) , hydrometer apparatus , pycnometer , specific gravity and water absorption , fatigue testing machine

CTN :38533852 Due date: 01 Jan, 202501 Jan, 2025 NA
Tender For supply of sieve plate distillation column

CTN :38320086 Due date: 18 Dec, 202418 Dec, 2024 NA
Tender For corrigendum : supply of cathodic protection on arc basis for 2 years - excavation and backfilling size 1 c x 16 sq mm , r1 cable jointing repairing of underground cable as per approved procedure including excavation and backfilling size 1 c x 25 sq mm , r1 cable jointing repairing of underground cable as per approved procedure including excavation and backfilling size 1 c x 35 sq mm , r1 making of pipe to cable connection , r1 painting of manual test station including removing of old paint rust etc , r1 painting of anode lead junction box , r1 painting of tr cppsm units including removing of old paint rust etc , r1 supply and replacement of copper copper sulphate permanent refrenece cells , r1 supply of portable cu cuso4 half cell for measuring of psp pipe to soil potential of pipeline , r1 supply and installation of explosion proof spark gap arrestors make across insulating joints at drs mrs etc , r1 supply installation and commissioning of polarization cell along with the enclosure suitable for housing of polarization cells , r1 preventive maintenence of polarisation cells , r1 supply and installation of pre packed magnesium anodes with cable having weight 17 pounds , r1 supply and installation of pre packed zinc grounding cell 22kg htype , r1 supply and installation of pre packed zinc grounding anode weight 17 lbs , r1 preventive maintenance of anode ground bed , r1 sitc of earthpits , r1 halfyearly monitoring of earthpits , r1 recharging of existing earth pits , r1 chamber repair of earth pit , r1 earthpit chamber ms cover thickness , r1 supply and installation of cable markers , r1 carrying out on off close interval potential logging , r1 carryingout direct current voltage gradient , r1 stray current interference survey at railway crossing or runnig parallel to gail gas pipelines , r1 stary current interference survey at foreign pipeline crossing or runnig parallel with gail gas pipeline , r1 stray current interference survey at ht crossings or runnig parallel to gail gas pipelines , r1 excavation and backfilling of pipeline in all type of soils and ordinary rocks , r1 coating repair removing the old damaged coating rust greese moisture and all foreign material at defect material with scrapper , r1 cat survey of un piggable pipelines at every 10m interval , r1 supply installation and commissioning of earth pits , r1 supply installation and commissioning of maintenance free earth pits , r1 supply and laying or erection of 25 mm x 3 mm gistrip upto half metre below ground , r1 supply and laying or erection of 50 mm x 6 mm gistrip upto half metre below ground , r1 supplying and coating of r95 , r1 breaking of rcc surface for the construction of earth pits etc , r1 breaking of pcc surface for the construction of earth pits etc , r2 supply and installation of manual test station complete with lower bend and with pcc foundation , r2 supply and installation of manual test station with out lower bend and with out pcc foundation , r2 shifting of manual test station along with foundation and cable to suitable location as per instruction of eic , r2 repairing of manual test stations foundation with supply and replacement of foundation bolts and nuts , r2 repairing of manual test stations including supply and replacement of damaged door , r2 supply and replacement of damaged or missing locks in manual test station including labor consumables tools and tackles , r2 supply and replacement of damaged or missing doors in manual test station , r2 supply and installation of damaged missing terminal plates all types , r2 supply and fixing of diagram plate in the existing test station of all types complete in all respect , r2 supply installation testing and commissioning of anode lead junction box , r2 repairing of bid details/ 2 / 93 aljb including supply of new locks and latch for the outer enclosure , r2 supply of 1c x 4 sqmm , r2 supply of 1c x 6 sqmm , r2 supply of 1c x 10 sqmm , r2 supply of 1c x 16 sqmm , r2 supply of 1c x 25 sqmm , r

corporations/Associations/Others

CTN :38329893 Due date: 19 Dec, 202419 Dec, 2024 1.83 Crore
Tender For corrigendum : supply of the of gear & gear parts to nwkrtc. - dowling pin , carrier, assbly drum shaft 8.47, eicher plate holding, eicher rail gear shaft rev, eicher reverse jaw, eicher jaw gear shaft - 1, eicher rail 5/6, eicher rail 3/4, eicher jaw gear shaft, eicher assembly pin spring, eicher circlip, eicher cylinder roller brg, eicher o ring, eicher shaft, eicher washer rev idler, eicher 5th ms brg, eicher split pin, eicher bs-iii poppet terra 25, eicher bs-iii o ring , eicher bs-iii bushing shaft, eicher bs-iii bush cross shaft, eicher bs-iii pin lock for mini tower, eicher bs-iii selector lever, tata assembly housing block, m s 3rd gear , selector shaft - 3, selector shaft - 2, needle bush, spherical washer, thrust washer crown pinion, crown pinion set eicher, ball joint assembly rh, sub assembly ball joint - 2, selector pin, washer 4th/5th - 1, gear shifter milling bs-4 tc, sub assembly ball joint - 1, sub assembly ball joint, circlip crown, ball steel eicher, clutch relaser shaft, assembly case upper eicher, shim upper , washer g/s upper, thrust washer rev gear, eicher sensor ring, washer 4th/5th, eicher cone synchronisercro, gear change finger - 1, circlip kii, diff spider kit, companion flange , output flange, circlip - 5, spring pin - 1, synchroniser hub, lower pin ball terra, synchroniser assembly, poppet, circlip - 4, shifter shaft, selector and shifter shaft (rhd), assembly selector shifter fork with gear shifting lever, selector and shifter yoke, circlip - 3, circlip - 2, circlip - 1, circlip - 6, selector shaft - 1, s/a of detent plunger, gear side diff - 1, crown wheel pinion, crown wheel pinion - 1, ball joint r.h. - 2, upper pin ball terra, block terra, ring terra, ball terra, spring terra, poppet terra, inner fing terra, spring 2nd/3rd synchroniserchro, fork wear pad, gear box lock kit, bearing sleeve 4th/6th speed, synchroniser kit - 1, shifter shaft 1st/2nd - 1, shifter shaft 1st/2nd, clutch cone terra, detent spring, needle bush for gear lever kit, shifter shaft (3rd/4th speed) midi, circlip for 5th gear, circlip for 4th gear, circlip for 3rd gear, od selector plate, ms 4 gear bs-iv, fork, 2ndand3rd gear shift et40s6 , counter shaft for 6th gear (od gear) 6.71 ratio (et70s6) , constant mesh gear (6th gcs) 7.33 ratio (et70s6) , gear reverse idler , synchroniser ring - 1, clutch body ring terra 25 , bearing sleeve 5th gear et70s6 , reverse gear main shaft - 1, synchroniser hub , sleeve synchroniser 4th/ 5th , synchroniser hub 1st/2nd , synchroniser hub 2nd-3rd (hcv) , sleeve 2nd-3rd synchroniserchro (hcv), gear assemblynchroniser 6th (od) et 70s6 (6.71 ratio) , detent pin , lever, cross shaft bs-iii, od fork assembly-et70s6, synchroniser sleeve, synchroniser ring, circlip 2.2 thick, selector cable assembly, shifter cable assembly, circlip-2.5 thick, ball joint for gear shifter cable, spacer - 3, cross shaft, od gear on ms 21 teeth, drive assembly 6th gms, circlip 30, dp assembly 6.71 ratio, extended outer lever, ball joint, lever cross shaft srgsl, nut main shaft m30x1.5, brass pad midi, circlip 55 gb eicher, thrust washer 2nd gear, circlip 2.03 gb midi, service kit bushing, gmset 70s6 3rd, bearing sleeve 2nd gear, brg sleeve 2nd gms, thrust washer iii-iv gear, main shaft, assembly 4th 5th synchroniser sleeve, sleeve synchroniser, synchroniser assembly 2nd/3rd, synchronising assembly 1st/2nd, main shaft 2nd gear , main shaft 1st gear , nut main shaft m36x1.5, threaded pin gb60, synchronising ring (5th speed), fork gear shift 1st and 2nd, fork reverse et70s6 , main shaft 4th gear - 1, ball synchroniser, clutch body ring ring (hcv), driver pinion, main shaft 4th gear, counter shaft, c/s 4th gear, idler differancial, synchroniser repair kit, circlip kit - 1, assembly housing block - 1, brass pad, compression sparing bs-iii, shifter shaft 3/4th, spring pin, shifter fork 1/2/3/4 speed, shifter fork 1/2/3/4 speed - 1, assembly detend, forth speed gear - 1, constant mesh gear c/shaft - 1, oil slinger, roller
 Loading, Please wait...

Connect us via What's Up