Get complete information related to latest Siren Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Siren Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Siren Spares Tenders.
Tender For supply of led based locomotive warning light system. one set consisting of two items, 04 nos.1) lamp unit with mounting hood - 02no./set 2) control unit - 02no./set. rdso spec. no. rdso /elrs/spec/flasher light/0017 (rev. 1) sep. 2004 [ warranty period: 30 months after the date of delivery ]
Tender For supply of led based locomotive warning light system for electric locos type 'e' as per rdso specification no. elrs/spec/lfl/0017 (rev.1) dt.16/09/2004. or latest. one set comprising of 03 items 06nos.(1) lamp unit=02 nos/set. (2) mounting hoods (with all accessories)= 02 nos/set. (3) control unit=02 nos/ set [note:- latest rev. will be acceptable ]
Tender For supply, installation and testing of dump body raise warning system in 12 nos. cat 773e (60 te) dumpers and 02 nos. beml bh-100 (100 te) dumpers operating at dipka expansion project.
Tender For corrigendum : providing of custom bid for services - providing and fitting of alarm and warning system to detect tilt and leakages in the pontoon for compliance of contravention by dms mech at various mines of majri area
Tender For corrigendum : supply, design, manufacture, installation, testing, commissioning of heavy duty elevator of machine room and gear less type, microprocessor based vvvf ard system hospital stretcher lift (g+6) for 15no. passenger capacity complete with all accessories, floor announcement system, intercom, overloading warning system, doors car & landing shall be stainless steel scratch resistant etc. as per rdso specification no. rdso/2013/em/spec/0016 (rev-2) -2025 or latest with amc period of 10 years after expiry of warranty period). warranty period: 30 month(s) from the date of supply or 24 months from the date of commissioning. [ warranty period: 30 months after the date of delivery ]