Tender For corrigendum : etc of boiler and power cycle piping at 2x800 mw dvc koderma tpp stage-ii - koderma- etc of boiler including pcp, total price for entire scope of work as per tender no.: bhel/cpc/kod/blr_pcp/26/076 for section-i of package-a: unit # 1 - erection, testing, commissioning, trial operation & handing over of boiler and its auxiliaries including pressure part, non-pressure parts, power cycle piping, duct dampers and its support structure, rotating equipment, air pre-heaters, id/fd/pa fans, mills, refractory, etc including handling of materials at bhel / clients stores / storage yard and transportation to site, preparation of foundation, ndt, fixing of hangers & supports, application of lining, insulation, supply & painting, stenciling & labelling etc., at 2x800 mw dvc koderma tpp stage-ii.
Tender For corrigendum : construction of new academic block g plus 4), modern digital library (lgf plus 1 plus g plus 2), academic block for uils at ava lodge (g plus 3) and multi-level car parking (basement plus 3 plus g plus 1) including development of site. (sh preparation of structural design and drawings for the building and retaining walls and other sporting structure including design and preparation of drainage plan, layout of water supply, sewerage service layout and calculation of earth work etc).
Tender For corrigendum : supply of preliminary site visit data collection mobilization of instrument at location and preparation of report for each building , testing work as per the standard method for the below mentioned rates , compressive strength , specific gravity , water absorption , weathering , load test on stone slab
Tender For corrigendum : nagar nigam meerut water supply scheme zone 567 - survey, soil investigation, design, supply of all materials, labour, t&p etc. required for construction, erection, completion, testing and commissioning of water supply works including (but not limited to) rcc oht (4 nos.), rising main, distribution system, tube wells, pump house, boundary wall and sitedevelopmentworks etc. and other appurtenant works including scada and automation on turnkey basis as per specifications in tender document for nagar nigam meerut water supply re-organization scheme zone 5, 6 &7. the scope of work also includes trial run of 03 months and defect liability period of 12 months for civil works and 24 months for e/m works which shall start after completion of successful trial & run. all completed and commissioned work under nagar nigam meerut water supply re-organization scheme zone 5,6 &7 shall be handed over to meerut nagar nigam after 03 months successful trial run period.
Tender For preparation of dpr for the work construction of checkdam across local nala near karegudda, daddal (site-02 & site-02), budinni and karabdinni village in manvi taluk, construction of checkdam across local nala near mittimalkapur and malliyabad village in raichur taluk and construction of checkdam across local nala near nalgamdinni village in manvi taluk raichur district.
Tender For preparation of dpr for the work construction of checkdam across local nala near ballatagi and katarki (site-01 & site-02) village and nala improvement work in manvi taluk,construction of checkdam across local nala near chikkalparvi village in manvi taluk and construction of checkdam across local nala near devipura village in manvi taluk raichur district.