Web Analytics Made Easy - StatCounter

Solenoid Valve Tenders

Get complete information related to latest Solenoid Valve Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Solenoid Valve Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Solenoid Valve Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :41820514 Due date: 22 Sep, 202522 Sep, 2025 NA
Tender For supply of solenoid valve assembly for bvht system of m/s amit engineers make : amit engineer or similar. modal : vt043 or similar. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :41820491 Due date: 24 Sep, 202524 Sep, 2025 NA
Tender For supply of nitrogen cylinder capacity 24l, 200 bar with pressure gauge fitted with fire-rated automatic fire suppression activation solenoid valve with manual override lever duly filled with nitrogen at 200 bar for fdss, make: fogpro. [ warranty period: 30 months after the date of delivery ]

State Government

CTN :41825719 Due date: 18 Sep, 202518 Sep, 2025 45.08 Lacs
Tender For procurement of fire protection solenoid valve with coil and vacuum breaker solenoid valve with coil installed at 210 mw atps, mppgcl, chachai

Central Government/Public Sector

CTN :41829615 Due date: 18 Sep, 202518 Sep, 2025 NA
Tender For solenoid valve for tdbfp governing-stage iv ntpc unchahar

State Government

CTN :41821215 Due date: 15 Sep, 202515 Sep, 2025 NA
Tender For work contract for servicing of hp bypass system with fast operating device (fod) and servicing of various solenoid valves during aoh of unit-5.

Central Government And Public Sector

CTN :41819412 Due date: 29 Sep, 202529 Sep, 2025 NA
Tender For solenoid valve, plasser part no. hy157.44-a sub. hy157.44. veljan-denison part no. vv01-311-goq-e1. make: plasser, veljan-denison. warranty: 30 months from the date of supply. [ warranty period: 30 months after the date of delivery ]

Central Government And Public Sector

CTN :41820567 Due date: 25 Sep, 202525 Sep, 2025 NA
Tender For supply of nitrogen cylinder fire rate solenoid valve with manual override lever. [ warranty period: 30 months after the date of delivery ]

State Government

CTN :41818563 Due date: 08 Oct, 202508 Oct, 2025 NA
Tender For solenoid valve along with coil for main turbine extraction nrvs of ktps-vi stage

CTN :41814337 Due date: 24 Sep, 202524 Sep, 2025 NA
Tender For supply of distributor head , roller pin , solenoid valve , pressure control valve , vane pump , pump housing , roller , friction washer

CTN :41761965 Due date: 16 Sep, 202516 Sep, 2025 NA
Tender For supply of equipment for electrical and electronics engineering department - supply of equipment for electrical and electronics engineering department:, plc with digital & analog i/o moduleinbuilt power supplyadditional voltage sources 12v,5v8 digital inputs with indication led s6 digital outputs with indication led s2 analog inputs with inbuilt ldr potentiometer2 analog outputs with inbuilt dc motor speed controlpower on/off indication led sinbuilt push button:3 inbuilt latch switch:2inbuilt toggle switch:2inbuilt buzzerusb port for programmingconnecting cableswooden enclosure, interfacing of discrete field devices with plc kitsequence of operation:develop ladder logic in plc to execute the following logical relation between the input and output field devices.y= a+b+c+dy= a.b.c.dy=(a+b).(c+d)y= (a.b)+(c.d)interface specifications:plc input interfacing push button(a)limit switch (b)reed switch (c )3wire inductive proximity sensor (d)plc output interfacing buzzer (y)wooden enclosure, plc based water level control systemsequence of operation:develop and execute ladder logic in plc to fill the empty tank with liquid when the start button is pressed. when liquid reaches the high level, turn off the pump motor and turn on the solenoid valve to drain the liquid from tank. when liquid reaches the low level, turn off the solenoid valve and turn on the pump motor for refilling. interface external pilot lamp with plc to indicate the operation of pump motor and solenoid valve.interface specifications:level sensors as input to the plcwater tap as output from the plcwater pump motor control using outputs of the plcwater tank with sump2levels sensor switchespumps for filling tanksolenoid valve to drain water.12v and 24v power supply unitssteel enclosure, plc based forward and reverse control of induction motor kit. sequence of operation:develop and execute ladder logic in plc to control three phase induction motor in forward and reverse direction of rotation. interface external pilot lamp with plc to indicate the direction of rotation. check the output by interfacing plc with three phase cage induction motor.interface specifications:3 phase main contactors.3 phase input, fusesstop, start forward, start reverseforward, reverse indication lamp.proper terminal for 3 hp cage motorsteel enclosure, plc based conveyor system with prewarning siren kit sequence of operation:develop and execute ladder logic in plc using an on delay timer to delay the start of a conveyor. while press the start button, activate the warning siren for pre-set time. after the pre-set time delay the warning siren turns stop button is pressed turns off the conveyor.interface specifications:conveyor setupplc input interface start, stop push switches.plc output interfacing siren output to give alarm.plc output interfacing conveyor belt with geared dc motor drivessteel enclosure, plc based counting of moving objects on a conveyor kit sequence of operation:develop and execute ladder logic in plc for counting the object moving in the conveyor. interface manual start and stop push button to operate the conveyor motor and proximity sensor detect the object. interface buzzer to give beep sound while sensor is detecting the product. when the pre-set value of count has reached turn off the conveyor automatically.plc based counting of moving objects on two conveyors kit. sequence of operation:a manufacturing plant is arranged with two feeder conveyors for transferring the objects into the plant. develop and execute ladder logic using math instruction in plc to get the total number of objects transferred by two conveyors into the plant. when the total object count has reached pre-set count value, turns on buzzer to give beep sound for 1 second and turns off the conveyors.interface specifications:conveyor setupplc input interfacing proximity sensor with each conveyor to sense the object.plc input interfacing start push switch and stop push switchesplc output buzzer output to give ala
 Loading, Please wait...

Connect us via What's Up