Tender For auction sale of depot ferrous scrap - m s heavy melting actual lot no. 03122605 0516. pl no.98050047 (15) (hsn code 72044900-gst18% on fcm basis) ms scrap of cond. & unserviceable heavy melting angle and channel pcs, rod pcs stands valves levers bolts and nuts rivets washers pins dv covers bushes brake shoes shackles shackle stones strips j bolts hand brake wheels latches toothed segments foot steps hanger brackets bevel gear wheels horizontal levers door hinges flanges wedges cut bits, ms sheets side barer housings pipe pcs. straps, packing plates, jacks, mould shoes, liners sheets pipe pcs. pins throwers locks races collars axle box covers, liners, and other miscellaneous items of wagons s&t and ttm sorts & sizes full or broken with or without attachments. location: road no.3 (image attached) (note: 1. if any ss/ corten steel & non-ferrous items found during loading / delivery shall be return to the railways by the purchaser 2. in case of clubbed lots, purchaser has to clear the lots in the sequence as mentioned in the lot description and no deviation is accepted. 3. no picking and choosing of material is permitted while taking delivery )
Tender For supply of equalising lever with bushes to rdso's sk.- 69597, item. no.-1,5,6&7 alt. 43(forty-three). material and specification as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For grass and bushes cutting at inside the campus as well as surrounding boundary area of the residential colony of 400/220/132 kv substation, srinagar (g)
Tender For corrigendum : supply of set of bushes for bk. rigging of wap4 locos, consisting of 09 items in each set as per annexure to mn steel to irs : r-65-78. [ warranty period: 30 months after the date of delivery ]
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of
Tender For supply of set of bushes for cylinder assly. of e.p.contactors , wco/reverser & relaysfor emus, comprising of 04 items, qty. per set, item no 1 = 01 no, item no 2 = 04 nos, item no 3 = 04 nos & item no 4 = 06 nos. specn: kpa drg. no. er/kpa/el/ct.4he.2305c. [ warranty period: 30 months after the date of delivery ]