Web Analytics Made Easy - StatCounter

Steel Scaffolding Tenders

Get complete information related to latest Steel Scaffolding Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Steel Scaffolding Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Steel Scaffolding Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :36075301 Due date: 11 Jun, 202411 Jun, 2024 NA
Tender For bid to ras providing of custom bid for services - cpclh24169 rate contract for erection and dismantling of steel scaffolding at cpcl manali

Central Government/Public Sector

CTN :36266786 Due date: 13 Jun, 202413 Jun, 2024 NA
Tender For supply of 100235525_ 10_ m0158406021_ sheet: roof cladding, metal, 0.5mm

CTN :36257705 Due date: 18 Jun, 202418 Jun, 2024 NA
Tender For supply of cooling pipeline with filter and suction strainer , fuel system pipeline with pre filter , lub oil pipeline with filter , exhaust system pipeline with lagging with metal cladding and exhaust silencer , fuel tank with level glass and pre filter in the fuel filling line to the tank , lub oil tank with level glass and pre filter in the fuel filling line to the tank , fuel and water system valves , oil system valves , engine on dg base frame , control panel with limit switches and control switches , fuel flow meter in the fuel system for monitoring readings from the remote and local panel , exhaust gas analyser in the exhaust system , noise enclosure for da , switchboard and associated cabling junction box for taking da on load with proper earthing , remote monitoring panel for monitoring all da parameter remotely , existing air starting motor to electric start with two batteries , industrial exhaust fans , insdustrial lights with minimum 250 lumens , engine de preservation , conduct of safety device checks , conduct of fuel system lub oil system independent checks , endurance trials for 24 hours followed by conduct of full load trials of da
 Loading, Please wait...

Connect us via What's Up