Tender For testing of 220/132 kv relays installed at 220/132 kv grid sub-station at phaphund, dadri and 132 kv tr. line relays at various traction sub-stations/switching station/dfccil lilo circuit & calibration of testing equipment's in jjk-gzb section over prayagraj division of n. c. railway (for two years)
Tender For purchase of (a) 33 kv (d c) lattice structure (42 ft long) (b) 33 kv (s c) lattice structures (36 ft long) (c) 33 11 kv sub-stationstructure (urban area) against tn-5050.
Tender For providing of energy audit service - lumpsum based - detailed; railway traction system-mandatory energy audit of traction sub- station/ gorakhpur,energy audit service - lumpsum based - detailed; railway traction system-mandatory energy audit of electric loco shed/ gorakhpur,energy audit service - lumpsum based - detailed; railway traction system- mandatory energy audit of conventional electric locomotive (passenger) (wap-4) at gorakhpur,energy audit service - lumpsum based - detailed; railway traction system-mea of conventional electric locomotive (goods) (wag-5) at gorakhpur,energy audit service - lumpsum based - detailed; railway traction system-mea of regenerative electric locomotive (passenger) (wap-7) at gorakhpur,energy audit service - lumpsum based - detailed; railway traction system-mea of regenerative electric locomotive (goods) (wag-9) at gorakhpur,energy audit service - lumpsum based - detailed; railway traction system-mea of diesel locomotive (goods) at gorakhpur
Tender For design/modification, supply, erection, testing and commissioning of 132kv/55 kv scott connected traction substation and switching posts with at between feeding bhadanpur (incl.) - manikpur (excl.) - satna (incl.) - rewa (incl.) section (without scada) of jabalpur division, w c railway in connection with up-gradation of electric traction system from 1x25 kv to 2x25 kv traction system of wcr to meet 3000 mt loading target.
Tender For design, supply, erection, testing and commissioning of traction sub- station (tss), sectioning post (sp) and sub-sectioning and paralleling posts (ssps) in 2x25kv at system with scott-connected transformers in bellary (bay) - guntakal (gtl) section of guntakal division.