Get complete information related to latest Tap And Die Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tap And Die Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tap And Die Tenders.
Tender For supply of measuring instruments and basic equipments for toolrppm - micrometer , digital micrometer , inside micrometer , depth micrometer , vernier caliper , digital vernier caliper , vernier dial caliper , slip gauge set , sine bar , bevel protractor with acute angle attachement , universal digital bevel protractor , plunger dial gauge , bore gauge set , lever dial gauge , snap gauge go and not go 25- 50mm , height gauge , steel measuring tape , try square , scriber , centre punch , bench vices , hammer ballpeen withhandle , mallet , dot punch , spirit level type 2 , universal scribing block. , v-block pair with clamps , angle plate , punch letter set , punch number set , taps anddies complete set in box , steel rule 30 cm graduated both in english and metric units , tapanddie set in box metric pitch 6 mm to 12 mm , feeler gauge , radius gauge , hss tool , hack saw tubular metal frame adjustable , hack saw blade , file flat second cut , file flat smooth , file half round second cut , file knife edge smooth , file feather edge smooth , file triangular smooth , file round second cut , file square second cut , file triangular second cut , file flat second cut safe edge , file flat bastard , file swiss type needle , file half round second cut. , file half round bastard. , file round bastard. , clamp c , hand reamer set , taper pin straight flute , round punch , thread pitch gauge both metric and inch , screw driver set with multiple heads , allen key hexagonal , spanner set double side open end , spanner set one side open end and other side ring head , apron
Tender For corrigendum : purchase of sports exercise physiology lap equipments - cardiopulmonary exercise testing system system should be compact can be used in laboratory operation and low maintenance costs and easy servicing. system should be state of the art computerized telemetry breath test analyzer for on-line breath by breath measurement of exercise test of respiratory system to measure following parameter: time, ve, bf(rr), hr, feo2, feco2, peo2, peco2, vo2, vco2, ve/vco2(eqco2), ve/vo2(eqo2), rq(rer), vd/vt, vo2/kg, vo2/kg/hr, met, watt(work), hr, ttot, ti, te, ti/te, ti/ttot, pef, pif, br, vet, sum, tv/te, o2 kinetics, oxygen deficit, oxygen debt parameters and indirect calorimetric. wireless hr recording system, indirect cardiac output by wassermann algorithm system should comply ats and ers guide line and it should be ce certified., iso certified system should have automatic ambient conditions measuring system. system should work under temperature range 0 to 50 celsius. system should have facility for automatic calibration of analyzers. volume transducer calibration with precision calibration syringe. system should meet following technical specification flow rate measurement: measuring headpiece should be either through turbine /dvt/ pneumotach and dead space less then 40 ml, it should not be affected by humidity , flow range +/- 18 l/s and accuracy 2% oxygen analyser : should be either electrochemicalcell/paramagnetic and measurement range 0- 100 %,response time t90 100 ms and accuracy +/-0,04 % and- resolution 0,02 %carbon dioxide analyser : should be ndir (infraredabsorption) and measurement range 0 - 10 %,-response time t90 90 ms , accuracy +/- 0,04 %, andresolution 0,02 % software should support latest windows or latest andin corporate customized predicted normal equations.software should be capable of changing graphics displays during real time testing. system should have facility for automatic treadmill or bicycle ergo meter control. should be supplied with software, standard accessories for operation manual carrying case for field use. system should be supplied with latest data acquisition system, deskjet printer and ups. system should comply en iso 13485:2003, en iso 9001:2000, ec certificate93/42/eec, programmable treadmill running machine with user terminal (display &keyboard) stand- alone and remote control via rs232 running surface: l:170 cm (minimum), w: 65 cm (minimum) maximum possible load: 200 kg (440 lbs) speed range: 0-40 km/h elevation: 25% (14 maximum elevation) motorized adjustment, reverse belt rotation. motor system 3.3 kw, single phase ac motor, maintenance free and brushless power transmission: frequency inverter, poly v- belt, very quiet operation safety system: emergency-off safety stop switch (safety lanyard with actuator, pull cord and clip); potential equalization bolt; transformer for potential-isolation from the mains ambient condition: temperature: +10to +40 degrees c, humidity 30 to 70% display (resolution): lcd display heartrate monitoring: wireless transmitter; the treadmill should be able to interface with well-known compatible metabolic gas analyzer as per standard and custom exercise protocols different programs safety harness-1. indispensable accessory for stress testing, accident prevention and for the general safety of athletes.2. safety arch with different heights and widths to fit all running machines.3. an emergency stop at the crossbar of the safety arch allows automatic stop of the running belt in the moment a fall occurs.4. the harness and chest belt (available in 5 sizes: xxs, s, m, l, xl) secure the subject and prevents falling over to the front.5. chest belt straps do not pinch or restrict the athlete", programmable ergometer functional design and excellent stability, load up to 160kg. easy to use saddle, handle bar and pedals speed independent and dependent power control handle bars are easy to change to suit different tests, rotatable by 360 degrees. mechanical/motor-a
Tender For supply of purchase & commissioning of globe control valve for pouring control system, application no. a0901054 ecotrol series with actuator and accessories -830 wp & upt. body material a216wcb and actuat or ui-20, size- 50/2''rating sch 150 lbs. make-forbes marshall. [ warranty period: 30 months after the d ate of delivery ]
Tender For supply of procurement of various tools for mt section c c - three leg puller size 6 8 10 12 01 nos each item , open end spanner , tyre lever , screw driver , tool box , cutting plier 6 and 12 , wire cutter , wire insulation remover , nose plier , chisal 6mm 12mm 28mm and 32mm , center punch , electrical tool kit , grinding machine with blades , welding machine with safety equipments , grip plier , alloy steel drive system square, phillips finish type powder coated number of pieces 5 , ball pin hammer 250gm 500gm 4kg and 10kg , number and letter punch , drill machine , truck and bus manual wheel nut removing , torex bit socket , haxo with high speed blades , tapanddie , pipe wrench , heavy duty scissor , l and key set , adjustable wrencjh 24 inch and 12 inch , soldering iron with wire, standand flux , pneumatic wheel nut remover , washer with stand heavy duty with accessories , wooden block , steel square t handle , aviation snip , wheel spanner 27x30 and 32x33 , oil filter belt , vacuum cleaner
Tender For supply of extended reach master slave manipulators as per drawing number a 1343 erm 470 and annexure i , spare remotely removable tong as per drawing number b 1343 erm 241 , spare handgrip as per drawing number b 1343 erm 221 , spare control system consisting of control panel with power supply hand grip controller for actuator operation indicator box and complete set of cable harness , spare tape clamp assembly as per drawing number c 1343 erm 407 , spare stainless steel tape as per specifications given in drawing number c 1343 erm 113 , spare stainless steel wire rope as per specifications given in drawing number c 1343 erm 113 , spare booting as per drawing number a 1343 erm 116
Tender For corrigendum : implementation of flood forecasting and early warning system with actuator operating of outfall gates, scada & ocems based monitoring from control room and assessment and management plan of the dwfps and swps with predictive maintenance of existing pumping stations under kmc. (2nd call)