Tender For engaging the agency for third party quality control assurance for engineering works in andhra pradesh industrial infrastructure corporation limited (3rd call)
Tender For supply of wall paneling , king size bed with head rest and side tables , king size bed spring type mattress of thickness 6 inch , tv cabinet 8 x 7 ft , provision of modular wall mounted display unit fabricated from high quality plywood with laminates finish matching interiors , heat insulation sheets , compressive interior finishing with anti dust weather resistance emulsion paint over wall care , provisions of backlight mirrors in the dressing table refurbishment of dressing area with all cupboards , customized 03 seater sofa , customized 01 seater sofa , 32 inch tv , 42 inch tv , temperature control unit , stabilizer 90 volts 130a , floor carpet , center table , pickets with exterior finishing , customized wallpaper , roller blinds , provision of color coordinated window and doors drapery hydraulic operated with double liner fabric matching pelmets inclusive of end fittings 9 x 8 ft , final cleaning, polishing and testing of all fittings and furnitures ensuring a uniform finish and ready for occupation conditions
Tender For selection of agency for providing of third party quality control services for passenger ropeway development works at khammam fort and bhongir fort in telangana
Tender For estimate for 50 kw ndlf connection for deputy director agriculture pesticide quality control laboratory (director - shri ajay kumar anant) under purena zone under city dn. south raipur. 78-63c-5156-25-0010 dt. 01.07.2025 r5663c250408. (63-33-i)estimate for replacement of 01 no. failed/unservicible 11 kv vcb of 11 kv main-ii at 33/11 kv saddu substation under daldal seoni zone of city dn. east raipur. 76-028-5145-25-0099 dt. 16.03.2026 r45028250947. (o&m-198-i)
Tender For supply, installation,testing, and commissioning of construction material testing equipment at quality control laboratory at dharoi dam, ta. satlasana, dist. mehsana
Tender For work of removing old light fittings and installing new light fittings in the quality control divisional and sub-divisional offices, removing old ceilings and installing new false ceilings, laying new flooring and partitions in the computer room, laying flooring in the warehouse branch, and coloring, etc