Get complete information related to latest Terminal Board Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Terminal Board Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Terminal Board Tenders.
Tender For supply of terminalboard assembly for 4.5 kw or 25 kw alternators as per rdso drg. no.rdso/pe/sk/ac/ 0047 of 2004(rev.3) [ warranty period: 30 months after the date of delivery ]
Tender For supply of spacers for terminalboard side suitable for 25kw presstech make unmodified alternators as per presstech part no. sig 2403 6(0) and rdso specification no: rdso/pe/spec/ac/0056-2004(rev-0). make: presstech. [ warranty period: 30 months after the date of deli very ]
Tender For supply of spacers for non-terminalboard side suitable for 25kw presstech make unmodified alternators as per presstech part no. sig 2 4037(0) and rdso specification no: rdso/pe/spec/ac/0056-2004(rev-0). make: presstech. [ warranty period: 30 months after the date of delivery ]
Tender For supply of spacers used in non-terminalboard side and terminalboard side suitable for 25 kw ice make modified alternators as per ice p art no. ic/25023 and rdso specification no: rdso/pe/spec/ac/0056-2014(rev-1). make: ice. [ warranty period: 30 months after the date of delivery ]
Tender For supply of end shield terminalboard end suitable for 25kw presstech make unmodified alternators as per presstech part no. sig 24015 and rdso specification no: rdso/pe/spec/ac/0056-2004(rev-0). make: presstech [ warranty period: 30 months after the date of delivery ]
Tender For supply of emergency feed and battery charging terminalboard (frp-smc) to icf drg no.gs-7-5- 004. [ warranty period: 30 months after the date of delivery ]
Tender For supply of emergency feed terminalboard as per drawing no. cc75082,alt-b packing instruction as per spi205 [ warranty period: 30 months after the date of delivery ]
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - ship; l088 search light horizontal movement malfunctioning l-090 transformer connection terminalboard deform; service provider