Get complete information related to latest Tile Lining Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tile Lining Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tile Lining Work Tenders.
Tender For agumentation of water supply scheme nathu chisti, block guruharsahai, district ferozepur (pb.) (under head nabard-xxx) name of work :- providing and installing of 150mm i/d upto 135 mtr. depth with hand boring, repair of existing ohsr 25 cum, disinfection unit electrically based and repair of pump chamber 3.70 x 4.30m and construction of ihhl, complete in all respects , & providing, laying, cutting, jointing & testing of pvc pipe 10 kg/cm2 for rising main & 6kg/cm2 for distribution. including cost of excavation, dismantling & relaying of dry brick on edge paving, cc flooring, house hold water connection with water meter, pumping machinery, solar panel 3kw, development of water works site i.e. corner pillars, barbed wire fencing, fencing poles, d-hooks, gate pillars, foot path, concrete sign board, including carriage of material complete in all respect.(completion period 6 month)
Tender For dnit for internal improvement works of cluster section no. s-364 (package-12) for water supply schemes 1. badal ke uttar, 2. rukna qasim, block guruharsahai & distt. ferozepur (under state share/jjm) name of work :- "construction of rcc ohsr 25000 ltrs capacity with sill level not less than 16.50 mtr. and height upto fsl 18.20 mtr from formation level, repair of existing 100 cum ohsr, disinfection unit electrically based and construction of pump chamber 3.05 x 3.70m including gravil pit and construction of ihhl complete in all respects, repair of existing pump chamber 3.70 x 4.30 mtr., providing, laying, cutting, jointing & testing of pvc pipe 6kg/cm2 for distribution. including cost of excavation, dismantling & relaying of dry brick on edge paving and dismantling of metalled road, cc flooring, house hold water connection with water meter & development of water works site etc. complete in all respect and all other works contgent there to". (completion period 10 month)