Web Analytics Made Easy - StatCounter

Track Ballast Tenders

Get complete information related to latest Track Ballast Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Track Ballast Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Track Ballast Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38186550 Due date: 03 Dec, 202403 Dec, 2024 NA
Tender For supplying and stacking 65 mm gauge stone ballast machine crushed (hard stone) conforming to rdso specification along the cess, including station yards,disposal of unusable boulders & debris, between bari sadri (excl) from km: 0.785 to nimach (excl) km: 46.278 in connection with bari-sadri nimach new line poroject.

Central Government/Public Sector

CTN :38186618 Due date: 04 Dec, 202404 Dec, 2024 NA
Tender For supplying, stacking and loading into railway hoppers of machine crushed ballast as perrevised specification rdso/ irse-ge-i of june 2016 with latest amendment at wtr depotunder aden/ str's section (re-invite).

Central Government/Public Sector

CTN :38186684 Due date: 05 Dec, 202405 Dec, 2024 NA
Tender For trd work in connection with luni-samdari: trr(p)-48.53 km & samdari-bhildi- trr(p)- 10km & through ballast recoupment 11.553 (kolayat - phalodi - 5.253 km, phalodi by pass - 1.300 km & pokran - triangle - 5.000 km) of jodhpur division

CTN :38186697 Due date: 06 Dec, 202406 Dec, 2024 NA
Tender For supply & loading into railway wagons/ hoppers 55,247cum of 50 mm size machine crushed hard stone track ballast for ballast supply at lohardaga (lad) for ranchi division of s.e. railway (measurement will be done at destination).

Central Government/Public Sector

CTN :38186700 Due date: 09 Dec, 202409 Dec, 2024 NA
Tender For den/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.

Central Government/Public Sector

CTN :38186713 Due date: 09 Dec, 202409 Dec, 2024 NA
Tender For den/south/sbc sec : manufacturing, supply and stacking of machine crushed track ballast at prnt depot (periya nagathunnai) (33,000 cum) including loading, in connection with the work of sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52 kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 22.0 km from km 23/000-45/000 (sl) in aden/dpj section

Central Government/Public Sector

CTN :38193321 Due date: 09 Dec, 202409 Dec, 2024 NA
Tender For sw i : chikbanavara - hassan section : through fitting renewal (without erc) for a length of 40.8 km from 124/000-164/800 (sl). sw ii : chikbanavara - hassan section : through ballast recoupment for a length of 110 km from 14/000-124/000 (sl)

Central Government/Public Sector

CTN :38197020 Due date: 05 Dec, 202405 Dec, 2024 NA
Tender For hubballi division :supply of ballast at kotturu (kty) depot in sr.den/east/ubl jurisdiction .{note - ballast test certificate required}

Central Government/Public Sector

CTN :38197291 Due date: 09 Dec, 202409 Dec, 2024 NA
Tender For chikbanavara - hassan section : sw i : construction of rcc drain for a length of 2.2 km in scattered locations between km 5/500-55/300 in aden/kunnigal section. sw ii : construction of rcc side drain 1000m and ballast retaining wall 1000m in connection with the work of baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months

Central Government/Public Sector

CTN :38197292 Due date: 09 Dec, 202409 Dec, 2024 NA
Tender For sw i : bengaluru-salem section : construction of rcc drain 600m in connection with the work of sbc-sa sec : strengthening of bank by providing standard width and improving drainage at isolated locations from km 68/100 to 143/400 sl for a length of 17.26 km. sw ii : bengaluru - salem section : construction of rcc drain 3000m and ballast retaning wall 1900m in connection with the work of sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. maintenance period is 6 months
 Loading, Please wait...

Connect us via What's Up